Permit GraphShortlistSan Francisco building permits since 2000

Block 0213, lot 020

1250 Taylor St

City’s use
Multi-Family Residential
Built
1912
Stories
4
Units
17
Rooms
17 bathrooms
Building
12,265 sq ft
Lot
2,996 sq ft
Zoning
RM3
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

29 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 10, 2023Completed
final sign-off Aug 2023
1250 Taylor StS C General Constructionapt 16: remodel fixing sheetrock on walls and ceiling .install new floors. remodel bathroom: change angle stops, shower drain,install new toilet, vanity. replc the ceiling lights,change all receptacles and switches. install new cabinets in the kitchen countertops,add new laundry box into (e) closet
Details
Permit
202305107501
Permit issued
May 10, 2023
Final sign-off
Aug 16, 2023

apt 16: remodel fixing sheetrock on walls and ceiling .install new floors. remodel bathroom: change angle stops, shower drain,install new toilet, vanity. replc the ceiling lights,change all receptacles and switches. install new cabinets in the kitchen countertops,add new laundry box into (e) closet

Open the permit page

$35,000
Jan 11, 2021Never finaled
issued Jan 2021, no final
1250 Taylor StM Rivera Construction Inc.unit #8: replace linolium in bathroom.
Details
Permit
202101112435
Permit issued
Jan 11, 2021

unit #8: replace linolium in bathroom.

Open the permit page

$800
Jul 20, 2020Never finaled
issued Jul 2020, no final
1250 Taylor Ststreet space
Details
Permit
M1216933
Permit issued
Jul 22, 2020

street space

Open the permit page

May 14, 2020Never finaled
issued May 2020, no final
1250 Taylor Ststreet space
Details
Permit
M1206187
Permit issued
May 18, 2020

street space

Open the permit page

Mar 2, 2020Completed
final sign-off Aug 2021
1250 Taylor StBay Alarm Companynew fa system and installing low frequency sounders to an existing building. two new adu units under permit #2018-12-20-8920. sprinklers installed in new adu's in basement permit #2019-07-11-5612
Details
Permit
202003025821
Permit issued
Mar 2, 2020
Final sign-off
Aug 4, 2021

new fa system and installing low frequency sounders to an existing building. two new adu units under permit #2018-12-20-8920. sprinklers installed in new adu's in basement permit #2019-07-11-5612

Open the permit page

$38,270
Feb 24, 2020Never finaled
issued Feb 2020, no final
1250 Taylor Ststreet space
Details
Permit
M1198287
Permit issued
Feb 24, 2020

street space

Open the permit page

Dec 20, 2019Never finaled
issued Dec 2019, no final
1250 Taylor Ststreet space
Details
Permit
M1177751
Permit issued
Dec 20, 2019

street space

Open the permit page

Dec 11, 2019Completed
final sign-off Aug 2021
1250 Taylor StS L M Development Inc.revision to approved adu permit #201812208920. horizontal addition-interior lightwell infill at 2 bedrooms-86 sf. maher n/a.
Details
Permit
201912119210
Permit issued
Oct 8, 2020
Final sign-off
Aug 25, 2021

revision to approved adu permit #201812208920. horizontal addition-interior lightwell infill at 2 bedrooms-86 sf. maher n/a.

Open the permit page

$10,000
Nov 18, 2019Completed
final sign-off Aug 2021
1250 Taylor StS L M Development Inc.revision to app#201812208920. strengthening of extg interior concrete retaining wall. add new shear wall and strong walls.
Details
Permit
201911187539
Permit issued
Nov 20, 2019
Final sign-off
Aug 20, 2021

revision to app#201812208920. strengthening of extg interior concrete retaining wall. add new shear wall and strong walls.

Open the permit page

$30,000
Nov 5, 2019Completed
final sign-off Jul 2020
1250 Taylor Stunit #15: new kitchen,renovate bathm relocate bedroom, no structural, no exterior
Details
Permit
201911056514
Permit issued
Dec 4, 2019
Final sign-off
Jul 7, 2020

unit #15: new kitchen,renovate bathm relocate bedroom, no structural, no exterior

Open the permit page

$25,000
Oct 23, 2019Never finaled
issued Oct 2019, no final
1250 Taylor Ststreet space
Details
Permit
M1157327
Permit issued
Oct 23, 2019

street space

Open the permit page

Aug 23, 2019Never finaled
issued Aug 2019, no final
1250 Taylor Ststreet space
Details
Permit
M1128047
Permit issued
Aug 23, 2019

street space

Open the permit page

Jul 11, 2019Completed
final sign-off Aug 2021
1250 Taylor StA M West Mechanical Inc.install new fire sprinkler system for new adu units on the basement. install service line for new fire sprinkler system from curb to bld with 2" underground copper pipe
Details
Permit
201907115612
Permit issued
Jul 25, 2019
Final sign-off
Aug 25, 2021

install new fire sprinkler system for new adu units on the basement. install service line for new fire sprinkler system from curb to bld with 2" underground copper pipe

Open the permit page

$15,000
Jun 18, 2019Never finaled
issued Jun 2019, no final
1250 Taylor Ststreet space
Details
Permit
M1096948
Permit issued
Jun 18, 2019

street space

Open the permit page

Dec 20, 2018Completed
final sign-off Aug 2021
1250 Taylor StS L M Development Inc.(2) adu's @ basement per ord# 162-16. soft story under separate pa# 2016-0412-4608.
Details
Permit
201812208920
Permit issued
Jun 13, 2019
Final sign-off
Aug 25, 2021

(2) adu's @ basement per ord# 162-16. soft story under separate pa# 2016-0412-4608.

Open the permit page

$100,000
Jun 23, 2017Never finaled
issued Jun 2017, no final
1250 Taylor Ststreet space permit
Details
Permit
M801167
Permit issued
Jun 23, 2017

street space permit

Open the permit page

Jun 8, 2017Completed
final sign-off Aug 2017
1250 Taylor StMetro General Constructionunit #2 - to comply with nov 201776901, #2 & #3, rot repair, about 25%. replace cabinets, kitchen & bath; gfi installed in kitchen & bath; plumbing new sinks in kitchen & bath
Details
Permit
201706088779
Permit issued
Jun 8, 2017
Final sign-off
Aug 2, 2017

unit #2 - to comply with nov 201776901, #2 & #3, rot repair, about 25%. replace cabinets, kitchen & bath; gfi installed in kitchen & bath; plumbing new sinks in kitchen & bath

Open the permit page

$15,000
May 17, 2017Never finaled
issued May 2017, no final
1250 Taylor Ststreet space
Details
Permit
M786787
Permit issued
May 17, 2017

street space

Open the permit page

May 10, 2017Completed
final sign-off Sep 2017
1250 Taylor StU S Prime Contractor Incdetail change to pa#2016-0412-4608 for back shear walls.
Details
Permit
201705106207
Permit issued
May 10, 2017
Final sign-off
Sep 12, 2017

detail change to pa#2016-0412-4608 for back shear walls.

Open the permit page

Apr 14, 2017Never finaled
issued Apr 2017, no final
1250 Taylor Ststreetspace
Details
Permit
M778267
Permit issued
Apr 14, 2017

streetspace

Open the permit page

Apr 12, 2016Completed
final sign-off Sep 2017
1250 Taylor StU S Prime Contractor Incsoft story seismic retrofit per sfbc 2013 ord. 66-13, chapter 34b, 2012 iebc appendix a-4. maher na
Details
Permit
201604124608
Permit issued
May 19, 2016
Final sign-off
Sep 11, 2017

soft story seismic retrofit per sfbc 2013 ord. 66-13, chapter 34b, 2012 iebc appendix a-4. maher na

Open the permit page

$70,000
Jul 8, 2015Never finaled
issued Jul 2015, no final
1250 Taylor Ststreet space
Details
Permit
M601207
Permit issued
Jul 8, 2015

street space

Open the permit page

May 4, 2015Completed
final sign-off Jun 2015
1250 Taylor StY&W Construction Co.apt. # 3: remodel kitchen: replace cabinets sink. stove counter top hood connect to (e) duct. (floor size 8'x8') - install new dishwasher. remodel bathroom: replace new tub, sink, toilet. floor size - (5'x7'.6")
Details
Permit
201505045224
Permit issued
May 4, 2015
Final sign-off
Jun 26, 2015

apt. # 3: remodel kitchen: replace cabinets sink. stove counter top hood connect to (e) duct. (floor size 8'x8') - install new dishwasher. remodel bathroom: replace new tub, sink, toilet. floor size - (5'x7'.6")

Open the permit page

$20,000
Mar 30, 2015Completed
final sign-off Dec 2015
1250 Taylor StY&W Construction Co.unit #5: remodel kitchen: replace cabinets, sink stove-counter top hood-connect to (e) duct. install new dish washer, remodel bathroom: replace bath tub, sink toilet.
Details
Permit
201503302173
Permit issued
Mar 30, 2015
Final sign-off
Dec 29, 2015

unit #5: remodel kitchen: replace cabinets, sink stove-counter top hood-connect to (e) duct. install new dish washer, remodel bathroom: replace bath tub, sink toilet.

Open the permit page

$20,000
Feb 2, 2015Completed
final sign-off Dec 2015
1250 Taylor StY&W Construction Co.# 7: kitchen: replace cabinets, stove, counter top, hood, floor light, outlet. install new dishwasher. bathroom: replace bath tub, faucet, vanity, toilet, light, gfi.
Details
Permit
201502027176
Permit issued
Feb 2, 2015
Final sign-off
Dec 29, 2015

# 7: kitchen: replace cabinets, stove, counter top, hood, floor light, outlet. install new dishwasher. bathroom: replace bath tub, faucet, vanity, toilet, light, gfi.

Open the permit page

$20,000
Apr 30, 2012Never finaled
issued Apr 2012, no final
1250 Taylor Ststreet space permit
Details
Permit
M317928
Permit issued
Apr 30, 2012

street space permit

Open the permit page

Sep 18, 2009Never finaled
issued Sep 2009, no final
1250 Taylor Ststreet space permit.
Details
Permit
M180235
Permit issued
Sep 18, 2009

street space permit.

Open the permit page

Oct 3, 2006Expired or cancelled
expired Feb 2009
1250 Taylor StAaa Restaurant Fire Control/Dba Aaa Fireinstall only 1 sprinkler head in trash area.
Details
Permit
200610034036
Permit issued
Oct 3, 2006

install only 1 sprinkler head in trash area.

Open the permit page

$2,000
Jul 20, 2004Never finaled
issued Jul 2004, no final
1250 Taylor Ststreet space
Details
Permit
M28399
Permit issued
Jul 20, 2004

street space

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
S L M Development Inc. (3), Y&W Construction Co. (3), U S Prime Contractor Inc (2), A M West Mechanical Inc., Aaa Restaurant Fire Control/Dba Aaa Fire, Bay Alarm Company, M Rivera Construction Inc., Metro General Construction, S C General Construction
Architects
Daniel Paris (3)
Engineers
Ali Afrasiabi, Behruz Vahdani-Sanavi, Ph.D.,P.E
Designers
Behruz Vahdani-Sanavi, Ph.D.,P.E

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.