Back to kitchen remodel contractors
Ziarno Custom Builder
- Based in
- San Francisco
- On San Francisco permits
- Feb 2010 to Mar 2016
- Last 24 months
- 0 permits filed
18 permits since 2000: 17 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 never finaled. Typically 0 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2016 | Completed final sign-off Apr 2018 | 1555 21st Av | add new bath room at 2nd floor, remodel 2 extg bathrooms, replace extg stair to ground floor, remodel extg kitchen and open up to living and dining rooms, new windows and doors at rear facade, convert ground floor play room to guest bedroom.Details
add new bath room at 2nd floor, remodel 2 extg bathrooms, replace extg stair to ground floor, remodel extg kitchen and open up to living and dining rooms, new windows and doors at rear facade, convert ground floor play room to guest bedroom. | $175,000 |
| Mar 27, 2015 | Completed final sign-off Mar 2016 | 1303 Fell St | unit #12 remove & replace kitchen cabinets & sink.Details
unit #12 remove & replace kitchen cabinets & sink. | $10,000 |
| Jan 13, 2015 | Completed final sign-off Aug 2015 | 1155 Bay St | remodel upper unit. new kitchen and bath fixtures/electrical. add full bath, new elec. throughout. new hardwood floors, new ceilings.Details
remodel upper unit. new kitchen and bath fixtures/electrical. add full bath, new elec. throughout. new hardwood floors, new ceilings. | $150,000 |
| Nov 17, 2014 | Never finaled issued Nov 2014, no final | 170 Grand View Av | upgrade kitchen electrical, plumbing, replace cabinets, sink and counter top.Details
upgrade kitchen electrical, plumbing, replace cabinets, sink and counter top. | $8,750 |
| Jun 23, 2014 | Completed final sign-off Feb 2015 | 650 Gennessee St | upgrade electrical panel/ replace kitchen fixtures - new elctrical, inulsation, sheetrock, cabinets, countertop, all work in kitchenDetails
upgrade electrical panel/ replace kitchen fixtures - new elctrical, inulsation, sheetrock, cabinets, countertop, all work in kitchen | $20,000 |
| Jan 21, 2014 | Completed final sign-off Jul 2014 | 2234 36th Av | remodel existing kitchen with new lighting, cabinets, tile, countertop and sinkDetails
remodel existing kitchen with new lighting, cabinets, tile, countertop and sink | $30,000 |
| May 2, 2012 | Completed final sign-off Nov 2012 | 316 Douglass St | remodel existing kitchen with upgraded wiring, plumbing, insulation and cabinets.Details
remodel existing kitchen with upgraded wiring, plumbing, insulation and cabinets. | $5,000 |
| Mar 5, 2012 | Completed final sign-off Jul 2012 | 2911 Lake St | to comply with complaint # 201200102. remodel (e) kitchen / new subpanel (elec. permit sep.) upgrade plumbing supply lines (plumbing permit sep.) / new kitchen cabinets/replace furnace (hvac permit sep.) lighting to comply with cec 150 (k)Details
to comply with complaint # 201200102. remodel (e) kitchen / new subpanel (elec. permit sep.) upgrade plumbing supply lines (plumbing permit sep.) / new kitchen cabinets/replace furnace (hvac permit sep.) lighting to comply with cec 150 (k) | $18,000 |
| Sep 12, 2011 | Completed final sign-off Jan 2012 | 2509 Polk St | replace kitchen cabinets/sink, appliances. upgrade elec circuits for current code compliance. new insert windows ufactor .40 not visible from street. cabinets into 6x6 corner with additional peninsula with 2 cabinets and outletDetails
replace kitchen cabinets/sink, appliances. upgrade elec circuits for current code compliance. new insert windows ufactor .40 not visible from street. cabinets into 6x6 corner with additional peninsula with 2 cabinets and outlet | $3,000 |
| Aug 5, 2011 | Completed final sign-off Feb 2012 | 409 Clayton St | add light and switch to tradesmans entrance/new wiring to laundry on 3rd flr/remove old gas line from half bath/frame wall of fireplace/new undercabinet lights in kitchen/new railing from kitchen to base floorDetails
add light and switch to tradesmans entrance/new wiring to laundry on 3rd flr/remove old gas line from half bath/frame wall of fireplace/new undercabinet lights in kitchen/new railing from kitchen to base floor | $3,500 |
| Feb 19, 2010 | Completed final sign-off Sep 2010 | 2999 California St | remove partition walls, new kitchen cabients, replace base/crown moulding, refinish floors.Details
remove partition walls, new kitchen cabients, replace base/crown moulding, refinish floors. | $8,000 |