Back to bathroom remodel contractors
Yiu Cheong Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2026
- Last 24 months
- 17 permits filed
366 permits since 2000: 269 completed, 9 in progress, 35 never finaled, 53 expired or cancelled.
Of the 35 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 31 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
124 bathroom remodel permits: 97 completed, 2 in progress, 12 never finaled, 13 expired or cancelled. Typically 0 days from filing to permit and 115 days from permit to final inspection.
Showing the 100 most recent of 124.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2026 | In progress issued Jul 2026 | 5828 California St | interior remodel: convert (e) storage room to an excercise room, a media room and a bathroom for unit# 1 above.Details
interior remodel: convert (e) storage room to an excercise room, a media room and a bathroom for unit# 1 above. | $70,000 |
| Feb 12, 2026 | Completed final sign-off Aug 2026 | 2151 46th Av | rear addition and interior rmeodel: 1/f remodel (e) bedroom, family room, and bathroom. 2/f: remodel (e) bedroom add a bathroom.Details
rear addition and interior rmeodel: 1/f remodel (e) bedroom, family room, and bathroom. 2/f: remodel (e) bedroom add a bathroom. | $230,000 |
| Feb 20, 2025 | In progress issued Mar 2025 | 5828 California St | remodel 2nd and 3rd floor per plans. remodel (e) living to bedrooms and add new bathrooms. infill lightwellsDetails
remodel 2nd and 3rd floor per plans. remodel (e) living to bedrooms and add new bathrooms. infill lightwells | $258,000 |
| May 14, 2024 | Completed final sign-off Mar 2025 | 822 30th Av | at unit 822 30th ave: convert existing living in to new bedroom, remodel existing bathroom. 824a, 822a, 824: remodel existing kitchen and existing bathroom. new laundry & new gas furnace for each unit.Details
at unit 822 30th ave: convert existing living in to new bedroom, remodel existing bathroom. 824a, 822a, 824: remodel existing kitchen and existing bathroom. new laundry & new gas furnace for each unit. | $175,000 |
| May 13, 2024 | Completed final sign-off Mar 2025 | 824 30th Av | renovate kitchen (10 x 10) with new cabinets and counter. renovate bathroom with new tile, shower and vanity. no moving walls.Details
renovate kitchen (10 x 10) with new cabinets and counter. renovate bathroom with new tile, shower and vanity. no moving walls. | $20,000 |
| May 13, 2024 | Completed final sign-off Mar 2025 | 822 30th Av | ref pa# 202404180300 - demo the old bathroom sheetrock and kitchen sheetrock for the electrical work and counter/new tile for vanity, toilet for new bathroom. no structural work.Details
ref pa# 202404180300 - demo the old bathroom sheetrock and kitchen sheetrock for the electrical work and counter/new tile for vanity, toilet for new bathroom. no structural work. | $10,000 |
| Feb 8, 2023 | Completed final sign-off May 2023 | 372 Christopher Dr | build 1 bedroom, 1 bathroom & 1 living room in the 1st fl within the envelope of the house. no structural work and all in same kindDetails
build 1 bedroom, 1 bathroom & 1 living room in the 1st fl within the envelope of the house. no structural work and all in same kind | $35,000 |
| Dec 5, 2022 | Expired or cancelled expired Aug 2026 | 678 23rd Av | kitchen and bathroom remodel in kind.Details
kitchen and bathroom remodel in kind. | $2,000 |
| Nov 23, 2021 | Never finaled issued Dec 2021, no final | 1415 40th Av | remove (2) (e) post @ garage floor, install (n) beam, remodel (e) enclosed kitchen into open kitchen, remodel (e) bathroom, remodel (e) bedroom & (n) bathroom & closet, (n) light fixturesDetails
remove (2) (e) post @ garage floor, install (n) beam, remodel (e) enclosed kitchen into open kitchen, remodel (e) bathroom, remodel (e) bedroom & (n) bathroom & closet, (n) light fixtures | $71,000 |
| Oct 1, 2021 | Completed final sign-off Mar 2022 | 155 Eureka St | #3. renovate one kitchen with new cabinets, counter and one bathroom with shower, toilet, tile, vanity, no structural or layout changes. no structural or layout change.Details
#3. renovate one kitchen with new cabinets, counter and one bathroom with shower, toilet, tile, vanity, no structural or layout changes. no structural or layout change. | $40,000 |
| Mar 31, 2021 | Completed final sign-off Sep 2021 | 155 Eureka St | renovate (e) kitchen with new cabinets counter and appliances remodel bathroom with new tiles, shower and vanity, all works will not change layout, no structural workDetails
renovate (e) kitchen with new cabinets counter and appliances remodel bathroom with new tiles, shower and vanity, all works will not change layout, no structural work | $35,000 |
| Sep 20, 2019 | Completed final sign-off Feb 2020 | 25 Alvarado St | kitchen remodel. new layout, cabinets, countertops, appliances. new bathroom with shower, toilet and vanity/ no structural workDetails
kitchen remodel. new layout, cabinets, countertops, appliances. new bathroom with shower, toilet and vanity/ no structural work | $5,000 |
| Aug 2, 2019 | Completed final sign-off Sep 2019 | 41 Seward St | #3. renovate master bathroom with new tile, vanity & toilet with no layout and structural change. (5x8).Details
#3. renovate master bathroom with new tile, vanity & toilet with no layout and structural change. (5x8). | $12,000 |
| Jul 3, 2019 | Completed final sign-off Feb 2020 | 25 Alvarado St | remodel kitchen (60 sqft) with new cabinets, counter, and appliances. remodel bathroom (45sqft) with new tile, vanity. repair exterior sidings and paint. no structural work.Details
remodel kitchen (60 sqft) with new cabinets, counter, and appliances. remodel bathroom (45sqft) with new tile, vanity. repair exterior sidings and paint. no structural work. | $40,000 |
| May 29, 2019 | Completed final sign-off Jul 2019 | 1211 03rd Av | to remodel existing kitchen & bathroom.Details
to remodel existing kitchen & bathroom. | $20,000 |
| Apr 9, 2019 | Expired or cancelled cancelled May 2019 | 369 Dellbrook Av | renovate (e) bathroom, bedroom in the first floor with no structural work. in kind.Details
renovate (e) bathroom, bedroom in the first floor with no structural work. in kind. | $20,000 |
| Feb 15, 2019 | Never finaled issued Feb 2019, no final | 372 Christopher Dr | renovate bathroom with new tub, vanity & sink, no structure/layout change.Details
renovate bathroom with new tub, vanity & sink, no structure/layout change. | $6,000 |
| Jan 3, 2019 | Completed final sign-off May 2019 | 192 Valley St | renovate kitchen with new cabinets, counters, bathroom with new vanity, tile and toilet, new painting and electrical work. no structural or layout change. as is condition. bathroom, kitchen 10x12.Details
renovate kitchen with new cabinets, counters, bathroom with new vanity, tile and toilet, new painting and electrical work. no structural or layout change. as is condition. bathroom, kitchen 10x12. | $30,000 |
| Sep 18, 2018 | Completed final sign-off Jan 2019 | 1119 Rhode Island St | renovate the (e) bathroom @ 1/f w/new shower, vanity & toilet, new tile work, approx. 5'x8'Details
renovate the (e) bathroom @ 1/f w/new shower, vanity & toilet, new tile work, approx. 5'x8' | $12,000 |
| Sep 7, 2018 | Completed final sign-off Feb 2019 | 365 Dellbrook Av | renovate kitchen w/new cabinets, granite top & appliances, renovate bathroom w/new tile, vanity, toilet, new tile work, no structural work, no layout changeDetails
renovate kitchen w/new cabinets, granite top & appliances, renovate bathroom w/new tile, vanity, toilet, new tile work, no structural work, no layout change | $20,000 |
| Aug 13, 2018 | Completed final sign-off Oct 2018 | 41 Seward St | #3: renovate bathroom with tile, toilet and vanity, no structural layout changes.Details
#3: renovate bathroom with tile, toilet and vanity, no structural layout changes. | $10,000 |
| Jul 30, 2018 | Completed final sign-off May 2019 | 49 Warren Dr | 1st flr- enclose space under living room and dining rm, and remodel (e) interior to have a family rm, two bedrooms and a full bath. 2nd flr- repair (e) wood deck in kindDetails
1st flr- enclose space under living room and dining rm, and remodel (e) interior to have a family rm, two bedrooms and a full bath. 2nd flr- repair (e) wood deck in kind | $68,000 |
| May 24, 2018 | Completed final sign-off Oct 2018 | 2040 Franklin St | #1409: remodel kitchen & bathrooms, remodel non-bearing partitions, add new dropped cieling & led lights. moving exhaust fans.Details
#1409: remodel kitchen & bathrooms, remodel non-bearing partitions, add new dropped cieling & led lights. moving exhaust fans. | $85,000 |
| Jun 26, 2017 | Completed final sign-off Dec 2017 | 1259 Union St | 1st floor: convert existing exercise room to a bedroom, add a full bathroom. 2nd floor: relocate existing bthroom, add a interior spiral stair.Details
1st floor: convert existing exercise room to a bedroom, add a full bathroom. 2nd floor: relocate existing bthroom, add a interior spiral stair. | $40,000 |
| Jan 19, 2017 | Completed final sign-off Jun 2017 | 2745 Balboa St | renovate kitchen w/new cabinets, counter & sink; renovate bathrooms w/new bathtub, tile & toilets; install new vinyl window in bathroom & bedrooms. all work will have no structural or layout change.Details
renovate kitchen w/new cabinets, counter & sink; renovate bathrooms w/new bathtub, tile & toilets; install new vinyl window in bathroom & bedrooms. all work will have no structural or layout change. | $40,000 |
| Oct 20, 2016 | Completed final sign-off Dec 2016 | 975 Church St | middle unit- renovate kitchen with new cabinets, countertop and appliances, renovate bathroom with new tiles, toilet and vanity, no layout & structural change, same in kind. kitchen & bathroom remodel in kind.Details
middle unit- renovate kitchen with new cabinets, countertop and appliances, renovate bathroom with new tiles, toilet and vanity, no layout & structural change, same in kind. kitchen & bathroom remodel in kind. | $35,000 |
| Oct 6, 2016 | Completed final sign-off Mar 2017 | 385 Valdez Av | renovate 2nd floor bathroom with new tiles, vanity and toilet. rise the landing in the ground floor and relocate the washer, dryer and put a partition wall to seperate garage and rooms.Details
renovate 2nd floor bathroom with new tiles, vanity and toilet. rise the landing in the ground floor and relocate the washer, dryer and put a partition wall to seperate garage and rooms. | $30,000 |
| Sep 20, 2016 | Completed final sign-off Dec 2016 | 3026 Clement St | install a laundry machine in the sunroom and 2nd bath in the master closet in the second floor - reference ppa#201607293788Details
install a laundry machine in the sunroom and 2nd bath in the master closet in the second floor - reference ppa#201607293788 | $20,000 |
| Jul 29, 2016 | Completed final sign-off Dec 2016 | 3026 Clement St | renovate bathroom with new tile, vanity & toilet and half bath with new tile. change new cabinets, counter & floor in the kitchen with the same layout. change rear windows with same size and layout. maher naDetails
renovate bathroom with new tile, vanity & toilet and half bath with new tile. change new cabinets, counter & floor in the kitchen with the same layout. change rear windows with same size and layout. maher na | $20,000 |
| Jul 18, 2016 | Completed final sign-off May 2018 | 3 Elizabeth St | story horiz. addition in the space of the (e) old rear addition enclosed stair @ side yard;legalize and reconfigure area @ 1st floor; (2/f: add half bath;remodel(e) full bath on 2/f); interior kitchen remodel (remove (e) structural beam).Details
story horiz. addition in the space of the (e) old rear addition enclosed stair @ side yard;legalize and reconfigure area @ 1st floor; (2/f: add half bath;remodel(e) full bath on 2/f); interior kitchen remodel (remove (e) structural beam). | $162,000 |
| May 3, 2016 | Completed final sign-off May 2018 | 985 Church St | per ordinance# 30-15. add a residential unit in 1st floor with a bedroom, a full bath, a kitchen, dining & living area. separated soft bldg pa# 2015/02/05/7657.Details
per ordinance# 30-15. add a residential unit in 1st floor with a bedroom, a full bath, a kitchen, dining & living area. separated soft bldg pa# 2015/02/05/7657. | $78,000 |
| Mar 10, 2016 | Completed final sign-off Jul 2016 | 2458 17th Av | to construct one bedroom, 1 living room, bathroom in the 1st flr only. no structural/layout change, all work on 1/f.Details
to construct one bedroom, 1 living room, bathroom in the 1st flr only. no structural/layout change, all work on 1/f. | $35,000 |
| Mar 4, 2016 | Completed final sign-off Apr 2017 | 155 Eureka St | revision to pa #201505277282 - relocate kitchen & bath fixtures. replace two windows with sliding door, minor adjustment of walls & doors.Details
revision to pa #201505277282 - relocate kitchen & bath fixtures. replace two windows with sliding door, minor adjustment of walls & doors. | $600 |
| May 27, 2015 | Completed final sign-off Apr 2017 | 155 Eureka St | construct unit on the 1st fl with bathroom, kitchen and bedroom and living room. sprinklers per nfpa-13 in new living space and egress path only, under separate permitDetails
construct unit on the 1st fl with bathroom, kitchen and bedroom and living room. sprinklers per nfpa-13 in new living space and egress path only, under separate permit | $30,000 |
| Jun 26, 2014 | Completed final sign-off Oct 2014 | 192 Valley St | change kitchen cabinets, tile floor & recess light, new bathroom, vanity, shower and tile floor.Details
change kitchen cabinets, tile floor & recess light, new bathroom, vanity, shower and tile floor. | $20,000 |
| Apr 28, 2014 | Completed final sign-off Aug 2014 | 1417 40th Av | addition of 2nd bathroom, change kitchen floor counter and cabinets, new paint and recess lighting. no layout change.Details
addition of 2nd bathroom, change kitchen floor counter and cabinets, new paint and recess lighting. no layout change. | $30,000 |
| Apr 2, 2014 | Completed final sign-off Jul 2014 | 1464 07th Av | remove cabinet, new cabinet with floor tile, change new counter and two bathrooms with same layout. no walls added, removed or moved, all fixture layouts to remain unchangedDetails
remove cabinet, new cabinet with floor tile, change new counter and two bathrooms with same layout. no walls added, removed or moved, all fixture layouts to remain unchanged | $25,000 |
| Jan 24, 2014 | Completed final sign-off Jan 2015 | 401 Ellsworth St | relocate bathroom on 2/f; add new bathroom on 3/f; and renovate (e) bathroom on 3/f.Details
relocate bathroom on 2/f; add new bathroom on 3/f; and renovate (e) bathroom on 3/f. | $35,000 |
| Dec 13, 2013 | Completed final sign-off Mar 2014 | 810 24th Av | retile bathroom, vanity, toilet, new electrical for upper floor, new cabinets and floor tile, new lighting. no layout change in kitchen and bathroom.Details
retile bathroom, vanity, toilet, new electrical for upper floor, new cabinets and floor tile, new lighting. no layout change in kitchen and bathroom. | $35,000 |
| Dec 10, 2013 | Completed final sign-off Jan 2015 | 401 Ellsworth St | remove kitchen cabinets, change floor tile and bathroom tileDetails
remove kitchen cabinets, change floor tile and bathroom tile | $20,000 |
| Nov 15, 2013 | Completed final sign-off Mar 2014 | 2251 Cecilia Av | renovate kitchen, bathroom, no layout change, new electrical work for whole house, new laundry area.Details
renovate kitchen, bathroom, no layout change, new electrical work for whole house, new laundry area. | $20,000 |
| Sep 10, 2013 | Completed final sign-off Apr 2014 | 1213 03rd Av | convert (e) closet into a new bathroom, change new kitchen cabinets with tile floor. new lightinhs, sand hardwood floor, paint.Details
convert (e) closet into a new bathroom, change new kitchen cabinets with tile floor. new lightinhs, sand hardwood floor, paint. | $18,000 |
| Jun 10, 2013 | Completed final sign-off Aug 2013 | 2594 Mcallister St | renovate kitchen, bathroom in 2nd floor, add a new bathroom in attic, contral furnace in attic, new painting, add laundry hook up.Details
renovate kitchen, bathroom in 2nd floor, add a new bathroom in attic, contral furnace in attic, new painting, add laundry hook up. | $20,000 |
| Sep 28, 2012 | Completed final sign-off Dec 2012 | 357 10th Av | change windows (no sizes or layout changes). new central furnace for the floor. new paint & hardwood floors. install a new bathroom at the rear with no structural workDetails
change windows (no sizes or layout changes). new central furnace for the floor. new paint & hardwood floors. install a new bathroom at the rear with no structural work | $14,000 |
| Sep 7, 2012 | Never finaled issued Sep 2012, no final | 357 10th Av | change kitchen cabinets (portion), sink & tile floor, change bathroom tile (portion), fix leak, change toilet, vanity, new receptacles for bedrooms, lights, hardwood floor sanding.Details
change kitchen cabinets (portion), sink & tile floor, change bathroom tile (portion), fix leak, change toilet, vanity, new receptacles for bedrooms, lights, hardwood floor sanding. | $8,500 |
| May 17, 2012 | Completed final sign-off Aug 2012 | 985 Church St | #6- change bathroom tile to fix leak and replace water saving toilet, change part of old cabinets, new stove, new paint and sand hardwood floor.Details
#6- change bathroom tile to fix leak and replace water saving toilet, change part of old cabinets, new stove, new paint and sand hardwood floor. | $7,500 |
| Mar 16, 2012 | Completed final sign-off May 2012 | 985 Church St | apt #4-change bathroom tile with new vanity & change cabinets in the kitchen wuth same layoutDetails
apt #4-change bathroom tile with new vanity & change cabinets in the kitchen wuth same layout | $7,000 |
| Feb 17, 2012 | Completed final sign-off May 2012 | 985 Church St | change bathroom with new tile , variety and change cabinets in that kitchen with the same layout. apt. 2Details
change bathroom with new tile , variety and change cabinets in that kitchen with the same layout. apt. 2 | $3,000 |
| Dec 6, 2011 | Completed final sign-off Feb 2012 | 1026 Noriega St | build laundry room in the 1st floor (garage level) with new tile for the existing bathroom & paint the bedroom, retile shower pan, sheetrock garage in 1st floor.Details
build laundry room in the 1st floor (garage level) with new tile for the existing bathroom & paint the bedroom, retile shower pan, sheetrock garage in 1st floor. | $10,000 |
| Jul 12, 2011 | Completed final sign-off Aug 2011 | 1055 Monterey Bl | remodel master bathroom with new tile, vanity and lights, new laundry utilities in the 2nd floor with plumbing hook up (no layout changes).Details
remodel master bathroom with new tile, vanity and lights, new laundry utilities in the 2nd floor with plumbing hook up (no layout changes). | $4,000 |
| Apr 26, 2011 | Completed final sign-off Dec 2011 | 12 Lexington St | unit #14-remodel/relocate kitchen, dining room, bathroom & laundry room on main level. add a toilet room (bathroom)Details
unit #14-remodel/relocate kitchen, dining room, bathroom & laundry room on main level. add a toilet room (bathroom) | $25,000 |
| Apr 12, 2011 | Completed final sign-off Aug 2011 | 4432 California St | 2nd floor rear unit interior renovation: relocate extg kitchen,change kitchen space into bedroom. remodel extg bath, and comply with complaint #201071544.Details
2nd floor rear unit interior renovation: relocate extg kitchen,change kitchen space into bedroom. remodel extg bath, and comply with complaint #201071544. | $23,000 |
| Nov 19, 2010 | Completed final sign-off Mar 2011 | 3547 23rd St | renovate existing bathroom, add a new full bath, add a new wet bar in dining room. work in 1st floorDetails
renovate existing bathroom, add a new full bath, add a new wet bar in dining room. work in 1st floor | $20,000 |
| Oct 19, 2010 | Completed final sign-off Mar 2011 | 3547 23rd St | work on #3547 only - remodel kitchen with new cabinets, lights, counter. remodel bathroom with new tile, tub, toilets with no structural & no layout changes, no wall relocation. min. 50% of kitchen light watts to be h.e., h.e. lights or "manual on" 0.5 in bath.Details
work on #3547 only - remodel kitchen with new cabinets, lights, counter. remodel bathroom with new tile, tub, toilets with no structural & no layout changes, no wall relocation. min. 50% of kitchen light watts to be h.e., h.e. lights or "manual on" 0.5 in bath. | $20,000 |
| Aug 27, 2010 | Completed final sign-off Nov 2010 | 442 Moscow St | new family room, new laundry room and new full bath room at first/ garage level.Details
new family room, new laundry room and new full bath room at first/ garage level. | $25,000 |
| Aug 2, 2010 | Completed final sign-off Oct 2010 | 1433 Dolores St | remodel ktichen, 1-1/2 bathrooms with new cabinets, new tiles, & lightings with no change in layout. work at #1433 only. non-structural work, in-kind.Details
remodel ktichen, 1-1/2 bathrooms with new cabinets, new tiles, & lightings with no change in layout. work at #1433 only. non-structural work, in-kind. | $11,000 |
| Oct 19, 2009 | Completed final sign-off Jan 2010 | 425 San Miguel St | legalize 2 bedrooms, 1 full bathroom & laundry room on 1st floor. remodel 2 bathrooms & kitchen on 2nd floor. renew furnace pipes.Details
legalize 2 bedrooms, 1 full bathroom & laundry room on 1st floor. remodel 2 bathrooms & kitchen on 2nd floor. renew furnace pipes. | $30,000 |
| Oct 9, 2009 | Completed final sign-off Nov 2009 | 81 Aquavista Wy | remodel full bath with new tile, sink and faucets with layout in kind. new shower stall with new faucet and tile in 2nd bathroomDetails
remodel full bath with new tile, sink and faucets with layout in kind. new shower stall with new faucet and tile in 2nd bathroom | $13,100 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 2143 30th Av | install playroom, remodel bathroom, convert family room into 1 bedroom & storage room @ ground floor. split upper floor bathroom into 2 bathrooms. legalize (e) work in garage areaDetails
install playroom, remodel bathroom, convert family room into 1 bedroom & storage room @ ground floor. split upper floor bathroom into 2 bathrooms. legalize (e) work in garage area | $5,000 |
| Jun 19, 2009 | Completed final sign-off Nov 2009 | 121 Randolph St | legalize/relocate bathroom on groudn floor (garage), replace water heater & furnace. legalize all partition wallsDetails
legalize/relocate bathroom on groudn floor (garage), replace water heater & furnace. legalize all partition walls | $12,000 |
| Apr 24, 2009 | Expired or cancelled expired Feb 2012 | 25 Mercedes Wy | remodel the maids bathroom with new sink, shower and toilet, new tile, no structural change.Details
remodel the maids bathroom with new sink, shower and toilet, new tile, no structural change. | $7,037 |
| Jan 9, 2009 | Completed final sign-off May 2009 | 204 22nd Av | remodel kitchen, bathroom with new tile, new cabinets and countertop. no structural work. also to incl furnace work. kitchen & bathroom location and size to remain the same. no new walls. no modification of existing walls.Details
remodel kitchen, bathroom with new tile, new cabinets and countertop. no structural work. also to incl furnace work. kitchen & bathroom location and size to remain the same. no new walls. no modification of existing walls. | $62,000 |
| Jan 9, 2009 | Completed final sign-off Aug 2009 | 83 Warren Dr | build 1 bedroom, 1 bath, 1 family room, laundry area on ground floor. no structural work. kitchen remodel on separate permitDetails
build 1 bedroom, 1 bath, 1 family room, laundry area on ground floor. no structural work. kitchen remodel on separate permit | $45,000 |
| Aug 25, 2008 | Expired or cancelled expired Jun 2009 | 176 Eastwood Dr | remodel kitchen, add new full bathroom in 2nd fl, new tile, vanity & painting. conversion of (e) closet to bathroom use.Details
remodel kitchen, add new full bathroom in 2nd fl, new tile, vanity & painting. conversion of (e) closet to bathroom use. | $6,000 |
| Aug 1, 2008 | Completed final sign-off Sep 2008 | 878 35th Av | remodel kitchen with new cabinets, lights (fluorescent), and tile countertop. remodel bathroom with new tub, fan, lights and no change in layout. no structural.Details
remodel kitchen with new cabinets, lights (fluorescent), and tile countertop. remodel bathroom with new tub, fan, lights and no change in layout. no structural. | $8,000 |
| Jun 12, 2008 | Expired or cancelled expired Aug 2012 | 53 Warren Dr | add one bedroom, one bath and one family room at ground floor. switch the toilet and sink in one of (e) bath. cabinets, appliances and flooringDetails
add one bedroom, one bath and one family room at ground floor. switch the toilet and sink in one of (e) bath. cabinets, appliances and flooring | $35,000 |
| May 30, 2008 | Expired or cancelled expired May 2010 | 4430 California St | unit # 5: remodel kitfchen, bathroom with new tiles, cabinets, carpets and painting for unit #5 with same layout. no change in floor plan. all fourescent in kitchen area, sensor occupant for bathroom, no new exhaust fan.Details
unit # 5: remodel kitfchen, bathroom with new tiles, cabinets, carpets and painting for unit #5 with same layout. no change in floor plan. all fourescent in kitchen area, sensor occupant for bathroom, no new exhaust fan. | $5,000 |
| May 1, 2008 | Completed final sign-off Nov 2008 | 143 Pierce St | construct partition wall in kitchen, new half bathroom, new door to the bathroom from main hallway, remodel kitchen on 2nd floor.Details
construct partition wall in kitchen, new half bathroom, new door to the bathroom from main hallway, remodel kitchen on 2nd floor. | $5,000 |
| Dec 13, 2007 | Completed final sign-off Jan 2008 | 188 Morningside Dr | remodel bathroom with new tile, faucets and toilets. light fixtures to be flourescent or on occupant sensor. no structural workDetails
remodel bathroom with new tile, faucets and toilets. light fixtures to be flourescent or on occupant sensor. no structural work | $6,400 |
| Nov 28, 2007 | Completed final sign-off Dec 2007 | 3043 Noriega St | legalize the game room, bathroom and laundry area on the ground floor.Details
legalize the game room, bathroom and laundry area on the ground floor. | $5,000 |
| Nov 28, 2007 | Expired or cancelled expired Apr 2010 | 3543 23rd St | to comply the nov#200726191 to remodel 1 kitchen with new (2) cabinets and new bathroom with new tile.Details
to comply the nov#200726191 to remodel 1 kitchen with new (2) cabinets and new bathroom with new tile. | $10,000 |
| Nov 1, 2007 | Never finaled issued Nov 2007, no final | 879 38th Av | work on unit#1,#2 . remodel (3) kitchen with new cabinets, (3) bathrooms with new tile. change rear 6 windows.Details
work on unit#1,#2 . remodel (3) kitchen with new cabinets, (3) bathrooms with new tile. change rear 6 windows. | $31,000 |
| Oct 3, 2007 | Completed final sign-off Jun 2010 | 862 32nd Av | new rear addition to add study room on the ground floor. legalize family room and guest room on the ground floor. remodel kitchen on the 2nd floor. remodel bath on the 3rd floor.Details
new rear addition to add study room on the ground floor. legalize family room and guest room on the ground floor. remodel kitchen on the 2nd floor. remodel bath on the 3rd floor. | $180,000 |
| Aug 15, 2007 | Never finaled issued Feb 2008, no final | 1859 30th Av | rear addition (site permit 2 stories addtion/add family froom, study, bath @ ground floor.Details
rear addition (site permit 2 stories addtion/add family froom, study, bath @ ground floor. | $120,000 |
| May 3, 2007 | Completed final sign-off Nov 2007 | 3043 Noriega St | remodel kitchen with new cabinets & sink, bathroom with new tile & vanity with no layout change. min 50% kitchen lights are flurescent, & bathroom light incondelscentwith control by o.s.Details
remodel kitchen with new cabinets & sink, bathroom with new tile & vanity with no layout change. min 50% kitchen lights are flurescent, & bathroom light incondelscentwith control by o.s. | $15,000 |
| Mar 22, 2007 | Expired or cancelled expired Apr 2010 | 1535 Ortega St | interior: ist floor to add a bedroom. a guest room, a bath and exercise room. on 2nd floor: remodel (e0 kitchen, living room, bedrooms. exterior: repair (e) deck and stair in rear of bldng. enclose space below sunroom for exercise room.Details
interior: ist floor to add a bedroom. a guest room, a bath and exercise room. on 2nd floor: remodel (e0 kitchen, living room, bedrooms. exterior: repair (e) deck and stair in rear of bldng. enclose space below sunroom for exercise room. | $32,000 |
| Nov 29, 2006 | Completed final sign-off Jul 2007 | 3926 Ulloa St | remodel kitchen, bathroom in 2nd floor with all new wiring, build a bedroom, bathroom, laundry room with new windows in the groundfloorDetails
remodel kitchen, bathroom in 2nd floor with all new wiring, build a bedroom, bathroom, laundry room with new windows in the groundfloor | $30,000 |
| Jun 15, 2006 | Expired or cancelled expired Dec 2006 | 1535 Ortega St | remodel kitchen, 2 bath with new cabinets, tiles & lighting. 50% of lighting to be flourecent or sensor in bath.Details
remodel kitchen, 2 bath with new cabinets, tiles & lighting. 50% of lighting to be flourecent or sensor in bath. | $15,000 |
| Feb 8, 2006 | Completed final sign-off May 2006 | 176 Belvedere St | remodel kitchen ,bathroom, new cabinets, painting and new light, tile works, no structural only.Details
remodel kitchen ,bathroom, new cabinets, painting and new light, tile works, no structural only. | $10,000 |
| Jan 24, 2006 | Completed final sign-off Apr 2006 | 2154 29th Av | basement remodeling of a single family dwelling with 2 baths. 1 office, 1 bedroom & laundry room at 1st floor. no structural work.Details
basement remodeling of a single family dwelling with 2 baths. 1 office, 1 bedroom & laundry room at 1st floor. no structural work. | $15,000 |
| Aug 23, 2005 | Expired or cancelled expired Mar 2008 | 265 24th Av | to comply with n.o.v. #200562534 to remodel 3 additional units kitchen baths and replace approximateDetails
to comply with n.o.v. #200562534 to remodel 3 additional units kitchen baths and replace approximate | $100,000 |
| Apr 8, 2005 | Completed final sign-off Jun 2005 | 3545 23rd St | remodel bathroom, kitchen and install new furnance system. no structural work.Details
remodel bathroom, kitchen and install new furnance system. no structural work. | $20,000 |
| Feb 22, 2005 | Completed final sign-off Apr 2005 | 149 Kensington Wy | remofdel downstairs bathroom, painting, and minsc. repair ((e) bathrm in the lower level)Details
remofdel downstairs bathroom, painting, and minsc. repair ((e) bathrm in the lower level) | $6,500 |
| Oct 8, 2004 | Expired or cancelled expired May 2007 | 418 35th Av | remodel kitchens, bathroom & change of windows same size. at the rear side of the bldg. not visibleDetails
remodel kitchens, bathroom & change of windows same size. at the rear side of the bldg. not visible | $17,500 |
| Oct 8, 2004 | Never finaled issued Oct 2004, no final | 1405 29th Av | remodel bathroom with new tile, fan.Details
remodel bathroom with new tile, fan. | $4,000 |
| Sep 28, 2004 | Never finaled issued Sep 2004, no final | 2515 29th Av | add a new bathroom in the 2nd floor @ old closet.Details
add a new bathroom in the 2nd floor @ old closet. | $6,000 |
| Aug 10, 2004 | Completed final sign-off Oct 2004 | 2515 29th Av | remodel kitchen with new cabinets and bathrooms in the 2nd floorDetails
remodel kitchen with new cabinets and bathrooms in the 2nd floor | $11,000 |
| Aug 10, 2004 | Completed final sign-off Oct 2004 | 3545 23rd St | remodel kitchen, bathroom with new paintingDetails
remodel kitchen, bathroom with new painting | $11,000 |
| Jun 8, 2004 | Completed final sign-off Oct 2004 | 2515 29th Av | no structural work- remodel bathroom in the 2nd floor with new tile, tub, vanity & lightingDetails
no structural work- remodel bathroom in the 2nd floor with new tile, tub, vanity & lighting | $5,000 |
| Jun 4, 2004 | Completed final sign-off Nov 2004 | 201 Claremont Bl | to build 2 bedrooms 1 laundry room and full bath in the basement levelDetails
to build 2 bedrooms 1 laundry room and full bath in the basement level | $20,000 |
| May 18, 2004 | Completed final sign-off Oct 2004 | 2150 Alemany Bl | to comply compliant #200448943 to legalize rooms in garage level (1 full bath,laundry,storage,bedrm)Details
to comply compliant #200448943 to legalize rooms in garage level (1 full bath,laundry,storage,bedrm) | $7,000 |
| Apr 13, 2004 | Completed final sign-off Dec 2004 | 3857 22nd St | kitchen and family room remodel and relocate bathroomDetails
kitchen and family room remodel and relocate bathroom | $25,000 |
| Mar 17, 2004 | Completed final sign-off Apr 2004 | 65 Badger St | revision to #200402106088 to clarify that scope of work is to add new shower to the (e) half bath atDetails
revision to #200402106088 to clarify that scope of work is to add new shower to the (e) half bath at | $2,000 |
| Mar 16, 2004 | Expired or cancelled expired Feb 2009 | 2511 29th Av | remodel bathroom with the same layout in the 2nd floorDetails
remodel bathroom with the same layout in the 2nd floor | $4,000 |
| Mar 16, 2004 | Completed final sign-off Nov 2004 | 201 Claremont Bl | to remodel kitchen & no structural work. bathroomsDetails
to remodel kitchen & no structural work. bathrooms | $9,000 |
| Dec 3, 2003 | Never finaled issued Dec 2003, no final | 111 Forest View Dr | remodel 2nd bathroom on 2nd floor with new tile, sink, and toiletDetails
remodel 2nd bathroom on 2nd floor with new tile, sink, and toilet | $4,000 |
| Sep 19, 2003 | Never finaled issued Sep 2003, no final | 111 Forest View Dr | remodel bathroom in 2nd fl, change to new tile, tub, toilet and vanity.Details
remodel bathroom in 2nd fl, change to new tile, tub, toilet and vanity. | $6,000 |
| Sep 16, 2003 | Completed final sign-off Nov 2003 | 1366 17th Av | remodel bathroom in th unit.Details
remodel bathroom in th unit. | $4,000 |
| Aug 21, 2003 | Completed final sign-off Mar 2004 | 1605 Fulton St | to construct basement with two bedrooms storage rooms, and two bathroomsDetails
to construct basement with two bedrooms storage rooms, and two bathrooms | $25,000 |
| Aug 4, 2003 | Completed final sign-off May 2004 | 1170 Rhode Island St | expansion of existing bathroom w/ small lateral additionDetails
expansion of existing bathroom w/ small lateral addition | $15,000 |