Permit GraphShortlistSan Francisco building permits since 2000

Allana Karim

License
C041693
Look the license up with the state
Listed as
engineer
On San Francisco permits
Jan 2018 to Mar 2025

3 permits since 2000 (engineer on 3 permits): 2 completed, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 7, 2025Completed
final sign-off Mar 2026
2001 Market StAbbcm Llcbldg envelope repairs, gaskets @ op windows and swing doors, saddle repairs, waterproofing walkway edges, slab edges,private balconies, concrete eyebrow roofs,wf parking deck,foundation walls, repair roofing, replach mech, enclose insulation,gaurdrail, gaps 2 pt cable repair on lvl 6
Details
Permit
202503071792
Status
complete
Filed
Mar 7, 2025
Permit issued
Jun 20, 2025
Final sign-off
Mar 12, 2026
Declared cost
$4,593,083
Address
2001 Market St

bldg envelope repairs, gaskets @ op windows and swing doors, saddle repairs, waterproofing walkway edges, slab edges,private balconies, concrete eyebrow roofs,wf parking deck,foundation walls, repair roofing, replach mech, enclose insulation,gaurdrail, gaps 2 pt cable repair on lvl 6

Open the permit page

$4,593,083
Feb 16, 2024Completed
final sign-off May 2025
1200 04th StSaarman Construction,Ltd.block 5 roof memebrane and insulation. demo (e) roof membrane and insulation. provide vapor retarder, roof insulation with single ply roof membrane. repair possible wood rot at (e) wood crickets and wood/deck parapet framing.
Details
Permit
202402166064
Status
complete
Filed
Feb 16, 2024
Permit issued
Mar 7, 2024
Final sign-off
May 20, 2025
Declared cost
$3,560,000
Address
1200 04th St

block 5 roof memebrane and insulation. demo (e) roof membrane and insulation. provide vapor retarder, roof insulation with single ply roof membrane. repair possible wood rot at (e) wood crickets and wood/deck parapet framing.

Open the permit page

$3,560,000
Jan 18, 2018Never finaled
issued Jan 2018, no final
301 Mission StW E Lyons Construction Coremove (e) fire stopping at rise pipes, clean and prep and apply (n) fire stopping.clean and prep surfaces at curtain wall mullions to receive fire seals; install fire blocking inside gaps at vertical mullions; prep, patch and seal exterior wall gaps at curtain wall. ref 201801128507. maher n/a.
Details
Permit
201801188883
Status
issued
Filed
Jan 18, 2018
Permit issued
Jan 18, 2018
Declared cost
$10,000
Address
301 Mission St

remove (e) fire stopping at rise pipes, clean and prep and apply (n) fire stopping.clean and prep surfaces at curtain wall mullions to receive fire seals; install fire blocking inside gaps at vertical mullions; prep, patch and seal exterior wall gaps at curtain wall. ref 201801128507. maher n/a.

Open the permit page

$10,000