Block 0620, lot 002
1651 Larkin St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 12
- Rooms
- 6 bedrooms, 12 bathrooms
- Building
- 6,900 sq ft
- Lot
- 3,097 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 1, 2024 | Completed final sign-off Apr 2024 | 1651 Larkin St | Kells Construction Inc. | unit# 5 in-kind replacement of cabinets, countertops & appliances in the kitchen. in-kind replacement of tub, vanity & toilet. kitchen is 10 x 12, bath 5 x 8. upgrade electrical panel. no wall changes, no (n) plumbing fixturesDetails
unit# 5 in-kind replacement of cabinets, countertops & appliances in the kitchen. in-kind replacement of tub, vanity & toilet. kitchen is 10 x 12, bath 5 x 8. upgrade electrical panel. no wall changes, no (n) plumbing fixtures | $32,000 |
| May 24, 2023 | Completed final sign-off Aug 2023 | 1651 Larkin St | Kells Construction Inc. | unit# 10: replace kitchen cabinets and appliances. remodel bathroom.Details
unit# 10: replace kitchen cabinets and appliances. remodel bathroom. | $20,000 |
| Oct 4, 2022 | Completed final sign-off Feb 2023 | 1651 Larkin St | Kells Construction Inc. | unit 11 :replace kitchen cabines, appliances, remodel bathroom.Details
unit 11 :replace kitchen cabines, appliances, remodel bathroom. | $20,000 |
| Mar 18, 2021 | Completed final sign-off Jul 2021 | 1651 Larkin St | Byington Electric Corp | new conventional fire alarm panel. new wireless "rf" radio communicator will be installed for central station monitoring new low frequency "lf" horns will be added to the interior residential units. all other existing devices shall remain i.e. smoke detectors, pull stations, water flow/tamper switchDetails
new conventional fire alarm panel. new wireless "rf" radio communicator will be installed for central station monitoring new low frequency "lf" horns will be added to the interior residential units. all other existing devices shall remain i.e. smoke detectors, pull stations, water flow/tamper switch | $15,000 |
| Sep 26, 2017 | Completed final sign-off Apr 2018 | 1651 Larkin St | Fire Guard Protection Inc. | relocate existing sprinkler pipe in rear unit, install sprinkler heads in garage. install new 3 f.d.c.; install new double back flow. ref pa 2015-0508-5843Details
relocate existing sprinkler pipe in rear unit, install sprinkler heads in garage. install new 3 f.d.c.; install new double back flow. ref pa 2015-0508-5843 | $12,000 |
| Sep 20, 2017 | Never finaled issued Sep 2017, no final | 1651 Larkin St | street space | ||
| May 25, 2017 | Never finaled issued May 2017, no final | 1651 Larkin St | street space | ||
| Mar 31, 2016 | Completed final sign-off May 2016 | 1651 Larkin St | unit#12 renovate kitchen & bathroom, no change in opening & wall layout. remove & replace all in-kind. maintain 1-hour construction & separate between units. min. 50% wattage kitchen light high efficacy. high efficacy bath lighting or controlled by manual on sensor w/ high efficacy main lightDetails
unit#12 renovate kitchen & bathroom, no change in opening & wall layout. remove & replace all in-kind. maintain 1-hour construction & separate between units. min. 50% wattage kitchen light high efficacy. high efficacy bath lighting or controlled by manual on sensor w/ high efficacy main light | $20,000 | |
| May 8, 2015 | Completed final sign-off Jul 2020 | 1651 Larkin St | Yellow Zone Construction | legalize unit per ordinance no# 43-14. 1 bedroom, 1 office, 1 bathroom, 1 living room & 1 kitchen.Details
legalize unit per ordinance no# 43-14. 1 bedroom, 1 office, 1 bathroom, 1 living room & 1 kitchen. | $15,000 |
| Mar 6, 2015 | Completed final sign-off Jul 2020 | 1651 Larkin St | Yellow Zone Construction | soft story retrofit per chap 34b mandatory earthquake retrofit of wood frame buildings per 75% requirement.Details
soft story retrofit per chap 34b mandatory earthquake retrofit of wood frame buildings per 75% requirement. | $45,000 |
| Apr 22, 2014 | Never finaled issued Apr 2014, no final | 1651 Larkin St | street space | ||
| Jul 13, 2011 | Completed final sign-off Aug 2011 | 1651 Larkin St | Mountain Bay Construction | replace delaminated wood at landing (exterior) replace wood members if applicable less than 50%.Details
replace delaminated wood at landing (exterior) replace wood members if applicable less than 50%. | $10,000 |
| Oct 20, 2010 | Completed final sign-off Dec 2010 | 1651 Larkin St | Image Construction | apt.#7 bathroom remodel: lower flr. (n) vanity, two toilet like for like location, insulate exterior wall where open w/ r-13, no change to exhaust.Details
apt.#7 bathroom remodel: lower flr. (n) vanity, two toilet like for like location, insulate exterior wall where open w/ r-13, no change to exhaust. | $6,500 |
| Sep 13, 2010 | Completed final sign-off Sep 2010 | 1651 Larkin St | Image Construction | #2: change vanity, new toilet, new bathtub, like for like. no removal or relocation of wall.Details
#2: change vanity, new toilet, new bathtub, like for like. no removal or relocation of wall. | $2,000 |
| Mar 15, 2010 | Completed final sign-off Sep 2010 | 1651 Larkin St | Make Ready Maintenance Inc | unit #2-change kitchen cabinets, countertop, like for like plumbing, elect. fixture upgrade, (n) lighting per cec 150(k). no change to exhaust system. no structural work. comply with his nov #200901261.Details
unit #2-change kitchen cabinets, countertop, like for like plumbing, elect. fixture upgrade, (n) lighting per cec 150(k). no change to exhaust system. no structural work. comply with his nov #200901261. | $10,800 |
| Mar 15, 2010 | Completed final sign-off Dec 2010 | 1651 Larkin St | Make Ready Maintenance Inc | unit #7-change kitchen cabinets, countertop, like for like plumbing, elect. fixture upgrade, (n) lighting per cec 150(k), no change to exhaust to exhaust system. no structural work.Details
unit #7-change kitchen cabinets, countertop, like for like plumbing, elect. fixture upgrade, (n) lighting per cec 150(k), no change to exhaust to exhaust system. no structural work. | $10,800 |
| Jul 11, 2008 | Expired or cancelled expired Feb 2010 | 1651 Larkin St | kitchen & bath remodel, no structural work (one kitchen and one bath) #8Details
kitchen & bath remodel, no structural work (one kitchen and one bath) #8 | $16,000 | |
| May 9, 2008 | Expired or cancelled expired Feb 2010 | 1651 Larkin St | work on unit#4. kitchen and bath remodel. no structural work. (1 kitchen & 1 bath).Details
work on unit#4. kitchen and bath remodel. no structural work. (1 kitchen & 1 bath). | $16,000 | |
| May 21, 2007 | Never finaled issued May 2007, no final | 1651 Larkin St | street space permit | ||
| Apr 3, 2000 | Expired or cancelled expired Oct 2001 | 1651 Larkin St | Pro General Roofing Inc | reroofing | $7,950 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kells Construction Inc. (3), Image Construction (2), Make Ready Maintenance Inc (2), Yellow Zone Construction (2), Byington Electric Corp, Fire Guard Protection Inc., Mountain Bay Construction, Pro General Roofing Inc
- Engineers
- Ronald Yu
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.