Zion Engineering
- Based in
- Mill Valley
- On San Francisco permits
- Apr 2002 to Mar 2018
- Last 24 months
- 0 permits filed
22 permits since 2000: 15 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 expired or cancelled. Typically 1 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2012 | Expired or cancelled expired Jun 2014 | 367 Union St | repair or replace rear stairs in kind. repair deck surface at 1st floor. replace handrails with new to code 42" high. extend lower deck by 5'-0"Details
repair or replace rear stairs in kind. repair deck surface at 1st floor. replace handrails with new to code 42" high. extend lower deck by 5'-0" | $30,000 |