Back to kitchen remodel contractors
Yellow Zone Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Sep 2026
- Last 24 months
- 5 permits filed
87 permits since 2000: 77 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
28 kitchen remodel permits: 24 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Sep 2026 | 3232 Buchanan St | to comply with nov#202652319 (item 9) & 202657825, kitchen & bath remodel like kind, unit #3, install disconnect for sub-panel; install water heater; install drain and trap vent in tradesman corridor and legalize unpermitted laundry area in garage. to comply with nov #202652063Details
to comply with nov#202652319 (item 9) & 202657825, kitchen & bath remodel like kind, unit #3, install disconnect for sub-panel; install water heater; install drain and trap vent in tradesman corridor and legalize unpermitted laundry area in garage. to comply with nov #202652063 | $10,000 |
| May 7, 2024 | Completed final sign-off Jul 2024 | 5549 Anza St | kitchen remodel like kindDetails
kitchen remodel like kind | $50,000 |
| Feb 7, 2024 | Completed final sign-off Jun 2024 | 3035 Broderick St | remodel one kitchen like in kind. no structuralDetails
remodel one kitchen like in kind. no structural | $38,000 |
| Nov 16, 2022 | Completed final sign-off Jul 2024 | 125 20th Av | unit 125 - non-structural kitchen bathroom remodel; new kitchen & bat remodel; infill (e) window @ side of bldg & enlarge window @ rear of bldg; relocate (e) tankless hwh. mechanical electrical & plumbing to be design build under separate permitDetails
unit 125 - non-structural kitchen bathroom remodel; new kitchen & bat remodel; infill (e) window @ side of bldg & enlarge window @ rear of bldg; relocate (e) tankless hwh. mechanical electrical & plumbing to be design build under separate permit | $98,000 |
| Dec 27, 2021 | Completed final sign-off Jan 2022 | 1854 38th Av | kitchen remodel like for likeDetails
kitchen remodel like for like | $30,000 |
| Feb 24, 2020 | Completed final sign-off Jun 2020 | 2929 Gough St | kitchen remodel like kindDetails
kitchen remodel like kind | $25,000 |
| Nov 4, 2019 | Completed final sign-off Dec 2019 | 834 26th Av | apt 2: remodel kitchen like in-kind. maher n/a.Details
apt 2: remodel kitchen like in-kind. maher n/a. | $25,000 |
| May 20, 2019 | Completed final sign-off Aug 2019 | 310 Colon Av | 1 kitchen & 1 bath remodel. like kind. no alteration of wall, windows and door.Details
1 kitchen & 1 bath remodel. like kind. no alteration of wall, windows and door. | $45,000 |
| Apr 16, 2019 | Completed final sign-off Jul 2019 | 227 El Camino Del Mar | replace kitchen cabinets and counter topsDetails
replace kitchen cabinets and counter tops | $30,000 |
| Feb 1, 2019 | Completed final sign-off Aug 2019 | 2892 23rd St | interior apartment remodel including remode of (e) kitchen and bathroom, construct new bathroom add washier and dryer hook up, replace (e) hot water heater, replace non street facing windows, mep to desing buildDetails
interior apartment remodel including remode of (e) kitchen and bathroom, construct new bathroom add washier and dryer hook up, replace (e) hot water heater, replace non street facing windows, mep to desing build | $39,000 |
| Dec 28, 2018 | Never finaled issued Dec 2018, no final | 2898 23rd St | kitchen and bathroom remodel. in kind like for like.Details
kitchen and bathroom remodel. in kind like for like. | $34,000 |
| Jan 18, 2018 | Completed final sign-off Mar 2018 | 285 Duncan St | kitchen & bathroom remodel - in-kindDetails
kitchen & bathroom remodel - in-kind | $30,000 |
| May 8, 2015 | Completed final sign-off Jul 2020 | 1651 Larkin St | legalize unit per ordinance no# 43-14. 1 bedroom, 1 office, 1 bathroom, 1 living room & 1 kitchen.Details
legalize unit per ordinance no# 43-14. 1 bedroom, 1 office, 1 bathroom, 1 living room & 1 kitchen. | $15,000 |
| Oct 7, 2014 | Completed final sign-off Jan 2015 | 582 29th St | (1) kitchen remodel.Details
(1) kitchen remodel. | $20,000 |
| Jul 1, 2014 | Completed final sign-off Sep 2014 | 2888 23rd St | revision to app#201405125510. remodel of extg kitchen and bathroom, construct new bathroom, add washer and dryer hook ups. replace extg hot water heater. no strctural or exterior work. electrical, mech, plmg to be design build under seperate permit.Details
revision to app#201405125510. remodel of extg kitchen and bathroom, construct new bathroom, add washer and dryer hook ups. replace extg hot water heater. no strctural or exterior work. electrical, mech, plmg to be design build under seperate permit. | $35,000 |
| May 12, 2014 | Completed final sign-off Sep 2014 | 2888 23rd St | kitchen remodel, 1 bath remodel. 1/2 bath remodelDetails
kitchen remodel, 1 bath remodel. 1/2 bath remodel | $35,000 |
| Apr 11, 2013 | Completed final sign-off Apr 2013 | 921 Post St | revision to app#201301288935 to document as-built conditions, including relocated furnace and entry door, kitchen layout and bathroom layout.Details
revision to app#201301288935 to document as-built conditions, including relocated furnace and entry door, kitchen layout and bathroom layout. | |
| Jan 28, 2013 | Completed final sign-off Apr 2013 | 921 Post St | conversion of (e) basement in 3-story residential unit into new 519 s.f. unit. work to include kitchen and bathroom. addtion and new egress window along alley way.Details
conversion of (e) basement in 3-story residential unit into new 519 s.f. unit. work to include kitchen and bathroom. addtion and new egress window along alley way. | $65,000 |
| Oct 11, 2012 | Completed final sign-off Apr 2013 | 44 Alpine Tr | remodel (e) bath room, kitchen, re-wire electrical & lighting at second fl. remodel (e) bathroom, re-wire electrical & lighting at third fl. remove (e) new concrete foundation (approx 22'-0")Details
remodel (e) bath room, kitchen, re-wire electrical & lighting at second fl. remodel (e) bathroom, re-wire electrical & lighting at third fl. remove (e) new concrete foundation (approx 22'-0") | $48,000 |
| Aug 7, 2012 | Completed final sign-off Apr 2013 | 921 Post St | comply with #201048319 & 200914921-as built conditions for pa# 2012-0202-3452-interior remodel & removal of 3rd floor interior stair to roof. work includes enlarged powder room, re-arranged kitchen island, as well as infilled interior stairwell to roof & infilled stair penthouse doorway.Details
comply with #201048319 & 200914921-as built conditions for pa# 2012-0202-3452-interior remodel & removal of 3rd floor interior stair to roof. work includes enlarged powder room, re-arranged kitchen island, as well as infilled interior stairwell to roof & infilled stair penthouse doorway. | $6,000 |
| Sep 12, 2011 | Completed final sign-off Dec 2011 | 5092 Diamond Heights Bl | #b- replace kitchen cabinets & countertop (one kitchen remodel)Details
#b- replace kitchen cabinets & countertop (one kitchen remodel) | $18,000 |
| Jul 13, 2010 | Expired or cancelled withdrawn Jan 2011 | 256 Stratford Dr | proposed vertical & horizontal addition in rear with new exterior finishes, colors & roof to match existing. proposed kitchen extension include interior improvements & upgrades. proposed addition of master suite include new interior finishes & upgrades. proposed remodel of 2nd story bathroom & deck.Details
proposed vertical & horizontal addition in rear with new exterior finishes, colors & roof to match existing. proposed kitchen extension include interior improvements & upgrades. proposed addition of master suite include new interior finishes & upgrades. proposed remodel of 2nd story bathroom & deck. | $300,000 |
| May 19, 2010 | Completed final sign-off Mar 2011 | 1969 48th Av | install/move kitchen from ground floor to 2nd. flr. convert master bedrm./study to kitchen/dining/liv.rm. ground flr. will become rec. rm. remodel master bathroom.Details
install/move kitchen from ground floor to 2nd. flr. convert master bedrm./study to kitchen/dining/liv.rm. ground flr. will become rec. rm. remodel master bathroom. | $20,000 |
| Aug 22, 2008 | Completed final sign-off Oct 2008 | 70 Ravenwood Dr | kitchen remodel, replace cabinets, coutner top, tile floor, paint, no change to sink, hood, stove, refrigerator.Details
kitchen remodel, replace cabinets, coutner top, tile floor, paint, no change to sink, hood, stove, refrigerator. | $30,000 |
| Jun 3, 2008 | Never finaled issued Jun 2008, no final | 1326 Haight St | replace kitchen cabinet, counter top with like kind. replace bath tiles with like kind. no structural. (e) light fixtures to remain.Details
replace kitchen cabinet, counter top with like kind. replace bath tiles with like kind. no structural. (e) light fixtures to remain. | $20,000 |
| Sep 29, 2006 | Completed final sign-off Mar 2007 | 1516 Hyde St | revised approved appl#200607277827 as request by owner. relocate kitchen @ 1/f, relocate laundry room @ 2/f, delete beam and post @ living room.Details
revised approved appl#200607277827 as request by owner. relocate kitchen @ 1/f, relocate laundry room @ 2/f, delete beam and post @ living room. | |
| Aug 22, 2005 | Completed final sign-off Apr 2006 | 4031 18th St | propsoed remodeling existing 2nd floor and 3rd floor convert existing kitchen to bedrm relocate (e)Details
propsoed remodeling existing 2nd floor and 3rd floor convert existing kitchen to bedrm relocate (e) | $35,000 |
| Aug 3, 2005 | Completed final sign-off Apr 2006 | 4031 18th St | replace kitchen cabinets/appliances,replace bathroom fixtures in both units.Details
replace kitchen cabinets/appliances,replace bathroom fixtures in both units. | $13,000 |