Back to bathroom remodel contractors
Y&W Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Aug 2022
- Last 24 months
- 0 permits filed
42 permits since 2000: 33 completed, 1 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 18 completed, 3 never finaled. Typically 0 days from filing to permit and 56 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2017 | Never finaled issued Sep 2019, no final | 1565 Plymouth Av | unit legalization ordinance 43-14. legalize existing kitchen, one bed rm & one bath room. all work at ground floor.Details
unit legalization ordinance 43-14. legalize existing kitchen, one bed rm & one bath room. all work at ground floor. | $20,000 |
| Feb 5, 2016 | Completed final sign-off Apr 2016 | 1391 08th Av | unit 16,remodel kitchen replace cabinets, counter tops, stove,hood, sink faucet, refrigirator, remodel bathroom replace tile in tub, faucet, sink & toilet, no structural workDetails
unit 16,remodel kitchen replace cabinets, counter tops, stove,hood, sink faucet, refrigirator, remodel bathroom replace tile in tub, faucet, sink & toilet, no structural work | $20,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2016 | 1391 08th Av | unit #8: remodel kitchen and bathroom. replace cabinets, install dishwasher, stove hood, sink faucet, replace tub, faucet, vanity and toilet.Details
unit #8: remodel kitchen and bathroom. replace cabinets, install dishwasher, stove hood, sink faucet, replace tub, faucet, vanity and toilet. | $25,000 |
| May 4, 2015 | Completed final sign-off Jun 2015 | 1250 Taylor St | apt. # 3: remodel kitchen: replace cabinets sink. stove counter top hood connect to (e) duct. (floor size 8'x8') - install new dishwasher. remodel bathroom: replace new tub, sink, toilet. floor size - (5'x7'.6")Details
apt. # 3: remodel kitchen: replace cabinets sink. stove counter top hood connect to (e) duct. (floor size 8'x8') - install new dishwasher. remodel bathroom: replace new tub, sink, toilet. floor size - (5'x7'.6") | $20,000 |
| Mar 30, 2015 | Completed final sign-off Dec 2015 | 1250 Taylor St | unit #5: remodel kitchen: replace cabinets, sink stove-counter top hood-connect to (e) duct. install new dish washer, remodel bathroom: replace bath tub, sink toilet.Details
unit #5: remodel kitchen: replace cabinets, sink stove-counter top hood-connect to (e) duct. install new dish washer, remodel bathroom: replace bath tub, sink toilet. | $20,000 |
| Feb 2, 2015 | Completed final sign-off Dec 2015 | 1250 Taylor St | # 7: kitchen: replace cabinets, stove, counter top, hood, floor light, outlet. install new dishwasher. bathroom: replace bath tub, faucet, vanity, toilet, light, gfi.Details
# 7: kitchen: replace cabinets, stove, counter top, hood, floor light, outlet. install new dishwasher. bathroom: replace bath tub, faucet, vanity, toilet, light, gfi. | $20,000 |
| Dec 13, 2013 | Completed final sign-off Feb 2014 | 1618 Polk St | unit #11: remodel kitchen: install new cabinet & disposal, dishqsher, hood new outlets, new light counter for new sink, new faucet. new floor tile. remodel bathroom: install new tub, new faucet for shower. new vanity and top and faucet. new fan, new toilet, new light and gfi outlet.Details
unit #11: remodel kitchen: install new cabinet & disposal, dishqsher, hood new outlets, new light counter for new sink, new faucet. new floor tile. remodel bathroom: install new tub, new faucet for shower. new vanity and top and faucet. new fan, new toilet, new light and gfi outlet. | $20,000 |
| Aug 5, 2011 | Completed final sign-off Oct 2011 | 27 Isis St | remodel kitchen, bathroom. kitchen: replace cabinets, counter top, sink, faucet, disposal, dishwasher, 10'x10' area. bathroom: replace shower pan, tile, sink, faucet, toilet, 5'x8' area.Details
remodel kitchen, bathroom. kitchen: replace cabinets, counter top, sink, faucet, disposal, dishwasher, 10'x10' area. bathroom: replace shower pan, tile, sink, faucet, toilet, 5'x8' area. | $8,800 |
| Nov 21, 2008 | Completed final sign-off Jan 2009 | 615 Monterey Bl | unit #3: replace cabinets in kitchen and replace counter top, faucet, sink, stove, dishwasher, disposal. replace floor with tile. replace tile, toilet, vanity bath tub in bathroom. (one bathroom) non structural.Details
unit #3: replace cabinets in kitchen and replace counter top, faucet, sink, stove, dishwasher, disposal. replace floor with tile. replace tile, toilet, vanity bath tub in bathroom. (one bathroom) non structural. | $12,800 |
| Jul 11, 2008 | Completed final sign-off Aug 2008 | 1900 Vallejo St | work @ unit# 103 only. replace cabinet, stove, dishwasher, disposal in kitchen. replace tile, vanity, toilet, medicine, cabinet, faucet in bathroom.Details
work @ unit# 103 only. replace cabinet, stove, dishwasher, disposal in kitchen. replace tile, vanity, toilet, medicine, cabinet, faucet in bathroom. | $18,000 |
| Jun 2, 2008 | Completed final sign-off Jul 2008 | 1900 Vallejo St | work @ unit# 504 only. replace cabinet in kitchen. install dish washer disposal & stove. replace tile in bathroom & faucet. medicine cabinet vanity.Details
work @ unit# 504 only. replace cabinet in kitchen. install dish washer disposal & stove. replace tile in bathroom & faucet. medicine cabinet vanity. | $20,000 |
| Mar 21, 2008 | Completed final sign-off Apr 2008 | 2199 Turk Bl | unit 7 - replace window in bedroom; bathtub, vanity, toilet, faucet in bathroom; kitchen cabinets, countertop, sink disposal, stove, floor in kitchen with tile cement board; window in bathroom.Details
unit 7 - replace window in bedroom; bathtub, vanity, toilet, faucet in bathroom; kitchen cabinets, countertop, sink disposal, stove, floor in kitchen with tile cement board; window in bathroom. | $12,000 |
| Dec 27, 2007 | Completed final sign-off Mar 2008 | 724 Clement St | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $14,500 |
| Dec 5, 2007 | Completed final sign-off Jan 2008 | 2199 Turk Bl | work on unit#6. replace tile in bathroom shower. bath tub, toilet, vanity, bath tub faucet. replace window in bathroom, and in bedroom (at rear). replace cabinets in kitchen and countertop, faucet disposal, sink, stove (6 feet counter top and cabinet) to comply with his nov#200718454.Details
work on unit#6. replace tile in bathroom shower. bath tub, toilet, vanity, bath tub faucet. replace window in bathroom, and in bedroom (at rear). replace cabinets in kitchen and countertop, faucet disposal, sink, stove (6 feet counter top and cabinet) to comply with his nov#200718454. | $14,500 |
| Nov 6, 2007 | Never finaled issued Nov 2007, no final | 2199 Turk Bl | comply w/his nov#200718454 date 8/27/07: work on unit#6 only. repair window in bedroom. repair smoke detector in living rm and bedrm. unclog kitchen sink. repair tub faucet and shower head. remove mildewin bedrm closet. repair damage ceiling + wall in bedrm. repair damage tile around bath tub.Details
comply w/his nov#200718454 date 8/27/07: work on unit#6 only. repair window in bedroom. repair smoke detector in living rm and bedrm. unclog kitchen sink. repair tub faucet and shower head. remove mildewin bedrm closet. repair damage ceiling + wall in bedrm. repair damage tile around bath tub. | $3,000 |
| Sep 20, 2007 | Never finaled issued Sep 2007, no final | 1560 Mcallister St | work on unit#5,#6. replace cabinets in kitchen. replace sink stove hood floor with ceramic tile. counter top with granite. 50% wattage of kitchen. lighting to be fluorescent. replace toilet vanity floor . light faucet in bathroom. replace faucet in shower. bathroom lighting to be fluorescant or onDetails
work on unit#5,#6. replace cabinets in kitchen. replace sink stove hood floor with ceramic tile. counter top with granite. 50% wattage of kitchen. lighting to be fluorescent. replace toilet vanity floor . light faucet in bathroom. replace faucet in shower. bathroom lighting to be fluorescant or on | $16,000 |
| Apr 12, 2007 | Completed final sign-off May 2007 | 615 Monterey Bl | work @ unit# 2 only. replace bathtub. vanity toilet, fault & tile in bathroom. replace cabinet. dish washer. disposal. stove & sink. tile floor in kitchen. no lighting change.Details
work @ unit# 2 only. replace bathtub. vanity toilet, fault & tile in bathroom. replace cabinet. dish washer. disposal. stove & sink. tile floor in kitchen. no lighting change. | $13,000 |
| Feb 7, 2007 | Completed final sign-off Feb 2007 | 37 States St | remodel bathroom, replace bath tub fauce, vanity, replace dry rot wood on floor, replace tile on wall and floor. replace tile on wall and floor. unit #3Details
remodel bathroom, replace bath tub fauce, vanity, replace dry rot wood on floor, replace tile on wall and floor. replace tile on wall and floor. unit #3 | $5,000 |
| Dec 5, 2006 | Completed final sign-off Jan 2007 | 263 18th Av | replace cabinets and countertops in kitchen, same size. replace 1 bath tub and faucet. tile in bathroomDetails
replace cabinets and countertops in kitchen, same size. replace 1 bath tub and faucet. tile in bathroom | $12,800 |
| Nov 21, 2005 | Completed final sign-off Jun 2006 | 899 Green St | remodel bathroom-replace bathtub w/shower; ceiling w/sheetrock, replace walls w/sheetrock; replace toilet vanity; replace light fixture w/recessed light, replace floor with tile, replace tile w/showerDetails
remodel bathroom-replace bathtub w/shower; ceiling w/sheetrock, replace walls w/sheetrock; replace toilet vanity; replace light fixture w/recessed light, replace floor with tile, replace tile w/shower | $3,000 |
| Jun 13, 2001 | Completed final sign-off Jun 2001 | 2222 42nd Av | replace floor w/ tile in the bathroom,2nd fl. replace floow w/ tile in the kitchen,2nd flr.Details
replace floor w/ tile in the bathroom,2nd fl. replace floow w/ tile in the kitchen,2nd flr. | $2,000 |