Back to bathroom remodel contractors
Ywum Ent Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Sep 2025
- Last 24 months
- 4 permits filed
64 permits since 2000: 50 completed, 2 in progress, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 12 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2024 | In progress issued Jul 2025 | 618 42nd Av | g/f: slab to make 8' height ceiling, add excercise rm, game rm, home office, 1 bathroom behind the garage. 2nd/f: enlarge kitchen, add 1 bath. 3rd/f: relocate bathroom. partial structural strengthening to the existing buildingDetails
g/f: slab to make 8' height ceiling, add excercise rm, game rm, home office, 1 bathroom behind the garage. 2nd/f: enlarge kitchen, add 1 bath. 3rd/f: relocate bathroom. partial structural strengthening to the existing building | $300,000 |
| May 13, 2024 | In progress issued Nov 2024 | 718 07th Av | 2nd fl: remodel (e) kitchen & bathroom on 2nd fl. add one full bathroom. infill lightwell at north wall & replace (e) sheetrock w/ new ground fl: construct one (n) bedroom, one (n) full bathroom, one (n) powder room & family room. one (n) wetbar. construct new deck at the rear (appox size 18x6)Details
2nd fl: remodel (e) kitchen & bathroom on 2nd fl. add one full bathroom. infill lightwell at north wall & replace (e) sheetrock w/ new ground fl: construct one (n) bedroom, one (n) full bathroom, one (n) powder room & family room. one (n) wetbar. construct new deck at the rear (appox size 18x6) | $286,000 |
| Nov 28, 2023 | Expired or cancelled cancelled Jul 2025 | 618 42nd Av | remodel kitchen and 3 bathrooms on second floor.Details
remodel kitchen and 3 bathrooms on second floor. | $100,000 |
| Feb 13, 2023 | Completed final sign-off Oct 2024 | 44 Edinburgh St | rear addition. add one bedroom w/ full bath @ 2nd fl w/ 5' rear deck & one study rm w/ full bath @ ground fl rear yard.Details
rear addition. add one bedroom w/ full bath @ 2nd fl w/ 5' rear deck & one study rm w/ full bath @ ground fl rear yard. | $150,000 |
| Jul 14, 2022 | Completed final sign-off Oct 2022 | 991 Oak St | add a handicap bath @ empty shop space. ref 2015 1217 5394Details
add a handicap bath @ empty shop space. ref 2015 1217 5394 | $20,000 |
| Jul 5, 2022 | Completed final sign-off Sep 2022 | 839 Divisadero St | apt 12: ktichen remodel. new toilet & refinish two and 1/2 bath.remove murphy bed & add closet door. new light fixtures & windows. upgrade (e) electrical panel from 400a to 60a. kitchen/bathroom only. "not whole unit electrical"Details
apt 12: ktichen remodel. new toilet & refinish two and 1/2 bath.remove murphy bed & add closet door. new light fixtures & windows. upgrade (e) electrical panel from 400a to 60a. kitchen/bathroom only. "not whole unit electrical" | $21,000 |
| Mar 8, 2022 | Completed final sign-off May 2022 | 285 Vicente St | bathroom remodel in-kind. add vent.Details
bathroom remodel in-kind. add vent. | $8,000 |
| Aug 13, 2021 | Completed final sign-off Jul 2022 | 137 Rey St | add full bath at ground w/home theater, playroom, store rm, a front door, change w/6' sliding door at rear ground fl. change the existing kitchen to study rm, upgrade the existing bath, relocate the kitchen & add a half bath at 2nd fl.Details
add full bath at ground w/home theater, playroom, store rm, a front door, change w/6' sliding door at rear ground fl. change the existing kitchen to study rm, upgrade the existing bath, relocate the kitchen & add a half bath at 2nd fl. | $120,000 |
| Jun 17, 2021 | Never finaled issued Jun 2021, no final | 2274 22nd Av | remove broken tile at upper floor bath room, 1 bath with new waterproof under layment and new fl and wall tileDetails
remove broken tile at upper floor bath room, 1 bath with new waterproof under layment and new fl and wall tile | $8,000 |
| Mar 5, 2021 | Completed final sign-off Sep 2022 | 1826 Kirkham St | add media room, bedroom 1 full bathroom on 1/f.Details
add media room, bedroom 1 full bathroom on 1/f. | $45,000 |
| Oct 9, 2019 | Completed final sign-off Jan 2020 | 468 29th Av | remodel bath at 3rd fl, remodel kitchen at 2nd fl. no structural workDetails
remodel bath at 3rd fl, remodel kitchen at 2nd fl. no structural work | $40,000 |
| Aug 15, 2019 | Completed final sign-off Jan 2020 | 1730 Kirkham St | add a bath next to kitchen into lightwell w kitchen remodel. repair approx 30" foundation, change furnace. bathroom in lightwell (partial), 2nd fl.Details
add a bath next to kitchen into lightwell w kitchen remodel. repair approx 30" foundation, change furnace. bathroom in lightwell (partial), 2nd fl. | $80,000 |
| Oct 19, 2017 | Completed final sign-off Feb 2018 | 473 34th Av | unit 473 & 475: change kitchen cabinets & bath room tilesDetails
unit 473 & 475: change kitchen cabinets & bath room tiles | $20,000 |
| Nov 21, 2016 | Completed final sign-off Feb 2017 | 44 Edinburgh St | change electrical service, change kitchen cabinet and sink chamge one bathroom, tub, sink, toilet and change all windows to be double glazed window at front w/street facing windows to be double hung wood alum clad windows.Details
change electrical service, change kitchen cabinet and sink chamge one bathroom, tub, sink, toilet and change all windows to be double glazed window at front w/street facing windows to be double hung wood alum clad windows. | $35,000 |
| Mar 30, 2016 | Completed final sign-off Jun 2016 | 170 Belvedere St | change closet space @ bedroom #3 to full bath w/shower, vanity & toilet.Details
change closet space @ bedroom #3 to full bath w/shower, vanity & toilet. | $10,000 |
| Aug 14, 2015 | Completed final sign-off May 2016 | 846 25th Av | 2nd flr: remove the partition wall between kitchen and dining rm grnd flr: add a study rm, exercise rm, and full bath w/shower, sink and toilet. remove the (e) wall plaster, add insulation & new 5/8" type x gyp board.Details
2nd flr: remove the partition wall between kitchen and dining rm grnd flr: add a study rm, exercise rm, and full bath w/shower, sink and toilet. remove the (e) wall plaster, add insulation & new 5/8" type x gyp board. | $35,000 |
| Oct 9, 2013 | Never finaled issued Oct 2013, no final | 2838 Greenwich St | replace existing bath room tile, replace existing kitchen cabinets.Details
replace existing bath room tile, replace existing kitchen cabinets. | $5,000 |