Back to kitchen remodel contractors
Yerba Buena Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Aug 2026
- Last 24 months
- 3 permits filed
98 permits since 2000: 60 completed, 5 in progress, 26 never finaled, 7 expired or cancelled.
Of the 26 never-finaled permits, 13 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 8 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2024 | Completed final sign-off Jul 2025 | 1725 Kearny St | remodel kitchen and 2 baths at unit #2, 2nd fl level. install new cabinets and appliances and finishes. no structural work proposed. no work to exterior.Details
remodel kitchen and 2 baths at unit #2, 2nd fl level. install new cabinets and appliances and finishes. no structural work proposed. no work to exterior. | $100,000 |
| Sep 27, 2023 | In progress issued Oct 2023 | 245 05th St | unit# 110: remodel existing residential/commercial space at 1/f add new enclosed office and wet bar, 2/f add new residential kitchen and bathroom, upgrade unisex restroom for disabled access, replace doors at existing bedroom.Details
unit# 110: remodel existing residential/commercial space at 1/f add new enclosed office and wet bar, 2/f add new residential kitchen and bathroom, upgrade unisex restroom for disabled access, replace doors at existing bedroom. | $64,000 |
| Oct 7, 2022 | Completed final sign-off May 2023 | 435 Brannan St | ti at first floor, convert existing rooms into a conference room, remodel kitchen, provide disabled accessible unisex restroom and add accessible drinking fountain and acessible handwash sink.add ada push button at entrance in kindDetails
ti at first floor, convert existing rooms into a conference room, remodel kitchen, provide disabled accessible unisex restroom and add accessible drinking fountain and acessible handwash sink.add ada push button at entrance in kind | $115,000 |
| Mar 8, 2019 | Completed final sign-off Jun 2019 | 1940 Broadway | #2e -widen existing door opening from 2'6 to 5'4 between kitchen and dining in non-structural partiton. relocate kitchen cabinets on that wall to west wall.Details
#2e -widen existing door opening from 2'6 to 5'4 between kitchen and dining in non-structural partiton. relocate kitchen cabinets on that wall to west wall. | $4,000 |
| Nov 20, 2017 | Expired or cancelled withdrawn Nov 2017 | 555 Clay St | revision to pa #201709056824. relocate door at exit passageway. revise kitchen layout. revise ceiling assembly. maher naDetails
revision to pa #201709056824. relocate door at exit passageway. revise kitchen layout. revise ceiling assembly. maher na | |
| Sep 12, 2014 | Completed final sign-off Feb 2015 | 1425 Vallejo St | kitchen - new cabinets, top, appliances, no structural; no alteration of wall, window and doorDetails
kitchen - new cabinets, top, appliances, no structural; no alteration of wall, window and door | $12,000 |
| Mar 6, 2014 | Completed final sign-off Jun 2014 | 5513 Mission St | remodel kitchen (125 sf)& bath (50 sf) . new cabinets, sink, disposal, plugs, dishwasher. lighting plugs, no chang ein rough-ins @kitchen. new vanity, toilet, sink, finishes, no change in rough-in, new shower w/pan, new tub @ bath. work @ 2nd floor resident only. no structural, no work @ 1st floor.Details
remodel kitchen (125 sf)& bath (50 sf) . new cabinets, sink, disposal, plugs, dishwasher. lighting plugs, no chang ein rough-ins @kitchen. new vanity, toilet, sink, finishes, no change in rough-in, new shower w/pan, new tub @ bath. work @ 2nd floor resident only. no structural, no work @ 1st floor. | $25,000 |
| Oct 25, 2013 | Never finaled issued Oct 2013, no final | 680 08th St | t.i. of extg wholesale showroom space #155 to be used as domestic appliance showroom. work includes new non bearing, not rated partitions, lighting, 2 working demonstration kitchens and active laundry desplay, level extg floors and soffit above hood display. mechanical under separate permit.Details
t.i. of extg wholesale showroom space #155 to be used as domestic appliance showroom. work includes new non bearing, not rated partitions, lighting, 2 working demonstration kitchens and active laundry desplay, level extg floors and soffit above hood display. mechanical under separate permit. | $400,000 |
| Apr 19, 2013 | Completed final sign-off Sep 2013 | 2310 43rd Av | no structural work, new kitchen cabinets, new sink, remove & replace bathroom fixtures in 2 bathrooms.Details
no structural work, new kitchen cabinets, new sink, remove & replace bathroom fixtures in 2 bathrooms. | $9,000 |
| Apr 4, 2013 | Completed final sign-off Jul 2013 | 983 Cayuga Av | comply with nov# 201394921 dated 4/1/13-no structural work. new cabinets, sink, electrical, lighting fixtures. partial abatement ot legalize kitchen remodel on upper level, 1 bathrm remodeling, 1 half bathrm remodel on upper level. no change in walls or opeing layout. seperate permit for lower levelDetails
comply with nov# 201394921 dated 4/1/13-no structural work. new cabinets, sink, electrical, lighting fixtures. partial abatement ot legalize kitchen remodel on upper level, 1 bathrm remodeling, 1 half bathrm remodel on upper level. no change in walls or opeing layout. seperate permit for lower level | $22,700 |
| Jun 7, 2012 | Completed final sign-off Sep 2012 | 555 04th St | t.i of (e)vacant retail space for art gallery (change of use m to a). includes new non-rated partitions, new storefront entry doors at (e) location, new topping slab at floor, (n)mezz stair,toilet room, kitchenette, storage and office. sprinkler, mech, fire alarm sep permit.Details
t.i of (e)vacant retail space for art gallery (change of use m to a). includes new non-rated partitions, new storefront entry doors at (e) location, new topping slab at floor, (n)mezz stair,toilet room, kitchenette, storage and office. sprinkler, mech, fire alarm sep permit. | $145,000 |