Block 1737, lot 012
1241 Funston Ave
- City’s use
- Multi-Family Residential
- Built
- 1959
- Stories
- 3
- Units
- 24
- Rooms
- 27 bathrooms
- Building
- 18,858 sq ft
- Lot
- 11,739 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
40 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2022 | Completed final sign-off Aug 2022 | 1241 Funston Av | Centro A Construction Inc | unit e208: replace kitchen + bath cabinets top plus fixtures. line for line renovations upgrade electrical to code + add electrical plumbing for w/d frame current closet for w/d installation.Details
unit e208: replace kitchen + bath cabinets top plus fixtures. line for line renovations upgrade electrical to code + add electrical plumbing for w/d frame current closet for w/d installation. | $30,000 |
| Aug 13, 2021 | Completed final sign-off Dec 2023 | 1241 Funston Av | Bay Cities Pyrotector Inc | 1:1 replace(e) fa system w/wired initiating devices & wireless notif devices. install (n) intelligent facp & wireless lf horns in all living & bedrms.1 nfs-320 facp, 3wireless gateways, 7pullstations, 6hds, 4sds, 10 intelligent detector bases, 54lf sounders, 54wireless wall bases, 1mm, 4cr modulesDetails
1:1 replace(e) fa system w/wired initiating devices & wireless notif devices. install (n) intelligent facp & wireless lf horns in all living & bedrms.1 nfs-320 facp, 3wireless gateways, 7pullstations, 6hds, 4sds, 10 intelligent detector bases, 54lf sounders, 54wireless wall bases, 1mm, 4cr modules | $57,212 |
| Sep 21, 2018 | Never finaled issued Sep 2018, no final | 1241 Funston Av | Monterey Construction Company | #e303- replace kitchen and bathroom cabinets. no alteratio to walls, windows, doors. (e) layout to remain unchanged. add laundry box. no change to occupancy, egress or modification to common areas. no fire alarm or fire sprinklers.Details
#e303- replace kitchen and bathroom cabinets. no alteratio to walls, windows, doors. (e) layout to remain unchanged. add laundry box. no change to occupancy, egress or modification to common areas. no fire alarm or fire sprinklers. | $30,000 |
| Jun 19, 2018 | Never finaled issued Jun 2018, no final | 1241 Funston Av | Monterey Construction Company | #e304 - kitchen and bath remodel, per plans. add laundry.Details
#e304 - kitchen and bath remodel, per plans. add laundry. | $29,000 |
| Mar 9, 2017 | Completed final sign-off Mar 2017 | 1241 Funston Av | Monterey Construction Company | apt e206: address correction for pa#201701268027.Details
apt e206: address correction for pa#201701268027. | |
| Dec 2, 2016 | Never finaled issued Dec 2016, no final | 1241 Funston Av | Bay Cities Pyrotector Inc | fire alarm system upgrade, installation of one smoke detector, one h/s (wall mount; one h/s (ceiling mount.Details
fire alarm system upgrade, installation of one smoke detector, one h/s (wall mount; one h/s (ceiling mount. | |
| Jun 30, 2016 | Completed final sign-off Dec 2016 | 1241 Funston Av | Cornerstone Select Builders Inc | revision to app#2016-01-12-6926: mep sheets added. glass walls changed to solid walls.Details
revision to app#2016-01-12-6926: mep sheets added. glass walls changed to solid walls. | |
| Jun 8, 2016 | Never finaled issued Jun 2016, no final | 1241 Funston Av | Bay Cities Pyrotector Inc | relocate fire sprinkler in elevator equipment room to be within 24" of new heat detector used in elevator recallDetails
relocate fire sprinkler in elevator equipment room to be within 24" of new heat detector used in elevator recall | $1,860 |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 1241 Funston Av | Monterey Construction Company | apt e106: revision to pa 2016-0304-1202. previous plan did not have correct plan of existing/proposed layout. re-submit per inspector.Details
apt e106: revision to pa 2016-0304-1202. previous plan did not have correct plan of existing/proposed layout. re-submit per inspector. | |
| Mar 4, 2016 | Completed final sign-off Apr 2016 | 1241 Funston Av | Monterey Construction Company | unit #e106 - kitchen & bath remodel, no structural, add washer & dryer.Details
unit #e106 - kitchen & bath remodel, no structural, add washer & dryer. | $29,000 |
| Jan 12, 2016 | Completed final sign-off Dec 2016 | 1241 Funston Av | Cornerstone Select Builders Inc | add use - new 500 sq ft fitness room.Details
add use - new 500 sq ft fitness room. | $75,000 |
| Jun 10, 2015 | Completed final sign-off Jul 2015 | 1241 Funston Av | Monterey Construction Company | unit e307: kitchen and bath remodel. no walls. no structural. add washer and dryer.Details
unit e307: kitchen and bath remodel. no walls. no structural. add washer and dryer. | $21,000 |
| Apr 20, 2015 | Never finaled issued Jul 2015, no final | 1241 Funston Av | Bay Cities Pyrotector Inc | modification of elevator recall monitoring. install 1 smoke,1 heat detector,4 relay modules in elevator machine rm @ pkg structure. install 1 smoke, 1 heat detector in elevator shaft located on 3rd fl. (e) heat/smoke detectors @ elevator lobby -program for elevator recall function.#201311152054.Details
modification of elevator recall monitoring. install 1 smoke,1 heat detector,4 relay modules in elevator machine rm @ pkg structure. install 1 smoke, 1 heat detector in elevator shaft located on 3rd fl. (e) heat/smoke detectors @ elevator lobby -program for elevator recall function.#201311152054. | $4,016 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 1241 Funston Av | Gorman Roofing Services Inc | reroofingDetails
reroofing | $34,858 |
| Feb 20, 2015 | Completed final sign-off Feb 2016 | 1241 Funston Av | B K B Construction Lp | new trash enclosure fence at garage levelDetails
new trash enclosure fence at garage level | $2,000 |
| Nov 18, 2014 | Completed final sign-off Feb 2016 | 1241 Funston Av | B K B Construction Lp | replacement of existing stairDetails
replacement of existing stair | $10,000 |
| Jun 18, 2014 | Completed final sign-off Aug 2014 | 1241 Funston Av | Monterey Construction Company | #e302 - kitchen & bath remodel, no walls or structural change, add washer/dryer.Details
#e302 - kitchen & bath remodel, no walls or structural change, add washer/dryer. | $18,000 |
| Feb 10, 2014 | Completed final sign-off Mar 2014 | 1241 Funston Av | Monterey Construction Company | uint e-104 kitchen and bath remodel. add new washer/dryerDetails
uint e-104 kitchen and bath remodel. add new washer/dryer | $18,000 |
| Nov 18, 2013 | Completed final sign-off Feb 2014 | 1241 Funston Av | Monterey Construction Company | unit #e207 - kitchen & bath remodel, add washer & dryer closet; replace furnace.Details
unit #e207 - kitchen & bath remodel, add washer & dryer closet; replace furnace. | $18,000 |
| Nov 18, 2013 | Completed final sign-off Dec 2013 | 1241 Funston Av | Monterey Construction Company | unit e-101 remodel kitchen and bathroom; add washer and dryer in utility exhaust on side of unit. no structural - no walls. provide/verify louvered door for dryer.Details
unit e-101 remodel kitchen and bathroom; add washer and dryer in utility exhaust on side of unit. no structural - no walls. provide/verify louvered door for dryer. | $18,000 |
| Nov 15, 2013 | Completed final sign-off Sep 2014 | 1241 Funston Av | Bay Cities Pyrotector Inc | fire alarm system repalcement- smae for smae per csfm bulletin dated 9/4/2008.Details
fire alarm system repalcement- smae for smae per csfm bulletin dated 9/4/2008. | |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 1241 Funston Av | Monterey Construction Company | unit# e202: kitchen and bath remodel, add washer and dryerDetails
unit# e202: kitchen and bath remodel, add washer and dryer | $18,000 |
| May 31, 2013 | Completed final sign-off Oct 2013 | 1241 Funston Av | Monterey Construction Company | remodel in unit e-102, kitchen and bath remodel. add washer and dryer and wall. replace hvac and bath fan. new electrical panel. no struct. frame wall for laundry box.Details
remodel in unit e-102, kitchen and bath remodel. add washer and dryer and wall. replace hvac and bath fan. new electrical panel. no struct. frame wall for laundry box. | $22,000 |
| May 31, 2013 | Completed final sign-off Oct 2013 | 1241 Funston Av | Monterey Construction Company | remodel in unit e-306, kitchen and bath remodel. add washer and dryer and wall. replace hvac and bath fan. new electrical panel. no struct. frame wall for laundry box.Details
remodel in unit e-306, kitchen and bath remodel. add washer and dryer and wall. replace hvac and bath fan. new electrical panel. no struct. frame wall for laundry box. | $22,000 |
| Jan 7, 2013 | Completed final sign-off Feb 2013 | 1241 Funston Av | Regency General Contractors Inc | unit #208-kitchen & bathroom remodeling with gas washer & dryer. lighting to comply with cec 150k, 8-10 no change to exhaust systemDetails
unit #208-kitchen & bathroom remodeling with gas washer & dryer. lighting to comply with cec 150k, 8-10 no change to exhaust system | $30,000 |
| Dec 10, 2012 | Expired or cancelled cancelled Jan 2013 | 1241 Funston Av | Regency General Contractors Inc | unit#201. kitchen & bath remodeling w/ gas washer/dryer. retrofit in this unit only. lighting to comply w/ cec 150k 8-10. no change to exhaust system.Details
unit#201. kitchen & bath remodeling w/ gas washer/dryer. retrofit in this unit only. lighting to comply w/ cec 150k 8-10. no change to exhaust system. | $30,000 |
| Oct 9, 2012 | Completed final sign-off Dec 2012 | 1241 Funston Av | Regency General Contractors Inc | kitchen and bath remodel with gas washer/dryter retrofit in unit108,204, 205, 201. lighting t0 comply with cec150k 8-10 no change to exaust systemDetails
kitchen and bath remodel with gas washer/dryter retrofit in unit108,204, 205, 201. lighting t0 comply with cec150k 8-10 no change to exaust system | $30,000 |
| Jul 20, 2012 | Completed final sign-off Jul 2012 | 1241 Funston Av | Strong Builders Construction Inc. | to obtain final inspection for work approved under pa#201105206479 all work is complete. original scope of work, r/r approx. 1200 sq.ft. of plaster, r/r 12 ea windows, not visable from street.Details
to obtain final inspection for work approved under pa#201105206479 all work is complete. original scope of work, r/r approx. 1200 sq.ft. of plaster, r/r 12 ea windows, not visable from street. | |
| May 20, 2011 | Expired or cancelled expired Jun 2012 | 1241 Funston Av | Strong Builders Construction Inc. | remove & replace 12 windows & approx 1200 s.f. (e) cement plaster. replace in kind. not visible from street.Details
remove & replace 12 windows & approx 1200 s.f. (e) cement plaster. replace in kind. not visible from street. | $22,000 |
| Aug 25, 2009 | Completed final sign-off Dec 2009 | 1241 Funston Av | Jab Construction Company Ltd | replace dry rotted cantilevered balcony joists and deckboards in kind. replace sliding glass door in kind. patch interuior drywall. patch exterior stucco in kind and paint all repairs. re-install existing railings. work in unit 203.Details
replace dry rotted cantilevered balcony joists and deckboards in kind. replace sliding glass door in kind. patch interuior drywall. patch exterior stucco in kind and paint all repairs. re-install existing railings. work in unit 203. | $6,500 |
| Apr 8, 2008 | Completed final sign-off Jun 2008 | 1241 Funston Av | Jab Construction Company Ltd | work @ unit# 204 only. remove & replace 2 bedroom windows. size for size in kind. patch drywall & stucco in kind. prime & paint. all repairs. u value 0.67.Details
work @ unit# 204 only. remove & replace 2 bedroom windows. size for size in kind. patch drywall & stucco in kind. prime & paint. all repairs. u value 0.67. | $6,000 |
| Apr 8, 2008 | Completed final sign-off Jun 2008 | 1241 Funston Av | Jab Construction Company Ltd | work @ unit# 201 only. remove & replace 3 bedroom windows. size for size in kind. patch drywall & stucco in kind. prime & paint. all repairs. (not visible from street) u value 0.67.Details
work @ unit# 201 only. remove & replace 3 bedroom windows. size for size in kind. patch drywall & stucco in kind. prime & paint. all repairs. (not visible from street) u value 0.67. | $3,800 |
| Jan 18, 2008 | Completed final sign-off Mar 2008 | 1241 Funston Av | Jab Construction Company Ltd | work on unit#102.remove & replace living room sliding glass window, size for size, in kind. patch drywall & stucco in kind. prime & paint all repairs.Details
work on unit#102.remove & replace living room sliding glass window, size for size, in kind. patch drywall & stucco in kind. prime & paint all repairs. | $1,500 |
| Jul 26, 2007 | Completed final sign-off Dec 2007 | 1241 Funston Av | Jab Construction Company Ltd | repair dryrotted balcony joists and framing in kind.replace sliding glass door in kind. patch drywall and stucco in kind size for size. prime and paint all repairsDetails
repair dryrotted balcony joists and framing in kind.replace sliding glass door in kind. patch drywall and stucco in kind size for size. prime and paint all repairs | $9,500 |
| Jun 1, 2007 | Completed final sign-off Dec 2007 | 1241 Funston Av | Jab Construction Company Ltd | unit#201 repair <50% dryrotted balcony joists ( cantilevered) & framing in kind. replace sliding glass door in kind. patch around doors. drywall and stucco in kind size for size. unit#101. repalce sliding glass door in kind size for size. patch drywall and stucco in kind size for size. prime andDetails
unit#201 repair <50% dryrotted balcony joists ( cantilevered) & framing in kind. replace sliding glass door in kind. patch around doors. drywall and stucco in kind size for size. unit#101. repalce sliding glass door in kind size for size. patch drywall and stucco in kind size for size. prime and | $16,000 |
| Sep 22, 2006 | Completed final sign-off Oct 2006 | 1241 Funston Av | Jab Construction Company Ltd | repair dryrot damage to deck josts, for unit#206 sheerwall & framing in kind. replace (1) sliding glass door in kind patch interior drywall & exterior stucco in kind. all work in unit#206. all work not facing street. no exits involed. no sceeping areas affected fire.Details
repair dryrot damage to deck josts, for unit#206 sheerwall & framing in kind. replace (1) sliding glass door in kind patch interior drywall & exterior stucco in kind. all work in unit#206. all work not facing street. no exits involed. no sceeping areas affected fire. | $12,500 |
| May 11, 2004 | Completed final sign-off May 2004 | 1241 Funston Av | Jab Construction Company Ltd | remove and replace leaking sliding glass door in kind. replace rotted framing around door in kind.Details
remove and replace leaking sliding glass door in kind. replace rotted framing around door in kind. | $7,200 |
| Feb 25, 2004 | Completed final sign-off Apr 2004 | 1241 Funston Av | Jab Construction Company Ltd | exploratory work on leaking sliding glass door/will do stucco and drywall work at #106Details
exploratory work on leaking sliding glass door/will do stucco and drywall work at #106 | $4,500 |
| Sep 1, 2000 | Completed final sign-off Oct 2000 | 1241 Funston Av | Jab Construction Company Ltd | remove & replace sliding glass doors in kind, patch repair dry wall on interiorDetails
remove & replace sliding glass doors in kind, patch repair dry wall on interior | $15,041 |
| Mar 8, 2000 | Completed final sign-off Mar 2000 | 1241 Funston Av | Jab Construction Company Ltd | repair exterior decks at units 305,302,202 in bldg -1241. work to match existing decks at the bldg.Details
repair exterior decks at units 305,302,202 in bldg -1241. work to match existing decks at the bldg. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.