Back to kitchen remodel contractors
Zhongwei Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Sep 2026
- Last 24 months
- 7 permits filed
30 permits since 2000: 21 completed, 9 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 expired or cancelled. Typically 18 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2024 | Completed final sign-off Mar 2025 | 33 Rae Av | revision to pa # 202302071557: reduce scope of work @ 2/f: no consruction to be performed on this level. retain as-built kitchen, closet, and storage. existing to remainDetails
revision to pa # 202302071557: reduce scope of work @ 2/f: no consruction to be performed on this level. retain as-built kitchen, closet, and storage. existing to remain | |
| Sep 22, 2023 | Completed final sign-off Jul 2024 | 2333 Funston Av | convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200ampDetails
convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200amp | $400,000 |
| Feb 7, 2023 | Completed final sign-off Mar 2025 | 33 Rae Av | legalize as-build dwelling unit on 1/f per legalization ordinance 43-14. legalize (e) family room into a kitchen on 1/f per plan.Details
legalize as-build dwelling unit on 1/f per legalization ordinance 43-14. legalize (e) family room into a kitchen on 1/f per plan. | $35,000 |
| Dec 20, 2022 | Completed final sign-off Dec 2023 | 2222 25th Av | 1st fl - add family, media, office and 1 full bath; 2nd fl - remodel kitchen, bathroom. add 1 full bath; replace posts; add 1 skylight on flat roofDetails
1st fl - add family, media, office and 1 full bath; 2nd fl - remodel kitchen, bathroom. add 1 full bath; replace posts; add 1 skylight on flat roof | $75,000 |
| Jan 29, 2021 | Expired or cancelled expired Sep 2026 | 258 17th Av | 1/f:(n)den, playroom & 1/2bath.2/f:remodel kitchen,bathroom,add office and 2 full baths.3/f:remodel kitchen,bathroom,add office & 2 full baths. p/h: add 1 full bath, add new roof deck & patio.Details
1/f:(n)den, playroom & 1/2bath.2/f:remodel kitchen,bathroom,add office and 2 full baths.3/f:remodel kitchen,bathroom,add office & 2 full baths. p/h: add 1 full bath, add new roof deck & patio. | $128,000 |
| Dec 8, 2020 | Completed final sign-off Mar 2021 | 523 Naples St | remodel kitchen & bathroom at 2nd floor.Details
remodel kitchen & bathroom at 2nd floor. | $35,000 |
| Jul 1, 2020 | Completed final sign-off Jun 2021 | 131 Robinhood Dr | bathroom & kitchen remodel; add 1 bath. interior non-structural demo & framing. exterior window & door replacement. no new conditioned space. elec & plumbing permits under sep permit.Details
bathroom & kitchen remodel; add 1 bath. interior non-structural demo & framing. exterior window & door replacement. no new conditioned space. elec & plumbing permits under sep permit. | $50,000 |
| Jun 23, 2020 | Completed final sign-off Feb 2021 | 1537 Mason St | kitchen and bathroom remodel in-kind with similar fixtures.replace lights with high efficiency lights (led).no wall changesDetails
kitchen and bathroom remodel in-kind with similar fixtures.replace lights with high efficiency lights (led).no wall changes | $27,700 |