Allana Karim
- Listed as
- engineer
- On San Francisco permits
- Jan 2018 to Mar 2025
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 7, 2025 | Completed final sign-off Mar 2026 | 2001 Market St | Abbcm Llc | bldg envelope repairs, gaskets @ op windows and swing doors, saddle repairs, waterproofing walkway edges, slab edges,private balconies, concrete eyebrow roofs,wf parking deck,foundation walls, repair roofing, replach mech, enclose insulation,gaurdrail, gaps 2 pt cable repair on lvl 6Details
bldg envelope repairs, gaskets @ op windows and swing doors, saddle repairs, waterproofing walkway edges, slab edges,private balconies, concrete eyebrow roofs,wf parking deck,foundation walls, repair roofing, replach mech, enclose insulation,gaurdrail, gaps 2 pt cable repair on lvl 6 | $4,593,083 |
| Feb 16, 2024 | Completed final sign-off May 2025 | 1200 04th St | Saarman Construction,Ltd. | block 5 roof memebrane and insulation. demo (e) roof membrane and insulation. provide vapor retarder, roof insulation with single ply roof membrane. repair possible wood rot at (e) wood crickets and wood/deck parapet framing.Details
block 5 roof memebrane and insulation. demo (e) roof membrane and insulation. provide vapor retarder, roof insulation with single ply roof membrane. repair possible wood rot at (e) wood crickets and wood/deck parapet framing. | $3,560,000 |
| Jan 18, 2018 | Never finaled issued Jan 2018, no final | 301 Mission St | W E Lyons Construction Co | remove (e) fire stopping at rise pipes, clean and prep and apply (n) fire stopping.clean and prep surfaces at curtain wall mullions to receive fire seals; install fire blocking inside gaps at vertical mullions; prep, patch and seal exterior wall gaps at curtain wall. ref 201801128507. maher n/a.Details
remove (e) fire stopping at rise pipes, clean and prep and apply (n) fire stopping.clean and prep surfaces at curtain wall mullions to receive fire seals; install fire blocking inside gaps at vertical mullions; prep, patch and seal exterior wall gaps at curtain wall. ref 201801128507. maher n/a. | $10,000 |