Zhongwei Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Sep 2026
- Last 24 months
- 7 permits filed
30 permits since 2000: 21 completed, 9 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 13 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2023 | Completed final sign-off Jul 2024 | 2333 Funston Av | convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200ampDetails
convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200amp | $400,000 |