Yerba Buena Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Aug 2026
- Last 24 months
- 3 permits filed
98 permits since 2000: 60 completed, 5 in progress, 26 never finaled, 7 expired or cancelled.
Of the 26 never-finaled permits, 13 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 1 completed, 2 in progress, 1 never finaled. Typically 22 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2025 | In progress issued Jan 2026 | 5 Freelon St | ti for partial demo of (e) doors, partitions, ceiling, lighting, electrical and tel/data receptacles, stairs and finishes at both floors of a two story low rise office building. construction of (n) partitions, doors, glazing, ceiling, lighting, electrical andtel/data receptacles. project modifiesDetails
ti for partial demo of (e) doors, partitions, ceiling, lighting, electrical and tel/data receptacles, stairs and finishes at both floors of a two story low rise office building. construction of (n) partitions, doors, glazing, ceiling, lighting, electrical andtel/data receptacles. project modifies | $1,200,000 |
| Mar 13, 2024 | In progress filed Mar 2024, not yet issued | 680 08th St | remodel 1 exit stair: replace (e) handrails. raise tops of guards to 42" above nosings. reinstall (e) doors to swing in direction of exit travel. install contrasting color nosing strips. level & reinforce (e) bottom landing to swing in direction of exit travel. remove (e) hatch door & patch opening.Details
remodel 1 exit stair: replace (e) handrails. raise tops of guards to 42" above nosings. reinstall (e) doors to swing in direction of exit travel. install contrasting color nosing strips. level & reinforce (e) bottom landing to swing in direction of exit travel. remove (e) hatch door & patch opening. | $5,000 |
| Sep 5, 2017 | Never finaled issued Sep 2017, no final | 555 Clay St | removal of interior, non load bearing partitions, remove stair, replace finishes and fixtures.n/a for maherDetails
removal of interior, non load bearing partitions, remove stair, replace finishes and fixtures.n/a for maher | $30,000 |
| Jun 7, 2012 | Completed final sign-off Sep 2012 | 555 04th St | t.i of (e)vacant retail space for art gallery (change of use m to a). includes new non-rated partitions, new storefront entry doors at (e) location, new topping slab at floor, (n)mezz stair,toilet room, kitchenette, storage and office. sprinkler, mech, fire alarm sep permit.Details
t.i of (e)vacant retail space for art gallery (change of use m to a). includes new non-rated partitions, new storefront entry doors at (e) location, new topping slab at floor, (n)mezz stair,toilet room, kitchenette, storage and office. sprinkler, mech, fire alarm sep permit. | $145,000 |