3serg Homebuilder Inc
- Based in
- San Jose
- On San Francisco permits
- Oct 2019 to Apr 2022
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2022 | Completed final sign-off Apr 2022 | 108 Albion St | replacing exterior door on back of unit #10. in-kind.Details
replacing exterior door on back of unit #10. in-kind. | $650 |
| Mar 30, 2022 | Completed final sign-off Apr 2022 | 108 Albion St | replacing 2 windows facing to the street. double hung wood windows with integrated ogee locks above front entry. replace in (e) openings.Details
replacing 2 windows facing to the street. double hung wood windows with integrated ogee locks above front entry. replace in (e) openings. | $1,500 |
| Aug 23, 2021 | Completed final sign-off Apr 2022 | 108 Albion St | replacing 30 windows for 4 units. new windows are same size of old ones. no facing the street.Details
replacing 30 windows for 4 units. new windows are same size of old ones. no facing the street. | $6,500 |
| Jul 13, 2021 | Never finaled issued Jul 2021, no final | 108 Albion St | interior remodel of 4 existing 2 bedroom residential units: 108, 112, 116, 118. kitchen and bath remodel new closets, laundry room.Details
interior remodel of 4 existing 2 bedroom residential units: 108, 112, 116, 118. kitchen and bath remodel new closets, laundry room. | $130,000 |
| Dec 7, 2020 | Completed final sign-off Jun 2026 | 108 Albion St | (2) ground floor accessory dwelling units per ordinace 162-16. units to be located in existing garage & storage space. ref pa#2016/0428/5904 for soft story retrofit. infill (2) garage doors and add (3) wood windows & (1) entry doors at front facade. no expansion of building envelope.Details
(2) ground floor accessory dwelling units per ordinace 162-16. units to be located in existing garage & storage space. ref pa#2016/0428/5904 for soft story retrofit. infill (2) garage doors and add (3) wood windows & (1) entry doors at front facade. no expansion of building envelope. | $150,000 |
| Oct 31, 2019 | Completed final sign-off Oct 2021 | 1241 26th Av | 1st floor: remodel extg bathroom. remodel and relocate extg bathroom. addition new bathroom. relocate extg bedroom. addition new family room. remodel and relocation extg laundry. 2nd floor: remodel 2 extg bathrooms, remodel extg kitchen. removal of extg bedroom.Details
1st floor: remodel extg bathroom. remodel and relocate extg bathroom. addition new bathroom. relocate extg bedroom. addition new family room. remodel and relocation extg laundry. 2nd floor: remodel 2 extg bathrooms, remodel extg kitchen. removal of extg bedroom. | $150,000 |