Back to kitchen remodel contractors
Ying Chi Wong
- Based in
- San Bruno
- On San Francisco permits
- Jul 2000 to Jan 2016
- Last 24 months
- 0 permits filed
17 permits since 2000: 17 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2015 | Completed final sign-off May 2015 | 2548 24th Av | replace 3 windows: one in room, one in kitchen, one in living room (aluminum) casement/fixed/casement at front.Details
replace 3 windows: one in room, one in kitchen, one in living room (aluminum) casement/fixed/casement at front. | $2,100 |
| Nov 18, 2013 | Completed final sign-off Apr 2014 | 1638 33rd Av | interior remodel: add one bathroom access from bedroom on second floor. divide existing family room into bedroom and framily room iwth full bath on first floor. kitchen remodel. replace all windows in kind.Details
interior remodel: add one bathroom access from bedroom on second floor. divide existing family room into bedroom and framily room iwth full bath on first floor. kitchen remodel. replace all windows in kind. | $53,000 |
| Oct 4, 2012 | Completed final sign-off Mar 2013 | 2 Meda Av | add one bedroom, one bathroom & mudroom on 1st floor per plan. remodel kitchen on 2nd floor & bathroom on 3rd floor in kind.Details
add one bedroom, one bathroom & mudroom on 1st floor per plan. remodel kitchen on 2nd floor & bathroom on 3rd floor in kind. | $28,000 |
| Jun 8, 2011 | Completed final sign-off Jul 2011 | 2759 35th Av | remodeling 2nd flr kitchen, replace all existing cabinets, counter top and all fixtures, approx 150 sq.ft. lighting changes must comply with cec 150(k)Details
remodeling 2nd flr kitchen, replace all existing cabinets, counter top and all fixtures, approx 150 sq.ft. lighting changes must comply with cec 150(k) | $15,000 |
| May 11, 2009 | Completed final sign-off Jul 2009 | 2301 Ulloa St | tore down 3 bedroom's plaster & install new sheetrocks & insulation on outside walls & ceiling. install new sheetrocks & cabinets & fixture in kitchen. install new sheetrocks, fixture & tiles in bathroom.Details
tore down 3 bedroom's plaster & install new sheetrocks & insulation on outside walls & ceiling. install new sheetrocks & cabinets & fixture in kitchen. install new sheetrocks, fixture & tiles in bathroom. | $38,000 |
| Dec 12, 2007 | Completed final sign-off Jan 2008 | 6339 California St | replace all kitchen cabinets and replace all tiles and fixtures in bathroom.Details
replace all kitchen cabinets and replace all tiles and fixtures in bathroom. | $14,000 |
| May 19, 2004 | Completed final sign-off Jul 2004 | 1850 Clay St | replace six wall cabinets in kitchen and new tiles counter top and replace tiles in bathroom.Details
replace six wall cabinets in kitchen and new tiles counter top and replace tiles in bathroom. | $5,580 |