Back to bathroom remodel contractors
Zion Engineering
- Based in
- Mill Valley
- On San Francisco permits
- Apr 2002 to Mar 2018
- Last 24 months
- 0 permits filed
22 permits since 2000: 15 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 52 days from filing to permit and 876 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2018 | Never finaled issued May 2018, no final | 1249 Vallejo St | front structure: grnd/garage - new steel beam & shift post 2nd flr (unit #1251)-replace windows in kind, replace kit cabs, replace bathrm fixtures & finishes. unit #1253 reconfigure flr plan, add 2nd bathroom, new skylt, replace framing @ ceiling/roof at skylight/front half of structureDetails
front structure: grnd/garage - new steel beam & shift post 2nd flr (unit #1251)-replace windows in kind, replace kit cabs, replace bathrm fixtures & finishes. unit #1253 reconfigure flr plan, add 2nd bathroom, new skylt, replace framing @ ceiling/roof at skylight/front half of structure | $275,000 |
| Sep 17, 2013 | Completed final sign-off Nov 2020 | 275 Burnett Av | minor kitchen remodel, bath remodel, add washer/dryer. minor non bearing wall removal to be verified in the fieldDetails
minor kitchen remodel, bath remodel, add washer/dryer. minor non bearing wall removal to be verified in the field | $40,000 |
| May 6, 2011 | Completed final sign-off Jun 2014 | 231 08th Av | revise 200808189435.replc window@frt insulate in kind. reconfig utility area @garage.reloc bar&firepl@lower level.recongif stair to yard.switch window for door@rear 2/level terr.switch tile @terraces.reloc alternate tread device to exterior rear.reconfig bath & closets@frt rms on tp fl.railing@balcDetails
revise 200808189435.replc window@frt insulate in kind. reconfig utility area @garage.reloc bar&firepl@lower level.recongif stair to yard.switch window for door@rear 2/level terr.switch tile @terraces.reloc alternate tread device to exterior rear.reconfig bath & closets@frt rms on tp fl.railing@balc | $20,000 |
| May 11, 2004 | Expired or cancelled expired Feb 2007 | 379 Noe St | comply with 3r-3876 report. work completed. bath and kitchen upgrade and remodel, electrical upgradeDetails
comply with 3r-3876 report. work completed. bath and kitchen upgrade and remodel, electrical upgrade | $8,000 |
| Aug 8, 2002 | Completed final sign-off Nov 2002 | 379 Noe St | upgrade primary bathroom, install fuse box,closet & shelving. no change at plumbing or fixture.Details
upgrade primary bathroom, install fuse box,closet & shelving. no change at plumbing or fixture. | $10,000 |