Back to kitchen remodel contractors
Xinh Hua Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2004 to Jun 2015
- Last 24 months
- 0 permits filed
28 permits since 2000: 27 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2015 | Completed final sign-off Jun 2016 | 573 Banks St | rear bldg: remove wall, add skylight and kitchen and bath remodel on 2nd fl per planDetails
rear bldg: remove wall, add skylight and kitchen and bath remodel on 2nd fl per plan | $35,000 |
| Nov 12, 2013 | Completed final sign-off Aug 2014 | 111 States St | add rooms down with one office, one family room, laundry, bath. add powder room and remodel bath and kitchen at upper floor.Details
add rooms down with one office, one family room, laundry, bath. add powder room and remodel bath and kitchen at upper floor. | $100,000 |
| Oct 11, 2013 | Completed final sign-off Aug 2014 | 282 Eureka St | replace front stairs, remodel main level kitchen and stair to lower level, remodel lower level storage area/laundry, to new mudroom, study room & powder room, associated electrical, lighting, interior finish work and minor structural work.Details
replace front stairs, remodel main level kitchen and stair to lower level, remodel lower level storage area/laundry, to new mudroom, study room & powder room, associated electrical, lighting, interior finish work and minor structural work. | $100,000 |
| Sep 13, 2012 | Completed final sign-off Dec 2012 | 384 Nevada St | replace all window in-kind on 2nd floor, kitchen & bathroom remodel, remove vinyl siding at front & refinish wood siding, replace fence at front yard, install insulation per plan.Details
replace all window in-kind on 2nd floor, kitchen & bathroom remodel, remove vinyl siding at front & refinish wood siding, replace fence at front yard, install insulation per plan. | $20,000 |
| Dec 16, 2008 | Completed final sign-off May 2009 | 808 Paris St | relocate (e) kitchen, remodel (e) bathroom, add 1 new bathrm, 1 new bedroom, all work at 2nd flrDetails
relocate (e) kitchen, remodel (e) bathroom, add 1 new bathrm, 1 new bedroom, all work at 2nd flr | $35,000 |
| Jul 1, 2008 | Completed final sign-off Sep 2008 | 1749 Polk St | work @ unit# 6 only. kitchen cabinet replacement & bathroom tile replacement. painting & floor refinished. light fixture replacement & under sink plumbing.Details
work @ unit# 6 only. kitchen cabinet replacement & bathroom tile replacement. painting & floor refinished. light fixture replacement & under sink plumbing. | $12,000 |
| Jul 23, 2007 | Completed final sign-off Sep 2007 | 1681 Quint St | replace kitchen cabinets (12), new counters. no lighting.Details
replace kitchen cabinets (12), new counters. no lighting. | $5,000 |
| Jun 14, 2007 | Completed final sign-off Dec 2007 | 20 De Montfort Av | remodel kitchen & restroom on 2nd floor in same location.Details
remodel kitchen & restroom on 2nd floor in same location. | $10,000 |
| Nov 2, 2005 | Completed final sign-off Oct 2006 | 1487 Underwood Av | const. bedroom, family room & bathroom at ground floor. bedroom fill-in under (e) kitchen.Details
const. bedroom, family room & bathroom at ground floor. bedroom fill-in under (e) kitchen. | $32,000 |