Back to bathroom remodel contractors
Yong Hong Construction Inc.
- Based in
- Hayward
- On San Francisco permits
- Apr 2005 to Aug 2026
- Last 24 months
- 8 permits filed
42 permits since 2000: 33 completed, 5 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 11 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Jun 2026 | 1642 31st Av | revision to pa# 202604300368. relocate (n) bath & (n) bar at 1st floor. relocate washer & dryer to garage. revise detail 4,5 on sheet s2.2 per site. reduce media room size for (n) wine cellar constructionDetails
revision to pa# 202604300368. relocate (n) bath & (n) bar at 1st floor. relocate washer & dryer to garage. revise detail 4,5 on sheet s2.2 per site. reduce media room size for (n) wine cellar construction | $10,000 |
| Apr 30, 2026 | In progress issued May 2026 | 1642 31st Av | partially convert garage to 2 bedrms, 2 baths, (n) media; relocate (e) stairway from 1st to 2nd fl; kitchen remodel; upgrade elecrical panel to 200 amp; add (n) radiant floor heating; relocate washer, dryer & water heaterDetails
partially convert garage to 2 bedrms, 2 baths, (n) media; relocate (e) stairway from 1st to 2nd fl; kitchen remodel; upgrade elecrical panel to 200 amp; add (n) radiant floor heating; relocate washer, dryer & water heater | $2,000 |
| Dec 3, 2025 | Completed final sign-off Apr 2026 | 685 25th Av | kitchen remodel: replace kitchen cabinets and countertop. upgrade electrical wiring for the whole house. (2) bathroom remodel: replace tiles and plumbing fixtures for bathrooms. (11) window replacement; like for like - at back of house.Details
kitchen remodel: replace kitchen cabinets and countertop. upgrade electrical wiring for the whole house. (2) bathroom remodel: replace tiles and plumbing fixtures for bathrooms. (11) window replacement; like for like - at back of house. | $55,000 |
| Jul 14, 2025 | Completed final sign-off Dec 2025 | 1750 42nd Av | remodel 2 baths in kind - replace plumbing fixture & floor tile. upgrade electrical panel and wires at select locations - minor wall/ceiling drywall removal. no change to floor layout. no change to wall layout. no structural work. all replacement gypboard at walls and ceilings to be 5/8" type x. maiDetails
remodel 2 baths in kind - replace plumbing fixture & floor tile. upgrade electrical panel and wires at select locations - minor wall/ceiling drywall removal. no change to floor layout. no change to wall layout. no structural work. all replacement gypboard at walls and ceilings to be 5/8" type x. mai | $2,600 |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 466 Liberty St | bathroom and kitchen remodel. replace kitchen cabinets and acountertop, non structural. remodel 2 full bath and 1 powder room, non structural.Details
bathroom and kitchen remodel. replace kitchen cabinets and acountertop, non structural. remodel 2 full bath and 1 powder room, non structural. | $38,000 |
| Jun 17, 2024 | Completed final sign-off Sep 2024 | 650 Lake St | bathroom remodel for unit# 7 and #11. replace bathtub with shower pan and replace tile. replace kitchen cabinets and countertop only for unit# 11.Details
bathroom remodel for unit# 7 and #11. replace bathtub with shower pan and replace tile. replace kitchen cabinets and countertop only for unit# 11. | $26,500 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 304 Brazil Av | replace kitchen cabinets and countertop. upgrade electrical outlets and add 8 recess lights in kitchen. no other work in kitchen. bathroom remodel, replace bathtub with showerpanDetails
replace kitchen cabinets and countertop. upgrade electrical outlets and add 8 recess lights in kitchen. no other work in kitchen. bathroom remodel, replace bathtub with showerpan | $20,000 |
| Jul 21, 2023 | Completed final sign-off Nov 2023 | 2191 32nd Av | one bathroom and one powder room remodel. non structuralDetails
one bathroom and one powder room remodel. non structural | $12,000 |
| Dec 13, 2021 | Completed final sign-off Dec 2021 | 1817 California St | replace cabinets only for kitchen and 2 bathrooms.Details
replace cabinets only for kitchen and 2 bathrooms. | $15,000 |
| Aug 26, 2013 | Never finaled issued Aug 2013, no final | 3730 Webster St | bathroom remodel - relocate sink, shower. replace all tile, replace bathtub, shower door, vanity cabinet, replace fan, add 8 recess lights and 5 wall mount lightsDetails
bathroom remodel - relocate sink, shower. replace all tile, replace bathtub, shower door, vanity cabinet, replace fan, add 8 recess lights and 5 wall mount lights | $9,500 |
| Mar 4, 2013 | Completed final sign-off Mar 2013 | 1290 Rhode Island St | bathroom remodel in unit # 21, change the fixtures in the bathroom , includes the toilet, shower and sink, the floor tiles & wall tiles will also be changed areas not covered by the tiles will be painted.Details
bathroom remodel in unit # 21, change the fixtures in the bathroom , includes the toilet, shower and sink, the floor tiles & wall tiles will also be changed areas not covered by the tiles will be painted. | $3,500 |
| Aug 22, 2012 | Completed final sign-off Nov 2012 | 1998 Broadway | replace kitchen cabinets, replace tiles in both master & guest bathrooms. replace vanity cabinets & vanity topsDetails
replace kitchen cabinets, replace tiles in both master & guest bathrooms. replace vanity cabinets & vanity tops | $9,000 |
| Nov 12, 2010 | Completed final sign-off Jun 2012 | 937 Dolores St | renovation to (e) seven dwelling unit apts include: replacement o fall ext. windows w/(n) insul units (in kind on facade). interior remodel of each unit including : reconfiguration of partitions within each unit, renovation of (e) bath & kitchen in each unit. addition of hardwired s/d' in each unitDetails
renovation to (e) seven dwelling unit apts include: replacement o fall ext. windows w/(n) insul units (in kind on facade). interior remodel of each unit including : reconfiguration of partitions within each unit, renovation of (e) bath & kitchen in each unit. addition of hardwired s/d' in each unit | $136,000 |
| May 16, 2005 | Completed final sign-off Nov 2005 | 1482 18th Av | add ceiling fan in bathroom & replace window in bathroom in kind (reference app 200504129869)Details
add ceiling fan in bathroom & replace window in bathroom in kind (reference app 200504129869) | $1,250 |