Back to kitchen remodel contractors
Xmag Construction
- Based in
- Novato
- On San Francisco permits
- Apr 2019 to Jul 2026
- Last 24 months
- 3 permits filed
6 permits since 2000: 2 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2022 | Completed final sign-off Jul 2022 | 521 Texas St | one kitchen and bath remodel. retile master bath. all fixtures to be replaced in same location. 2 switches, 3 receptacles, shower head and faucet. replace kitchen cabs/countertop. all fixtures to remain in same location. replace all fixtures. 2 swtiches, 6 receptacles faucet/sink.Details
one kitchen and bath remodel. retile master bath. all fixtures to be replaced in same location. 2 switches, 3 receptacles, shower head and faucet. replace kitchen cabs/countertop. all fixtures to remain in same location. replace all fixtures. 2 swtiches, 6 receptacles faucet/sink. | $18,000 |