Yan Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2023 to Nov 2024
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 39 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2024 | Completed final sign-off Jan 2025 | 547 23rd Av | to comply with nov: 202429163 fix/repair sheetrock approc 3x3, paint/ remove mildew, paint. replace floor covering approx 5x20 (staircase) clear dreinage/ exterior deck. re install smoke c02 detectorsDetails
to comply with nov: 202429163 fix/repair sheetrock approc 3x3, paint/ remove mildew, paint. replace floor covering approx 5x20 (staircase) clear dreinage/ exterior deck. re install smoke c02 detectors | $500 |