Albert Fuentes
- Listed as
- authorized agent-others, contractor
- Firm
- Fg Force Construction Inc
- Based in
- Burlingame
- On San Francisco permits
- Oct 2017 to Sep 2026
36 permits since 2000 (contractor on 36 permits, authorized agent-others on 1 permit): 22 completed, 9 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 3973 Clay St | Fg Force Construction Inc | voluntary structural alteration to remove intoier concrete parition in garage. install new stuctural beam and supporting posts per structural drawings. no changes to building footprint or exterior facade or occupancy.Details
voluntary structural alteration to remove intoier concrete parition in garage. install new stuctural beam and supporting posts per structural drawings. no changes to building footprint or exterior facade or occupancy. | $14,000 |
| Jul 14, 2026 | Completed final sign-off Jul 2026 | 2715 40th Av | Fg Force Construction Inc | recommencement and completion of work approved under pa 202208180850.Details
recommencement and completion of work approved under pa 202208180850. | $7,700 |
| Mar 24, 2026 | In progress issued Apr 2026 | 150 Wilde Av | Fg Force Construction Inc | remodel of bathroom, remodel, in kind kitchen, new heat pump. new pocket door between kitchen and laundry. work in rear building.Details
remodel of bathroom, remodel, in kind kitchen, new heat pump. new pocket door between kitchen and laundry. work in rear building. | $75,000 |
| Mar 12, 2026 | In progress issued May 2026 | 1457 Broderick St | Fg Force Construction Inc | remodel kitchen, dining, and bathrooms; add wall in sunroom; add closet in front bedroomDetails
remodel kitchen, dining, and bathrooms; add wall in sunroom; add closet in front bedroom | $80,000 |
| Dec 3, 2025 | Completed final sign-off Jul 2026 | 2715 40th Av | Fg Force Construction Inc | to obtain final inspection for work approved uner pa#202302242600. all work is completeDetails
to obtain final inspection for work approved uner pa#202302242600. all work is complete | |
| Jun 30, 2025 | Completed final sign-off Oct 2025 | 934 Teresita Bl | Fg Force Construction Inc | windows replacement:to replace 7 windows, 2 @ front of the house & 5 windows @ back of the house located in the bathroom and kitchen area.notes: the bathroom & kitchen windows are to be retrofiting windows.the front of the house windows are to be new construction. new windows u-<0.3.Details
windows replacement:to replace 7 windows, 2 @ front of the house & 5 windows @ back of the house located in the bathroom and kitchen area.notes: the bathroom & kitchen windows are to be retrofiting windows.the front of the house windows are to be new construction. new windows u-<0.3. | $12,000 |
| Jun 23, 2025 | Completed final sign-off Aug 2025 | 433 Eureka St | Fg Force Construction Inc | to repair rear back wall and deck damage caused by water leak. the scope of work includes replace damaged framing on the wall and new siding. repair (e) deck as in-kind, less than 50%.Details
to repair rear back wall and deck damage caused by water leak. the scope of work includes replace damaged framing on the wall and new siding. repair (e) deck as in-kind, less than 50%. | $25,000 |
| Dec 10, 2024 | In progress issued Dec 2024 | 1222 33rd Av | Fg Force Construction Inc | revision to 202407055891 1st fl to reconfigure bathroom and laundryDetails
revision to 202407055891 1st fl to reconfigure bathroom and laundry | $4,500 |
| Dec 9, 2024 | In progress issued Jan 2025 | 151 Madison St | Fg Force Construction Inc | revision to 202405011140 to indicate that slab will be 9" below e) slab. ref 202411155081, rev 1Details
revision to 202405011140 to indicate that slab will be 9" below e) slab. ref 202411155081, rev 1 | |
| Nov 15, 2024 | In progress issued Dec 2024 | 151 Madison St | Fg Force Construction Inc | revision to permit 202405011140. change to bathroom layout on 2nd flr. new concrete slab on 1st flr and garage.Details
revision to permit 202405011140. change to bathroom layout on 2nd flr. new concrete slab on 1st flr and garage. | $21,500 |
| Oct 31, 2024 | In progress issued Feb 2025 | 1459 Broderick St | Fg Force Construction Inc | 2/f -remodel kitchen, remodel bathrooms, add 1 new bedroom, build new closet, build (n) storage room on 1/f, replace (e) windows at all visible facades with aluminum wood-clad windows.Details
2/f -remodel kitchen, remodel bathrooms, add 1 new bedroom, build new closet, build (n) storage room on 1/f, replace (e) windows at all visible facades with aluminum wood-clad windows. | $40,000 |
| Aug 9, 2024 | Completed final sign-off Feb 2025 | 1131 Hampshire St | Fg Force Construction Inc | remodel kitchen to include removing non bearing walls and closet. remove chimeny and add full bathroom and closet. remodel (e) bathroom. addition of 3(n) skylights. all work on 2nd floor.Details
remodel kitchen to include removing non bearing walls and closet. remove chimeny and add full bathroom and closet. remodel (e) bathroom. addition of 3(n) skylights. all work on 2nd floor. | $39,500 |
| Jul 5, 2024 | In progress issued Sep 2024 | 1222 33rd Av | Fg Force Construction Inc | remodel 3rd fl bath. remodel 2nd fl kitchen. (n) habitable rooms on 1st fl with half bath. repair front exterior stairs.Details
remodel 3rd fl bath. remodel 2nd fl kitchen. (n) habitable rooms on 1st fl with half bath. repair front exterior stairs. | $77,322 |
| May 2, 2024 | Expired or cancelled expired Jul 2026 | 2715 40th Av | Fg Force Construction Inc | to obtain final inspection for work approved under pa #202208180850 & 202302242600. all work is completeDetails
to obtain final inspection for work approved under pa #202208180850 & 202302242600. all work is complete | |
| May 1, 2024 | In progress issued Jul 2024 | 151 Madison St | Fg Force Construction Inc | 1st fl create new study room, new family and kitchen, new wall btn garage and n habitable space.remove 1 struc column. relate w/h.furnace. 2nd remove wall betwn kitchn/lr.remodel kitchen,new struc beam,redesign interior stair,remode 2 e baths,move int wall.Details
1st fl create new study room, new family and kitchen, new wall btn garage and n habitable space.remove 1 struc column. relate w/h.furnace. 2nd remove wall betwn kitchn/lr.remodel kitchen,new struc beam,redesign interior stair,remode 2 e baths,move int wall. | $240,000 |
| Apr 12, 2024 | Completed final sign-off Feb 2025 | 742 17th Av | Fg Force Construction Inc | build new exterior stair in rear yard. build new deck on 1st fl; rebuild existing deck on 2nd flDetails
build new exterior stair in rear yard. build new deck on 1st fl; rebuild existing deck on 2nd fl | $12,000 |
| Jan 11, 2024 | Completed final sign-off Dec 2025 | 1310 32nd Av | Fg Force Construction Inc | upper unit: kitchen remodel no changes to (e) locations new plumbing, new elec, upgrade all plumbing in the kitchen only and install two new heat pump water heaters, upgrade electrical (kitchen only)repair (e) main elec service to 200 amps main service, replace (2)(e) windows in kindDetails
upper unit: kitchen remodel no changes to (e) locations new plumbing, new elec, upgrade all plumbing in the kitchen only and install two new heat pump water heaters, upgrade electrical (kitchen only)repair (e) main elec service to 200 amps main service, replace (2)(e) windows in kind | $55,000 |
| Jan 4, 2024 | Completed final sign-off Jan 2025 | 422 Moscow St | Fg Force Construction Inc | revision to permit 202204061742. to revise interior floor plan. infill side door at front elevation change, front window replacment uf<0.3Details
revision to permit 202204061742. to revise interior floor plan. infill side door at front elevation change, front window replacment uf<0.3 | |
| May 8, 2023 | Completed final sign-off Mar 2024 | 742 17th Av | Fg Force Construction Inc | remove non loading bearing wall between kitchn and living room. add new beam to ceiling in living room. remodel existing kitchen and bath. new 1/2 bath in bedroomDetails
remove non loading bearing wall between kitchn and living room. add new beam to ceiling in living room. remodel existing kitchen and bath. new 1/2 bath in bedroom | $30,000 |
| Mar 24, 2023 | Never finaled issued Mar 2023, no final | 742 17th Av | Fg Force Construction Inc | upgrade 2 baths and kitchen in kind. new plumb, elec, drywall, tiles, cabinets. 6 new windows, 2 in kitchen, 2 in sunroom and one on each bath. not visible from street. all fixtures to be replaced to code. not visible from street.Details
upgrade 2 baths and kitchen in kind. new plumb, elec, drywall, tiles, cabinets. 6 new windows, 2 in kitchen, 2 in sunroom and one on each bath. not visible from street. all fixtures to be replaced to code. not visible from street. | $30,000 |
| Feb 24, 2023 | Expired or cancelled expired Jul 2026 | 2715 40th Av | Fg Force Construction Inc | rev to pa# 202208180850: revision to approved footing detailDetails
rev to pa# 202208180850: revision to approved footing detail | $100 |
| Feb 2, 2023 | Never finaled issued Mar 2023, no final | 77 Carl St | Fg Force Construction Inc | remodel (e) kitchen. remove (e) wall between kitchen & dining room.Details
remodel (e) kitchen. remove (e) wall between kitchen & dining room. | $40,000 |
| Sep 29, 2022 | Completed final sign-off Nov 2023 | 631 Kansas St | Fg Force Construction Inc | revisio to 202008202200. omit roof deck, add skylights, change space conditioniong to heat pumpsDetails
revisio to 202008202200. omit roof deck, add skylights, change space conditioniong to heat pumps | |
| Aug 18, 2022 | Expired or cancelled expired Jul 2026 | 2715 40th Av | Fg Force Construction Inc | remodel (e) 2/f bath. partition garage to create (n) office and (n) bath on 1/f. replace (e) 1/f beam with (n) steel beam. and (n) sliding glass door and 2 (n) windows to 1/f rear wall at rear yard.Details
remodel (e) 2/f bath. partition garage to create (n) office and (n) bath on 1/f. replace (e) 1/f beam with (n) steel beam. and (n) sliding glass door and 2 (n) windows to 1/f rear wall at rear yard. | $77,000 |
| Apr 6, 2022 | Completed final sign-off Jan 2025 | 422 Moscow St | Fg Force Construction Inc | expand habitable square feet within (e) building envelope at 1st fl. new bathroom, 2 new bedrooms, new interior stair, new laundry, new wall separating garage.Details
expand habitable square feet within (e) building envelope at 1st fl. new bathroom, 2 new bedrooms, new interior stair, new laundry, new wall separating garage. | $34,000 |
| Nov 17, 2020 | Completed final sign-off Oct 2021 | 533 Peralta Av | Fg Force Construction Inc | remodel (e) ktchen. remove (e) load bearing wall. remodel (e) bathroom, rebuild (e) rear deck. to comply with nov # 202058045.Details
remodel (e) ktchen. remove (e) load bearing wall. remodel (e) bathroom, rebuild (e) rear deck. to comply with nov # 202058045. | $25,000 |
| Oct 22, 2020 | Completed final sign-off May 2021 | 338 Missouri St | Fg Force Construction Inc | all work at 3rd fl. kitchen & bathroom remodel, new windows in (e) opening, new closet doors, new lighting & electrical workDetails
all work at 3rd fl. kitchen & bathroom remodel, new windows in (e) opening, new closet doors, new lighting & electrical work | $40,000 |
| Aug 20, 2020 | Completed final sign-off Nov 2023 | 631 Kansas St | Fg Force Construction Inc | renovate (e) sfd. finish g/f to have new wetbar, bathrm, office, living rm, foyer. new stair connection to 2/f - reconfig. 2/f kitchen, add bathrm, add rear deck w/living space below. new roof deck, renovate ext. front & rear facade. horiz. expansion at rear 1/f. infill (e) lightwell. new bay windowDetails
renovate (e) sfd. finish g/f to have new wetbar, bathrm, office, living rm, foyer. new stair connection to 2/f - reconfig. 2/f kitchen, add bathrm, add rear deck w/living space below. new roof deck, renovate ext. front & rear facade. horiz. expansion at rear 1/f. infill (e) lightwell. new bay window | $275,000 |
| Jul 16, 2020 | Completed final sign-off Dec 2020 | 2701 40th Av | Fg Force Construction Inc | remove (e) vinyl windows & install (3) new marvin stone white clad windows, (1) window located at the back of the house, (1) window located at the kitchen area above the sink, (1) window located at the dining room. one of the windows faces wawona & 40th ave, at dining rm to be alumn clad from marvinDetails
remove (e) vinyl windows & install (3) new marvin stone white clad windows, (1) window located at the back of the house, (1) window located at the kitchen area above the sink, (1) window located at the dining room. one of the windows faces wawona & 40th ave, at dining rm to be alumn clad from marvin | $7,500 |
| Feb 11, 2020 | Completed final sign-off Jul 2021 | 1038 Castro St | Fg Force Construction Inc | convert part of basement/garage to living space. partial remodeling of main level. lower back yard for walkout. new windows and new garage door.Details
convert part of basement/garage to living space. partial remodeling of main level. lower back yard for walkout. new windows and new garage door. | $300,000 |
| Dec 26, 2019 | Completed final sign-off May 2020 | 75 Carl St | Fg Force Construction Inc | remove (e) wall at kitchen, install (n) beams, replace kitchen cabinets,replace interior window.Details
remove (e) wall at kitchen, install (n) beams, replace kitchen cabinets,replace interior window. | $30,000 |
| Oct 30, 2019 | Completed final sign-off Oct 2021 | 2715 40th Av | Fg Force Construction Inc | remove 3 (e) windows and install 3 new marvin ebony clad windows, 1 at the garage level at the back of the house, 2 windows at the front of the house faces, 40th ave to be aluminum clad from marvin. u-factor less than or equal to 0.30 for windows in conditioned space.Details
remove 3 (e) windows and install 3 new marvin ebony clad windows, 1 at the garage level at the back of the house, 2 windows at the front of the house faces, 40th ave to be aluminum clad from marvin. u-factor less than or equal to 0.30 for windows in conditioned space. | $10,000 |
| Oct 10, 2019 | Completed final sign-off Feb 2020 | 146 Granville Wy | Fg Force Construction Inc | voluntary strengthening of rear pop out of existin 2 story residenceDetails
voluntary strengthening of rear pop out of existin 2 story residence | $9,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2019 | 2214 43rd Av | Fg Force Construction Inc | garage: repair dryrot damage(inkind)). front facade: replace existing vinyl window above garage(same opening) with marvin aluminum-clad window. rear facade: replace existing vinyl window (same opening) with marvin aluminum-clad window. replace existing driveway and sidewalk at front.Details
garage: repair dryrot damage(inkind)). front facade: replace existing vinyl window above garage(same opening) with marvin aluminum-clad window. rear facade: replace existing vinyl window (same opening) with marvin aluminum-clad window. replace existing driveway and sidewalk at front. | $20,000 |
| Nov 16, 2018 | Completed final sign-off Apr 2019 | 75 Carl St | Fg Force Construction Inc | remodel of 2 full bathrooms, upgrade plumbing fixtures, and electrical in both bathrooms. upgrade existing subpanel and convert to 50 amp subpanel, upgrade electrical outlets in 3 rooms and hallway upgrade and new lights in 3 bedrooms and hallway.Details
remodel of 2 full bathrooms, upgrade plumbing fixtures, and electrical in both bathrooms. upgrade existing subpanel and convert to 50 amp subpanel, upgrade electrical outlets in 3 rooms and hallway upgrade and new lights in 3 bedrooms and hallway. | $35,000 |
| Oct 19, 2017 | Completed final sign-off Nov 2017 | 3815 Market St | Fg Force Construction Inc | dry rot siding replacement, siding to be replace 300 sq. feet, back of the buildingDetails
dry rot siding replacement, siding to be replace 300 sq. feet, back of the building | $8,000 |