Back to kitchen remodel contractors
Yan Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2023 to Nov 2024
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2023 | Never finaled issued Mar 2023, no final | 547 23rd Av | to comply with: 201904731: 202200331:202301572: patch water leaks on decks/ roof: patch sheetrock cracks: seal pipe openings in garage, kitchen, exterior walls.Details
to comply with: 201904731: 202200331:202301572: patch water leaks on decks/ roof: patch sheetrock cracks: seal pipe openings in garage, kitchen, exterior walls. | $1,000 |