Back to kitchen remodel contractors
Yong Hong Construction Inc.
- Based in
- Hayward
- On San Francisco permits
- Apr 2005 to Aug 2026
- Last 24 months
- 8 permits filed
42 permits since 2000: 33 completed, 5 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 14 completed, 1 in progress, 2 never finaled. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2026 | In progress issued May 2026 | 1642 31st Av | partially convert garage to 2 bedrms, 2 baths, (n) media; relocate (e) stairway from 1st to 2nd fl; kitchen remodel; upgrade elecrical panel to 200 amp; add (n) radiant floor heating; relocate washer, dryer & water heaterDetails
partially convert garage to 2 bedrms, 2 baths, (n) media; relocate (e) stairway from 1st to 2nd fl; kitchen remodel; upgrade elecrical panel to 200 amp; add (n) radiant floor heating; relocate washer, dryer & water heater | $2,000 |
| Dec 3, 2025 | Completed final sign-off Apr 2026 | 685 25th Av | kitchen remodel: replace kitchen cabinets and countertop. upgrade electrical wiring for the whole house. (2) bathroom remodel: replace tiles and plumbing fixtures for bathrooms. (11) window replacement; like for like - at back of house.Details
kitchen remodel: replace kitchen cabinets and countertop. upgrade electrical wiring for the whole house. (2) bathroom remodel: replace tiles and plumbing fixtures for bathrooms. (11) window replacement; like for like - at back of house. | $55,000 |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 466 Liberty St | bathroom and kitchen remodel. replace kitchen cabinets and acountertop, non structural. remodel 2 full bath and 1 powder room, non structural.Details
bathroom and kitchen remodel. replace kitchen cabinets and acountertop, non structural. remodel 2 full bath and 1 powder room, non structural. | $38,000 |
| Jul 31, 2024 | Completed final sign-off Nov 2024 | 3527 Sacramento St | kitchen remodel in kind - replace kitchen cabinets and countertop. no structural work. no change to floor layout. no change to wall layout.Details
kitchen remodel in kind - replace kitchen cabinets and countertop. no structural work. no change to floor layout. no change to wall layout. | $12,000 |
| Jun 17, 2024 | Completed final sign-off Sep 2024 | 650 Lake St | bathroom remodel for unit# 7 and #11. replace bathtub with shower pan and replace tile. replace kitchen cabinets and countertop only for unit# 11.Details
bathroom remodel for unit# 7 and #11. replace bathtub with shower pan and replace tile. replace kitchen cabinets and countertop only for unit# 11. | $26,500 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 304 Brazil Av | replace kitchen cabinets and countertop. upgrade electrical outlets and add 8 recess lights in kitchen. no other work in kitchen. bathroom remodel, replace bathtub with showerpanDetails
replace kitchen cabinets and countertop. upgrade electrical outlets and add 8 recess lights in kitchen. no other work in kitchen. bathroom remodel, replace bathtub with showerpan | $20,000 |
| Jul 21, 2023 | Completed final sign-off Jan 2024 | 66 Cleary Ct | replace kitchen cabinets and countertops. install vinyl floor.no layout changeDetails
replace kitchen cabinets and countertops. install vinyl floor.no layout change | $12,000 |
| Aug 30, 2022 | Never finaled issued Aug 2022, no final | 218 Marietta Dr | replace kitchen cabinets and countertops. no new appliances. non structural.Details
replace kitchen cabinets and countertops. no new appliances. non structural. | $10,000 |
| Aug 16, 2022 | Completed final sign-off Oct 2023 | 17 Hattie St | one kitchen remodel kitchen cabinets, countertops and appliances replacementDetails
one kitchen remodel kitchen cabinets, countertops and appliances replacement | $15,000 |
| Mar 7, 2022 | Completed final sign-off Mar 2022 | 4732 17th St | replace cabinets and countertop for kitchen at basement. no walls modified/moved for kitchen remodel.Details
replace cabinets and countertop for kitchen at basement. no walls modified/moved for kitchen remodel. | $5,000 |
| Jan 19, 2022 | Never finaled issued Jan 2022, no final | 4732 17th St | replace cabinets & counter top for kitchen in basement. no moving walls at remodel.Details
replace cabinets & counter top for kitchen in basement. no moving walls at remodel. | $10,000 |
| Dec 13, 2021 | Completed final sign-off Dec 2021 | 1817 California St | replace cabinets only for kitchen and 2 bathrooms.Details
replace cabinets only for kitchen and 2 bathrooms. | $15,000 |
| Feb 18, 2021 | Completed final sign-off Mar 2021 | 215 Arguello Bl | like-kind kitchen remodelDetails
like-kind kitchen remodel | $17,058 |
| Jul 20, 2020 | Completed final sign-off Sep 2020 | 1495 Masonic Av | replace kitchen cabinets, countertops, tiles, sink, faucet, range, ventilation. moving gas valve a few inches to sit inside a cabinet.Details
replace kitchen cabinets, countertops, tiles, sink, faucet, range, ventilation. moving gas valve a few inches to sit inside a cabinet. | $15,440 |
| May 27, 2020 | Completed final sign-off Jun 2020 | 717 Corbett Av | replace kitchen countertop in knidDetails
replace kitchen countertop in knid | $10,000 |
| Aug 22, 2012 | Completed final sign-off Nov 2012 | 1998 Broadway | replace kitchen cabinets, replace tiles in both master & guest bathrooms. replace vanity cabinets & vanity topsDetails
replace kitchen cabinets, replace tiles in both master & guest bathrooms. replace vanity cabinets & vanity tops | $9,000 |
| Nov 12, 2010 | Completed final sign-off Jun 2012 | 937 Dolores St | renovation to (e) seven dwelling unit apts include: replacement o fall ext. windows w/(n) insul units (in kind on facade). interior remodel of each unit including : reconfiguration of partitions within each unit, renovation of (e) bath & kitchen in each unit. addition of hardwired s/d' in each unitDetails
renovation to (e) seven dwelling unit apts include: replacement o fall ext. windows w/(n) insul units (in kind on facade). interior remodel of each unit including : reconfiguration of partitions within each unit, renovation of (e) bath & kitchen in each unit. addition of hardwired s/d' in each unit | $136,000 |