Back to bathroom remodel contractors
Ziarno Custom Builder
- Based in
- San Francisco
- On San Francisco permits
- Feb 2010 to Mar 2016
- Last 24 months
- 0 permits filed
18 permits since 2000: 17 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 8 days from filing to permit and 209 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2016 | Completed final sign-off Apr 2018 | 1555 21st Av | add new bath room at 2nd floor, remodel 2 extg bathrooms, replace extg stair to ground floor, remodel extg kitchen and open up to living and dining rooms, new windows and doors at rear facade, convert ground floor play room to guest bedroom.Details
add new bath room at 2nd floor, remodel 2 extg bathrooms, replace extg stair to ground floor, remodel extg kitchen and open up to living and dining rooms, new windows and doors at rear facade, convert ground floor play room to guest bedroom. | $175,000 |
| Jan 13, 2015 | Completed final sign-off Aug 2015 | 1155 Bay St | remodel upper unit. new kitchen and bath fixtures/electrical. add full bath, new elec. throughout. new hardwood floors, new ceilings.Details
remodel upper unit. new kitchen and bath fixtures/electrical. add full bath, new elec. throughout. new hardwood floors, new ceilings. | $150,000 |
| Aug 6, 2014 | Completed final sign-off Feb 2016 | 2087 44th Av | add new full bathroom to space adjacent lower bedroom/change backyard egress door location, change existing lower half bath to laundry room, alter entry door location, new floorings and lighting in lower bedroom.Details
add new full bathroom to space adjacent lower bedroom/change backyard egress door location, change existing lower half bath to laundry room, alter entry door location, new floorings and lighting in lower bedroom. | $35,000 |
| Jun 27, 2012 | Completed final sign-off Aug 2012 | 2507 Polk St | remodel existing bath, new fixtures, tile, add half bath with new toilet and sink.Details
remodel existing bath, new fixtures, tile, add half bath with new toilet and sink. | $11,500 |
| Aug 5, 2011 | Completed final sign-off Feb 2012 | 409 Clayton St | add light and switch to tradesmans entrance/new wiring to laundry on 3rd flr/remove old gas line from half bath/frame wall of fireplace/new undercabinet lights in kitchen/new railing from kitchen to base floorDetails
add light and switch to tradesmans entrance/new wiring to laundry on 3rd flr/remove old gas line from half bath/frame wall of fireplace/new undercabinet lights in kitchen/new railing from kitchen to base floor | $3,500 |
| Jun 23, 2011 | Completed final sign-off Feb 2012 | 550 Davis St | unit#44. inte. partitions and doors btw bedrooms and common areas on 1st and 2nd fl. (n) closed guardrail at loft. (n) doors/doorways in 1st and 2nd fl bathrooms. (e) elctrical distribution panel relocated from 2nd to 1st floor. (n) closets on 1st and 2nd fl, (n) recessed lighting throughout.Details
unit#44. inte. partitions and doors btw bedrooms and common areas on 1st and 2nd fl. (n) closed guardrail at loft. (n) doors/doorways in 1st and 2nd fl bathrooms. (e) elctrical distribution panel relocated from 2nd to 1st floor. (n) closets on 1st and 2nd fl, (n) recessed lighting throughout. | $4,000 |