Back to bathroom remodel contractors
Xmag Construction
- Based in
- Novato
- On San Francisco permits
- Apr 2019 to Jul 2026
- Last 24 months
- 3 permits filed
6 permits since 2000: 2 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 in progress. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Jul 2026 | 776 Green St | remodel in-kind (e) hall bath & powder room. replace shut off valves, replace light fixtures in same location; install gfci.Details
remodel in-kind (e) hall bath & powder room. replace shut off valves, replace light fixtures in same location; install gfci. | $28,000 |
| May 5, 2026 | In progress issued May 2026 | 451 Lombard St | two bathrooms remodel, retile bath, replace gfci, replace shower valves, to comply with inspection report cc 8761, electrical and plumbing updates as needed.Details
two bathrooms remodel, retile bath, replace gfci, replace shower valves, to comply with inspection report cc 8761, electrical and plumbing updates as needed. | $37,500 |
| Apr 27, 2022 | Completed final sign-off Jul 2022 | 521 Texas St | one kitchen and bath remodel. retile master bath. all fixtures to be replaced in same location. 2 switches, 3 receptacles, shower head and faucet. replace kitchen cabs/countertop. all fixtures to remain in same location. replace all fixtures. 2 swtiches, 6 receptacles faucet/sink.Details
one kitchen and bath remodel. retile master bath. all fixtures to be replaced in same location. 2 switches, 3 receptacles, shower head and faucet. replace kitchen cabs/countertop. all fixtures to remain in same location. replace all fixtures. 2 swtiches, 6 receptacles faucet/sink. | $18,000 |
| Apr 17, 2019 | Completed final sign-off Oct 2019 | 890 35th Av | frame new non load bearing partition walls to create hallway to back bedroom. relocate (e) non bearing partition walls to reconfigure hall bath and create master bath and linen closetDetails
frame new non load bearing partition walls to create hallway to back bedroom. relocate (e) non bearing partition walls to reconfigure hall bath and create master bath and linen closet | $80,000 |