Back to bathroom remodel contractors
Xinh Hua Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2004 to Jun 2015
- Last 24 months
- 0 permits filed
28 permits since 2000: 27 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 17 completed. Typically 0 days from filing to permit and 103 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2015 | Completed final sign-off Jun 2016 | 573 Banks St | rear bldg: remove wall, add skylight and kitchen and bath remodel on 2nd fl per planDetails
rear bldg: remove wall, add skylight and kitchen and bath remodel on 2nd fl per plan | $35,000 |
| Jul 24, 2014 | Completed final sign-off Oct 2014 | 110 Congo St | add one bath & remodel (e) bedroom on 2nd floor. remove unwarranted structure at rear.Details
add one bath & remodel (e) bedroom on 2nd floor. remove unwarranted structure at rear. | $15,000 |
| Nov 12, 2013 | Completed final sign-off Aug 2014 | 111 States St | add rooms down with one office, one family room, laundry, bath. add powder room and remodel bath and kitchen at upper floor.Details
add rooms down with one office, one family room, laundry, bath. add powder room and remodel bath and kitchen at upper floor. | $100,000 |
| Aug 21, 2013 | Completed final sign-off Oct 2013 | 567 27th St | two (2) bathroom remodel. replace light, put in new cabinet and fan. replace sink, bath tub, new tile, shower all in same place.Details
two (2) bathroom remodel. replace light, put in new cabinet and fan. replace sink, bath tub, new tile, shower all in same place. | $6,000 |
| Apr 17, 2013 | Completed final sign-off Aug 2013 | 530 Ellsworth St | remodel of existing basement for addition of new living space, including new master bedroom, new master bathroom, new powder room, connected to existing 1st floor living space by new visiually open connecting stair. relocate (e) laundry, furnace, and water heater.Details
remodel of existing basement for addition of new living space, including new master bedroom, new master bathroom, new powder room, connected to existing 1st floor living space by new visiually open connecting stair. relocate (e) laundry, furnace, and water heater. | $99,100 |
| Oct 16, 2012 | Completed final sign-off Feb 2013 | 300 Foote Av | add 1 bathroom, 1 new bedroom, 1 new den on ground floorDetails
add 1 bathroom, 1 new bedroom, 1 new den on ground floor | $25,000 |
| Sep 13, 2012 | Completed final sign-off Dec 2012 | 384 Nevada St | replace all window in-kind on 2nd floor, kitchen & bathroom remodel, remove vinyl siding at front & refinish wood siding, replace fence at front yard, install insulation per plan.Details
replace all window in-kind on 2nd floor, kitchen & bathroom remodel, remove vinyl siding at front & refinish wood siding, replace fence at front yard, install insulation per plan. | $20,000 |
| Dec 16, 2010 | Completed final sign-off Mar 2011 | 508 Silliman St | legalize (e) bedrooms, bathroom, storage room. all work at ground floor.Details
legalize (e) bedrooms, bathroom, storage room. all work at ground floor. | $35,000 |
| Aug 27, 2010 | Completed final sign-off Dec 2010 | 1958 24th Av | construct 2 new bedrooms, 1 full bath room on ground floor. replace (e) water heater, and furnaceDetails
construct 2 new bedrooms, 1 full bath room on ground floor. replace (e) water heater, and furnace | $20,000 |
| Aug 13, 2009 | Completed final sign-off Nov 2009 | 2595 25th Av | add new full bath rm and closet, and remodel (e) laundry area on first /garage floor. remove part of non bearing wall and add closets, relocate (e) toilet and eliminate one sink in (e) bathroom on 2nd floor.Details
add new full bath rm and closet, and remodel (e) laundry area on first /garage floor. remove part of non bearing wall and add closets, relocate (e) toilet and eliminate one sink in (e) bathroom on 2nd floor. | $20,000 |
| Dec 16, 2008 | Completed final sign-off May 2009 | 808 Paris St | relocate (e) kitchen, remodel (e) bathroom, add 1 new bathrm, 1 new bedroom, all work at 2nd flrDetails
relocate (e) kitchen, remodel (e) bathroom, add 1 new bathrm, 1 new bedroom, all work at 2nd flr | $35,000 |
| Jul 1, 2008 | Completed final sign-off Sep 2008 | 1749 Polk St | work @ unit# 6 only. kitchen cabinet replacement & bathroom tile replacement. painting & floor refinished. light fixture replacement & under sink plumbing.Details
work @ unit# 6 only. kitchen cabinet replacement & bathroom tile replacement. painting & floor refinished. light fixture replacement & under sink plumbing. | $12,000 |
| Dec 14, 2007 | Completed final sign-off Jun 2008 | 523 Felton St | two bedrooms, 1 full bathroom, storage room to be added @ ground floor.Details
two bedrooms, 1 full bathroom, storage room to be added @ ground floor. | $32,000 |
| Dec 15, 2006 | Completed final sign-off Jun 2007 | 1443 Underwood Av | 2 bedroom. full bath room and laundry area to be added at ground floorDetails
2 bedroom. full bath room and laundry area to be added at ground floor | $36,000 |
| Nov 2, 2006 | Completed final sign-off Feb 2007 | 437 Banks St | legalize existing one bedroom, one bathroom, study room and one storage room at g/fDetails
legalize existing one bedroom, one bathroom, study room and one storage room at g/f | $30,000 |
| Nov 2, 2005 | Completed final sign-off Oct 2006 | 1487 Underwood Av | const. bedroom, family room & bathroom at ground floor. bedroom fill-in under (e) kitchen.Details
const. bedroom, family room & bathroom at ground floor. bedroom fill-in under (e) kitchen. | $32,000 |
| Aug 24, 2005 | Completed final sign-off Dec 2005 | 5035 California St | bedroom, storage room, laundry room and 1/2 bathroom to be added at g/f and repair replace (e)Details
bedroom, storage room, laundry room and 1/2 bathroom to be added at g/f and repair replace (e) | $24,000 |