Back to kitchen remodel contractors
Zhizhao Liu Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Dec 2014 to Apr 2025
- Last 24 months
- 2 permits filed
22 permits since 2000: 22 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 7 days from filing to permit and 406 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2023 | Completed final sign-off Jul 2025 | 363 Princeton St | 1st/f remodel: add 2 bedrooms, bathroom, kitchenette, entertainment rm. change (e) half bath to full bath. new habitable space 467 sfDetails
1st/f remodel: add 2 bedrooms, bathroom, kitchenette, entertainment rm. change (e) half bath to full bath. new habitable space 467 sf | $50,000 |
| Aug 29, 2019 | Completed final sign-off Sep 2022 | 230 Collingwood St | interior renovations: relocate 2 kitchens, remodel 2 bathrooms, add 3 new bathrooms. create habitable space at 1st floor connected to 2nd floor with interior stair. lightwell infill at 2nd and 3 floor against blankwall of adj bldg. seismic strengthening at all floors.Details
interior renovations: relocate 2 kitchens, remodel 2 bathrooms, add 3 new bathrooms. create habitable space at 1st floor connected to 2nd floor with interior stair. lightwell infill at 2nd and 3 floor against blankwall of adj bldg. seismic strengthening at all floors. | $250,000 |
| Aug 13, 2019 | Completed final sign-off Oct 2020 | 1057 Portola Dr | remove and replace interior stairs, update kitchen and bathroom, add 1 bathroom at lower floor, replace select windows on side yardDetails
remove and replace interior stairs, update kitchen and bathroom, add 1 bathroom at lower floor, replace select windows on side yard | $50,000 |
| Nov 26, 2018 | Completed final sign-off Jul 2019 | 227 Santos St | kitchen cabinet replacementDetails
kitchen cabinet replacement | $2,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 900 Broderick St | work at unit 2, 2nd fl and units 5 and 6 on 3rd fl. no changes to exterior. same scope all 3 units. relocate kitchen, convert e kitchen rm into bedroom. remodel bath, replace fixturesDetails
work at unit 2, 2nd fl and units 5 and 6 on 3rd fl. no changes to exterior. same scope all 3 units. relocate kitchen, convert e kitchen rm into bedroom. remodel bath, replace fixtures | $50,000 |