Back to kitchen remodel contractors
Wu's Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jan 2013
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2013 | Completed final sign-off Jun 2013 | 2265 Beach St | apt#9 remove old kitkchen cabinets & counter, install new cabinets & counterop upgrade electrical to code in kitchen only, change in wall plumbing frm meta to copper in this unit kitchen only.apt#3 change in wall plumbing from metal pipe to copper in this unit, only in kitchen ,move expose copperDetails
apt#9 remove old kitkchen cabinets & counter, install new cabinets & counterop upgrade electrical to code in kitchen only, change in wall plumbing frm meta to copper in this unit kitchen only.apt#3 change in wall plumbing from metal pipe to copper in this unit, only in kitchen ,move expose copper | $6,000 |
| Nov 6, 2012 | Completed final sign-off Jan 2013 | 118 Ney St | remove old kitchen cabinets and counters, install new cabinets & counters, upgrade kitchen electrical, change plumbing to fit new fixture faucet, change new kitchen window and light fixtures.Details
remove old kitchen cabinets and counters, install new cabinets & counters, upgrade kitchen electrical, change plumbing to fit new fixture faucet, change new kitchen window and light fixtures. | $8,000 |
| Jun 6, 2011 | Completed final sign-off Sep 2011 | 2110 Stockton St | remodel 2 kitchens including sheetrock, insulation of all enterior walls in kitchen, new counter & sink. new cabinets using existing electrical. will have electrician updage if necessary. walls will remain where they are and no windows or doors will be moved or altered. all work in 2 kitchens only.Details
remodel 2 kitchens including sheetrock, insulation of all enterior walls in kitchen, new counter & sink. new cabinets using existing electrical. will have electrician updage if necessary. walls will remain where they are and no windows or doors will be moved or altered. all work in 2 kitchens only. | $13,200 |
| Jan 21, 2009 | Completed final sign-off Jul 2009 | 350 Marietta Dr | remodel kitchen, change cabinets, add outlet, switch, change sink, sewer location, add lights in the kitchen. upgrade panel (electrical panel to 100 m) new circuit box.Details
remodel kitchen, change cabinets, add outlet, switch, change sink, sewer location, add lights in the kitchen. upgrade panel (electrical panel to 100 m) new circuit box. | $20,000 |
| Oct 20, 2008 | Completed final sign-off Feb 2009 | 1270 Geneva Av | remodel kitchen, change cabinets, change furnace, change hardipies siding at the rear wall. install insulation at the rear wall. sheetrock the rear wall. change windows, install 30 new outlets, kitchen sewer pipe, replace new stair steps at the back of house in kind only.Details
remodel kitchen, change cabinets, change furnace, change hardipies siding at the rear wall. install insulation at the rear wall. sheetrock the rear wall. change windows, install 30 new outlets, kitchen sewer pipe, replace new stair steps at the back of house in kind only. | $45,000 |
| Jun 4, 2008 | Completed final sign-off Jul 2008 | 180 Santa Rosa Av | remodel kitchen on upper level no change in wall layout all cabinets plumbing same location and no change in door and window openingsDetails
remodel kitchen on upper level no change in wall layout all cabinets plumbing same location and no change in door and window openings | $24,000 |
| Apr 2, 2002 | Completed final sign-off May 2002 | 744 Moultrie St | 2nd floor: remodel kitchen,install cabinets,sink,stove, rmdl bath: cabinets,toilet,bath no wall chanDetails
2nd floor: remodel kitchen,install cabinets,sink,stove, rmdl bath: cabinets,toilet,bath no wall chan | $5,800 |