Back to kitchen remodel contractors
Ywum Ent Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Sep 2025
- Last 24 months
- 4 permits filed
64 permits since 2000: 50 completed, 2 in progress, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 12 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2024 | In progress issued Jul 2025 | 618 42nd Av | g/f: slab to make 8' height ceiling, add excercise rm, game rm, home office, 1 bathroom behind the garage. 2nd/f: enlarge kitchen, add 1 bath. 3rd/f: relocate bathroom. partial structural strengthening to the existing buildingDetails
g/f: slab to make 8' height ceiling, add excercise rm, game rm, home office, 1 bathroom behind the garage. 2nd/f: enlarge kitchen, add 1 bath. 3rd/f: relocate bathroom. partial structural strengthening to the existing building | $300,000 |
| May 13, 2024 | In progress issued Nov 2024 | 718 07th Av | 2nd fl: remodel (e) kitchen & bathroom on 2nd fl. add one full bathroom. infill lightwell at north wall & replace (e) sheetrock w/ new ground fl: construct one (n) bedroom, one (n) full bathroom, one (n) powder room & family room. one (n) wetbar. construct new deck at the rear (appox size 18x6)Details
2nd fl: remodel (e) kitchen & bathroom on 2nd fl. add one full bathroom. infill lightwell at north wall & replace (e) sheetrock w/ new ground fl: construct one (n) bedroom, one (n) full bathroom, one (n) powder room & family room. one (n) wetbar. construct new deck at the rear (appox size 18x6) | $286,000 |
| Nov 28, 2023 | Expired or cancelled cancelled Jul 2025 | 618 42nd Av | remodel kitchen and 3 bathrooms on second floor.Details
remodel kitchen and 3 bathrooms on second floor. | $100,000 |
| Jul 5, 2022 | Completed final sign-off Sep 2022 | 839 Divisadero St | apt 12: ktichen remodel. new toilet & refinish two and 1/2 bath.remove murphy bed & add closet door. new light fixtures & windows. upgrade (e) electrical panel from 400a to 60a. kitchen/bathroom only. "not whole unit electrical"Details
apt 12: ktichen remodel. new toilet & refinish two and 1/2 bath.remove murphy bed & add closet door. new light fixtures & windows. upgrade (e) electrical panel from 400a to 60a. kitchen/bathroom only. "not whole unit electrical" | $21,000 |
| Aug 13, 2021 | Completed final sign-off Jul 2022 | 137 Rey St | add full bath at ground w/home theater, playroom, store rm, a front door, change w/6' sliding door at rear ground fl. change the existing kitchen to study rm, upgrade the existing bath, relocate the kitchen & add a half bath at 2nd fl.Details
add full bath at ground w/home theater, playroom, store rm, a front door, change w/6' sliding door at rear ground fl. change the existing kitchen to study rm, upgrade the existing bath, relocate the kitchen & add a half bath at 2nd fl. | $120,000 |
| Jan 29, 2020 | Completed final sign-off May 2020 | 2433 Franklin St | units 2 & 6. replace (e) kitchen cabinets w/ (n) cabinets, (n) counter, (n) sink, electrical light & receptacles. the stove and ref are (e) 10'x12'. like for like replacementDetails
units 2 & 6. replace (e) kitchen cabinets w/ (n) cabinets, (n) counter, (n) sink, electrical light & receptacles. the stove and ref are (e) 10'x12'. like for like replacement | $60,000 |
| Oct 9, 2019 | Completed final sign-off Jan 2020 | 468 29th Av | remodel bath at 3rd fl, remodel kitchen at 2nd fl. no structural workDetails
remodel bath at 3rd fl, remodel kitchen at 2nd fl. no structural work | $40,000 |
| Aug 15, 2019 | Completed final sign-off Jan 2020 | 1730 Kirkham St | add a bath next to kitchen into lightwell w kitchen remodel. repair approx 30" foundation, change furnace. bathroom in lightwell (partial), 2nd fl.Details
add a bath next to kitchen into lightwell w kitchen remodel. repair approx 30" foundation, change furnace. bathroom in lightwell (partial), 2nd fl. | $80,000 |
| Oct 26, 2018 | Completed final sign-off Feb 2019 | 2433 Franklin St | change kitchen counter + cabinets (10 x 15)Details
change kitchen counter + cabinets (10 x 15) | $15,000 |
| Oct 19, 2017 | Completed final sign-off Feb 2018 | 473 34th Av | unit 473 & 475: change kitchen cabinets & bath room tilesDetails
unit 473 & 475: change kitchen cabinets & bath room tiles | $20,000 |
| Jan 27, 2017 | Completed final sign-off May 2017 | 2433 Franklin St | unit #5 - change ktichen cabinet & ocuntertop & paint whole kitchen.Details
unit #5 - change ktichen cabinet & ocuntertop & paint whole kitchen. | $18,000 |
| Jan 27, 2017 | Completed final sign-off May 2017 | 2433 Franklin St | unit #3 - change ktichen cabinet & ocuntertop & paint whole kitchen.Details
unit #3 - change ktichen cabinet & ocuntertop & paint whole kitchen. | $12,000 |
| Nov 21, 2016 | Completed final sign-off Feb 2017 | 44 Edinburgh St | change electrical service, change kitchen cabinet and sink chamge one bathroom, tub, sink, toilet and change all windows to be double glazed window at front w/street facing windows to be double hung wood alum clad windows.Details
change electrical service, change kitchen cabinet and sink chamge one bathroom, tub, sink, toilet and change all windows to be double glazed window at front w/street facing windows to be double hung wood alum clad windows. | $35,000 |
| Aug 14, 2015 | Completed final sign-off May 2016 | 846 25th Av | 2nd flr: remove the partition wall between kitchen and dining rm grnd flr: add a study rm, exercise rm, and full bath w/shower, sink and toilet. remove the (e) wall plaster, add insulation & new 5/8" type x gyp board.Details
2nd flr: remove the partition wall between kitchen and dining rm grnd flr: add a study rm, exercise rm, and full bath w/shower, sink and toilet. remove the (e) wall plaster, add insulation & new 5/8" type x gyp board. | $35,000 |
| Apr 30, 2015 | Never finaled issued May 2021, no final | 517 04th Av | legalization of (e) unauthorized dwelling unit adding (1) kitchen. (unit legalization ordinance 43-14)Details
legalization of (e) unauthorized dwelling unit adding (1) kitchen. (unit legalization ordinance 43-14) | $6,000 |
| Oct 9, 2013 | Never finaled issued Oct 2013, no final | 2838 Greenwich St | replace existing bath room tile, replace existing kitchen cabinets.Details
replace existing bath room tile, replace existing kitchen cabinets. | $5,000 |
| Oct 5, 2010 | Completed final sign-off Dec 2010 | 1631 Palou Av | tile around the tub, change kitchen cabinet, no structural work no new lightingDetails
tile around the tub, change kitchen cabinet, no structural work no new lighting | $8,000 |