Back to bathroom remodel contractors
Ying Chi Wong
- Based in
- San Bruno
- On San Francisco permits
- Jul 2000 to Jan 2016
- Last 24 months
- 0 permits filed
17 permits since 2000: 17 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 2 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2013 | Completed final sign-off Apr 2014 | 1638 33rd Av | interior remodel: add one bathroom access from bedroom on second floor. divide existing family room into bedroom and framily room iwth full bath on first floor. kitchen remodel. replace all windows in kind.Details
interior remodel: add one bathroom access from bedroom on second floor. divide existing family room into bedroom and framily room iwth full bath on first floor. kitchen remodel. replace all windows in kind. | $53,000 |
| May 16, 2013 | Completed final sign-off Dec 2013 | 770 Joost Av | legalize one bathroom on 1st floor per plan. new media room in lieu of storage @ first floor.Details
legalize one bathroom on 1st floor per plan. new media room in lieu of storage @ first floor. | $18,000 |
| Oct 4, 2012 | Completed final sign-off Mar 2013 | 2 Meda Av | add one bedroom, one bathroom & mudroom on 1st floor per plan. remodel kitchen on 2nd floor & bathroom on 3rd floor in kind.Details
add one bedroom, one bathroom & mudroom on 1st floor per plan. remodel kitchen on 2nd floor & bathroom on 3rd floor in kind. | $28,000 |
| Jun 6, 2012 | Completed final sign-off Feb 2013 | 762 33rd Av | 3rd floor-add 1 bathroom per planDetails
3rd floor-add 1 bathroom per plan | $10,000 |
| May 11, 2009 | Completed final sign-off Jul 2009 | 2301 Ulloa St | tore down 3 bedroom's plaster & install new sheetrocks & insulation on outside walls & ceiling. install new sheetrocks & cabinets & fixture in kitchen. install new sheetrocks, fixture & tiles in bathroom.Details
tore down 3 bedroom's plaster & install new sheetrocks & insulation on outside walls & ceiling. install new sheetrocks & cabinets & fixture in kitchen. install new sheetrocks, fixture & tiles in bathroom. | $38,000 |
| Dec 12, 2007 | Completed final sign-off Jan 2008 | 6339 California St | replace all kitchen cabinets and replace all tiles and fixtures in bathroom.Details
replace all kitchen cabinets and replace all tiles and fixtures in bathroom. | $14,000 |
| May 19, 2004 | Completed final sign-off Jul 2004 | 1850 Clay St | replace six wall cabinets in kitchen and new tiles counter top and replace tiles in bathroom.Details
replace six wall cabinets in kitchen and new tiles counter top and replace tiles in bathroom. | $5,580 |