S C General Construction
- Based in
- San Rafael
- On San Francisco permits
- Jul 2021 to Jun 2026
- Last 24 months
- 3 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2026 | In progress issued Jun 2026 | 621 25th Av | bathroom remodel in kind, updates to plumbing as needed. no electrical work to be completed. no change to floor layout. no change to wall layout. no structural work. no change to fixture layout.Details
bathroom remodel in kind, updates to plumbing as needed. no electrical work to be completed. no change to floor layout. no change to wall layout. no structural work. no change to fixture layout. | $15,000 |
| Apr 16, 2025 | Completed final sign-off Aug 2025 | 12 Tillman Pl | prop h: tenant improvement at existing commercial unit for new cafe-restaurant (change of use). new finishes and equipment. no structural work. new mechanical-plumbing and electrical work under separate permit.Details
prop h: tenant improvement at existing commercial unit for new cafe-restaurant (change of use). new finishes and equipment. no structural work. new mechanical-plumbing and electrical work under separate permit. | $90,000 |
| Oct 31, 2024 | Completed final sign-off Jan 2025 | 2299 Chestnut St | 2295 chestnut street: removal of tile at front beneath windows to repair dryrot & reinstalling of tile. 250sf stucco repair. put new paper water proofing and stucco wire. scratch code and brown.Details
2295 chestnut street: removal of tile at front beneath windows to repair dryrot & reinstalling of tile. 250sf stucco repair. put new paper water proofing and stucco wire. scratch code and brown. | $1,700 |
| Apr 23, 2024 | Completed final sign-off Jun 2024 | 80 07th Av | replacing the kitchen cabinets and, replace shower valve in the bathroom, put tile on the wall, install an exhaust fan, install a new vanity, change some outlets and the angle valvesDetails
replacing the kitchen cabinets and, replace shower valve in the bathroom, put tile on the wall, install an exhaust fan, install a new vanity, change some outlets and the angle valves | $22,500 |
| Feb 9, 2024 | Completed final sign-off Mar 2024 | 522 07th Av | parial bathroom remodel. shower valve, replace ceiling fan toilet vanity floor shower panDetails
parial bathroom remodel. shower valve, replace ceiling fan toilet vanity floor shower pan | $4,650 |
| May 10, 2023 | Completed final sign-off Aug 2023 | 1250 Taylor St | apt 16: remodel fixing sheetrock on walls and ceiling .install new floors. remodel bathroom: change angle stops, shower drain,install new toilet, vanity. replc the ceiling lights,change all receptacles and switches. install new cabinets in the kitchen countertops,add new laundry box into (e) closetDetails
apt 16: remodel fixing sheetrock on walls and ceiling .install new floors. remodel bathroom: change angle stops, shower drain,install new toilet, vanity. replc the ceiling lights,change all receptacles and switches. install new cabinets in the kitchen countertops,add new laundry box into (e) closet | $35,000 |
| Jul 29, 2021 | Completed final sign-off Jan 2023 | 1325 31st Av | remove non-loaded bearing wall between kitchen and dining room on upper floor. replace kitchen cabinets and countertop.Details
remove non-loaded bearing wall between kitchen and dining room on upper floor. replace kitchen cabinets and countertop. | $10,000 |