Angelito M. Perez
- License
- C68198
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C68198 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- South Bay Consulting Engr
- Based in
- El Sobrante
- On San Francisco permits
- Oct 2011 to Nov 2026
37 permits since 2000 (engineer on 29 permits, architect on 8 permits): 22 completed, 9 in progress, 1 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Regency General Contractors Inc (4), Pineda Construction Inc (3), Expert Home Builders Inc (2), J N Construction (2), Reliable Construction Inc (2), 3serg Homebuilder Inc, A Tamam Construction Inc., Alltrade Hi - Tech Construction, Be Home Remodeling Inc, Ea Home Builders Inc, Gadi Construction Inc, Jolo Construction(See Note), Pardis Construction Inc, Parkson Construction Company, Quan Remodeling Company, Rp Restoration Llc, San's Construction, Valley Boutique Builders Inc
- Architects
- Hamid Kaboodanian, Mark Topetcher, Meng Hsiu Chen
- Engineers
- Xiaopei Qi
Where they worked
- Single-family 20
- Multi-family (2-family, apartments) 10
- Commercial 6
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 3974 22nd St | Valley Boutique Builders Inc | kitchen & bathrooms remodel. remodel bedroom #1 in main level, remodel bedroom #3 in main level. new laundry in main level. remodel in 2nd level, remodel kitchen in 2nd level. replace windows in 2nd level(like for like) new sidings in frontDetails
kitchen & bathrooms remodel. remodel bedroom #1 in main level, remodel bedroom #3 in main level. new laundry in main level. remodel in 2nd level, remodel kitchen in 2nd level. replace windows in 2nd level(like for like) new sidings in front | $150,000 |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 2725 Clement St | rev to pa#202211106256. legalization: garden shade struc for (n) laundry area & ev charging station @ rear. provide (e) roof shingles, provide 1-hr fire resistive wall on right side. extended garage @ front. (n) 1-hr fire rated wall & door btw garage & dining/adu @ g/f. re-oriented kitchen & doorsDetails
rev to pa#202211106256. legalization: garden shade struc for (n) laundry area & ev charging station @ rear. provide (e) roof shingles, provide 1-hr fire resistive wall on right side. extended garage @ front. (n) 1-hr fire rated wall & door btw garage & dining/adu @ g/f. re-oriented kitchen & doors | $10,000 | |
| Aug 19, 2026 | In progress issued Sep 2026 | 3620 Ulloa St | Reliable Construction Inc | infill of (e) space under (e) 2nd floor. garage conversion into livable space. new bathroom.Details
infill of (e) space under (e) 2nd floor. garage conversion into livable space. new bathroom. | $85,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 474 02nd Av | Be Home Remodeling Inc | revise pa# 202605010538 (sheet a-2): revise 3rd & 4th fl bathroom and kitchen configurations. no change in plumbing fixture count.Details
revise pa# 202605010538 (sheet a-2): revise 3rd & 4th fl bathroom and kitchen configurations. no change in plumbing fixture count. | $5 |
| May 5, 2026 | In progress filed May 2026, not yet issued | 4272 26th St | significant kitchen remodel including the removal of load bearing and non-load bearing walls, installation of new framing members, shearwall and foundation elements.Details
significant kitchen remodel including the removal of load bearing and non-load bearing walls, installation of new framing members, shearwall and foundation elements. | $30,000 | |
| Mar 24, 2026 | In progress issued Apr 2026 | 331 Ellsworth St | A Tamam Construction Inc. | replace exterior guard rail. re-water proofing deck area.Details
replace exterior guard rail. re-water proofing deck area. | $12,000 |
| Feb 3, 2026 | Completed final sign-off Feb 2026 | 221 11th St | Rp Restoration Llc | revise p/a's to 2024-0705-55875, 2024-0927-1800 and recommencement p/a 2026-0127-4650 to document the exxclusion of elevator upgrade from the previously approved scope of work.Details
revise p/a's to 2024-0705-55875, 2024-0927-1800 and recommencement p/a 2026-0127-4650 to document the exxclusion of elevator upgrade from the previously approved scope of work. | |
| Oct 9, 2025 | Completed final sign-off May 2026 | 2290 26th Av | Reliable Construction Inc | remove interior wall between the dining room and the kitchenDetails
remove interior wall between the dining room and the kitchen | $9,000 |
| Dec 23, 2024 | Expired or cancelled withdrawn Jun 2025 | 610 Rhode Island St | Alltrade Hi - Tech Construction | remove (e) spiral staircase and install nibav lift (elevator) . install 220 electrical outlet. change toilet on 2/f.Details
remove (e) spiral staircase and install nibav lift (elevator) . install 220 electrical outlet. change toilet on 2/f. | $3,500 |
| May 6, 2024 | Expired or cancelled cancelled Oct 2024 | 270 London St | revision to 202310239255. eliminated the landing on 2nd story. deck stay same sf as approved planDetails
revision to 202310239255. eliminated the landing on 2nd story. deck stay same sf as approved plan | ||
| Jan 24, 2024 | In progress filed Jan 2024, not yet issued | 115 Madrid St | Pineda Construction Inc | create 1 new accessory dwelling unit at (e) basement with 1 living room, 2 bedrooms, toilet and 1 kitchen.Details
create 1 new accessory dwelling unit at (e) basement with 1 living room, 2 bedrooms, toilet and 1 kitchen. | $35,000 |
| Dec 27, 2023 | Completed final sign-off Aug 2024 | 119 Gennessee St | Parkson Construction Company | rev to pa202312051954: 1/f: 2 new bedrooms, new media and bathroom, 3 new openings at side, non visible to street and voluntary foundation upgrade (streghten for new conditioned space on 1/f).Details
rev to pa202312051954: 1/f: 2 new bedrooms, new media and bathroom, 3 new openings at side, non visible to street and voluntary foundation upgrade (streghten for new conditioned space on 1/f). | $190,000 |
| Nov 3, 2023 | In progress issued Dec 2023 | 76 Gaviota Wy | Expert Home Builders Inc | new rear deck. 100 sqft. | $25,000 |
| Oct 23, 2023 | In progress issued Jan 2024 | 270 London St | Ea Home Builders Inc | new deck and railing. | $45,000 |
| Oct 12, 2023 | Completed final sign-off Oct 2024 | 180 Church St | Pineda Construction Inc | comply w/ nov 202173282 repair fire damage on g/f restaurant. fire & water damage thru out interior walls & ceiling finishes sustained smoke & fire famage. no structure damage (remodel in the future new t.i. under separate permit demo only).Details
comply w/ nov 202173282 repair fire damage on g/f restaurant. fire & water damage thru out interior walls & ceiling finishes sustained smoke & fire famage. no structure damage (remodel in the future new t.i. under separate permit demo only). | $6,000 |
| Aug 29, 2023 | Completed final sign-off Sep 2023 | 600 Excelsior Av | rev to pa 202210184543: add shower pan to powder room per as-built on 2/f.Details
rev to pa 202210184543: add shower pan to powder room per as-built on 2/f. | $4,000 | |
| Aug 4, 2023 | Completed final sign-off May 2024 | 5312 Mission St | comply with abe business entrance ordianance 51-16. provide door power operated and ada push buttons. abe 201902125115Details
comply with abe business entrance ordianance 51-16. provide door power operated and ada push buttons. abe 201902125115 | $3,000 | |
| Jul 13, 2023 | Completed final sign-off Jul 2024 | 439 Connecticut St | Gadi Construction Inc | remodel kitchen: remove non-=load bearing wall - verified by engineer on-site.cDetails
remodel kitchen: remove non-=load bearing wall - verified by engineer on-site.c | $25,000 |
| Mar 7, 2023 | Completed final sign-off Jan 2025 | 820 Clement St | comply with nov 202305528 emergency roof repair in-kind. voluntarily sister lvl to existing ceiling joist. minor ada improvement per da checklist. new plywood sheathing and gypsum board where roof occursDetails
comply with nov 202305528 emergency roof repair in-kind. voluntarily sister lvl to existing ceiling joist. minor ada improvement per da checklist. new plywood sheathing and gypsum board where roof occurs | $30,000 | |
| Oct 20, 2022 | Expired or cancelled withdrawn Sep 2024 | 113 Majestic Av | Expert Home Builders Inc | new back deck. no steps for the deck. open 2 windows to be doors per plan.Details
new back deck. no steps for the deck. open 2 windows to be doors per plan. | $30,000 |
| Oct 18, 2022 | Completed final sign-off Aug 2023 | 327 Russia Av | Quan Remodeling Company | unit 1 - remodel kitchen, relocate bath, remodel bedrms & dining rm by replacing sheetrock 5/8" typx on all ceilings and exterior walls & 1/2" typ on other walls; unit 2 remodel kitchen, relocate bath, (n) 1/2 bath, remodel living, bedrm and dining rm w 5/8" typ x on all ceiling & exterior wallsDetails
unit 1 - remodel kitchen, relocate bath, remodel bedrms & dining rm by replacing sheetrock 5/8" typx on all ceilings and exterior walls & 1/2" typ on other walls; unit 2 remodel kitchen, relocate bath, (n) 1/2 bath, remodel living, bedrm and dining rm w 5/8" typ x on all ceiling & exterior walls | $85,000 |
| Oct 18, 2022 | Completed final sign-off Sep 2023 | 600 Excelsior Av | revision to pa 2022-0329-1163 infill @ rear less than 10' in height (one story)Details
revision to pa 2022-0329-1163 infill @ rear less than 10' in height (one story) | $10,000 | |
| Sep 16, 2022 | Completed final sign-off Nov 2022 | 60 Desmond St | 2/f: remodel 1 bathroom and add 2 bathrooms, framing closets. no other work performed.Details
2/f: remodel 1 bathroom and add 2 bathrooms, framing closets. no other work performed. | $30,000 | |
| Aug 5, 2022 | Expired or cancelled expired Sep 2024 | 180 Yerba Buena Av | Pardis Construction Inc | replace existing builtop shed roof over 2 exterior stucco faced walls with 3 sided glass enclosure with metal frame. west wall to remain as is. new glass door to existing landing. demo existing bar, restroom and bath.Details
replace existing builtop shed roof over 2 exterior stucco faced walls with 3 sided glass enclosure with metal frame. west wall to remain as is. new glass door to existing landing. demo existing bar, restroom and bath. | $40,000 |
| Jun 21, 2022 | Completed final sign-off Dec 2024 | 72 Somerset St | to comply with nov# 202289003. rearrange (e) bath on ground floor. (n) media , office, den and wet bar. no other work perform.Details
to comply with nov# 202289003. rearrange (e) bath on ground floor. (n) media , office, den and wet bar. no other work perform. | $40,000 | |
| May 9, 2022 | Completed final sign-off Nov 2024 | 2727 Clay St | J N Construction | unit #4: 1 bath to 2 bathrooms. non-structural only.Details
unit #4: 1 bath to 2 bathrooms. non-structural only. | $30,000 |
| Mar 25, 2022 | Completed final sign-off Jun 2022 | 1921 Rivera St | ref complaint 202287487: replace (e) retaining wallat rear in-kind with new 3-feet 3 retaining wall. all work peformed at rear yard.Details
ref complaint 202287487: replace (e) retaining wallat rear in-kind with new 3-feet 3 retaining wall. all work peformed at rear yard. | $18,000 | |
| Mar 17, 2022 | Completed final sign-off Dec 2024 | 2727 Clay St | J N Construction | unit #3: add 1 bathroom and 1 bedroom on 2nd floor. replace furnace in-kindDetails
unit #3: add 1 bathroom and 1 bedroom on 2nd floor. replace furnace in-kind | $15,000 |
| Jul 10, 2020 | Completed final sign-off Mar 2021 | 382 21st Av | Pineda Construction Inc | 2/f -ti for dance stuio as per cua to establish a service instructional use (dba dance training center/sf) within a 6969sqft 2nd fl & mezz lvl of (e) vacant space to include new partitions walls, 4 dance studios, dressing rooms, office & lounge area. maher naDetails
2/f -ti for dance stuio as per cua to establish a service instructional use (dba dance training center/sf) within a 6969sqft 2nd fl & mezz lvl of (e) vacant space to include new partitions walls, 4 dance studios, dressing rooms, office & lounge area. maher na | $70,000 |
| Oct 31, 2019 | Completed final sign-off Oct 2021 | 1241 26th Av | 3serg Homebuilder Inc | 1st floor: remodel extg bathroom. remodel and relocate extg bathroom. addition new bathroom. relocate extg bedroom. addition new family room. remodel and relocation extg laundry. 2nd floor: remodel 2 extg bathrooms, remodel extg kitchen. removal of extg bedroom.Details
1st floor: remodel extg bathroom. remodel and relocate extg bathroom. addition new bathroom. relocate extg bedroom. addition new family room. remodel and relocation extg laundry. 2nd floor: remodel 2 extg bathrooms, remodel extg kitchen. removal of extg bedroom. | $150,000 |
| May 22, 2019 | Completed final sign-off Jan 2023 | 25 Junipero Serra Bl | Jolo Construction(See Note) | kitchen remodel, bathroom remodel and enclosure of (e) open area of 164 sqftDetails
kitchen remodel, bathroom remodel and enclosure of (e) open area of 164 sqft | $100,000 |
| Dec 10, 2012 | Completed final sign-off Feb 2013 | 1221 Funston Av | Regency General Contractors Inc | unit#201. kitchen & bath remodeling w/ gas washer/dryer. retrofit in this unit only. lighting to comply w/ cec 150k 8-10. no change to exhaust system.Details
unit#201. kitchen & bath remodeling w/ gas washer/dryer. retrofit in this unit only. lighting to comply w/ cec 150k 8-10. no change to exhaust system. | $30,000 |
| Dec 10, 2012 | Completed final sign-off Jan 2013 | 1201 Funston Av | Regency General Contractors Inc | unit #305 - kitchen & bath remodleing w/gas washer/dryer retrofit. lighting to comply w/cec 150k 8-10 no change to exhaust system.Details
unit #305 - kitchen & bath remodleing w/gas washer/dryer retrofit. lighting to comply w/cec 150k 8-10 no change to exhaust system. | $30,000 |
| Dec 10, 2012 | Expired or cancelled cancelled Jan 2013 | 1241 Funston Av | Regency General Contractors Inc | unit#201. kitchen & bath remodeling w/ gas washer/dryer. retrofit in this unit only. lighting to comply w/ cec 150k 8-10. no change to exhaust system.Details
unit#201. kitchen & bath remodeling w/ gas washer/dryer. retrofit in this unit only. lighting to comply w/ cec 150k 8-10. no change to exhaust system. | $30,000 |
| Dec 10, 2012 | Completed final sign-off Feb 2013 | 1200 14th Av | Regency General Contractors Inc | unit#308. kitchen & bath remodeling w/ gas washer/dryer. retrofit in this unit only. lighting to comply w/ cec 150k 8-10. no change to exhaust system.Details
unit#308. kitchen & bath remodeling w/ gas washer/dryer. retrofit in this unit only. lighting to comply w/ cec 150k 8-10. no change to exhaust system. | $30,000 |
| Nov 16, 2011 | Completed final sign-off Dec 2011 | 814 Irving St | San's Construction | relocate e prep sink and hand sink. install new kitchen equipment, deli showcase, grille, fryer, ovens, proofer, under counter refrigerator, stainless steel table. new tenant - sheng kee bakeryDetails
relocate e prep sink and hand sink. install new kitchen equipment, deli showcase, grille, fryer, ovens, proofer, under counter refrigerator, stainless steel table. new tenant - sheng kee bakery | $8,000 |
| Oct 3, 2011 | Never finaled issued Oct 2011, no final | 805 Grant Av | ti remodel for new cafe/deli/grocery shop. install new r panel glass automatic doors with auto opener for accessibility, new counters, install kitchen equipment, appliances. update e restroom for accessibilityDetails
ti remodel for new cafe/deli/grocery shop. install new r panel glass automatic doors with auto opener for accessibility, new counters, install kitchen equipment, appliances. update e restroom for accessibility | $48,000 |