Back to kitchen remodel contractors
Wth Construction Corp
- Based in
- Oakland
- On San Francisco permits
- Jan 2021 to Jul 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2021 | Completed final sign-off Apr 2022 | 3349 23rd St | revision to pa# 2021-0702-3710, relocate ada counter at kitchen bar, replace water heater, change new pizza oven type from electric to gas unit, relocate sinks in kitchen, install ice maker. no exterior work.Details
revision to pa# 2021-0702-3710, relocate ada counter at kitchen bar, replace water heater, change new pizza oven type from electric to gas unit, relocate sinks in kitchen, install ice maker. no exterior work. | |
| Jul 2, 2021 | Completed final sign-off Apr 2022 | 3349 23rd St | remodel bathroom for accessibility comliance. remodel kitchen area, reconfigure lighting, interior flushes. no changes to exterior, no work in basement, abe program under sep. permit.Details
remodel bathroom for accessibility comliance. remodel kitchen area, reconfigure lighting, interior flushes. no changes to exterior, no work in basement, abe program under sep. permit. | $75,000 |
| Jun 18, 2021 | Completed final sign-off Nov 2021 | 1479 17th Av | kitchen remodel with new electrical sub panel. 22 circuits alteredDetails
kitchen remodel with new electrical sub panel. 22 circuits altered | $23,000 |
| Apr 30, 2021 | Expired or cancelled expired Nov 2024 | 1479 17th Av | the scope of work involves adding an a.d.u within the unconditioned existing first floor as per ordinance no. 162-16 in. the unit will contain living-dining, kitchen, bath, and bedroom.Details
the scope of work involves adding an a.d.u within the unconditioned existing first floor as per ordinance no. 162-16 in. the unit will contain living-dining, kitchen, bath, and bedroom. | $80,000 |
| Jan 28, 2021 | Completed final sign-off May 2021 | 1479 17th Av | 1) kitchen remodel. no walls alteration. 2. subpanel upgrade 3. main panel shut off to be replacedDetails
1) kitchen remodel. no walls alteration. 2. subpanel upgrade 3. main panel shut off to be replaced | $20,000 |