Wth Construction Corp
- Based in
- Oakland
- On San Francisco permits
- Jan 2021 to Jul 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2022 | Expired or cancelled withdrawn Feb 2025 | 424 Irving St | change of use: vacant laundry mat to a new sandwich cafe shop t.i. no dine in, to go only. alteration to plumbing and electrical. layout provided in bldg plans. no exterior work.Details
change of use: vacant laundry mat to a new sandwich cafe shop t.i. no dine in, to go only. alteration to plumbing and electrical. layout provided in bldg plans. no exterior work. | $80,000 |
| Oct 26, 2021 | Completed final sign-off Apr 2022 | 3349 23rd St | revision to pa# 2021-0702-3710, relocate ada counter at kitchen bar, replace water heater, change new pizza oven type from electric to gas unit, relocate sinks in kitchen, install ice maker. no exterior work.Details
revision to pa# 2021-0702-3710, relocate ada counter at kitchen bar, replace water heater, change new pizza oven type from electric to gas unit, relocate sinks in kitchen, install ice maker. no exterior work. | |
| Jul 2, 2021 | Completed final sign-off Apr 2022 | 3349 23rd St | accessible business entrance program per oridinance 51-16. install new outward swinging 36x85 door with int/ext power door actuators. install new power door operator with interior and exterior activators..Details
accessible business entrance program per oridinance 51-16. install new outward swinging 36x85 door with int/ext power door actuators. install new power door operator with interior and exterior activators.. | $7,000 |
| Jul 2, 2021 | Completed final sign-off Apr 2022 | 3349 23rd St | remodel bathroom for accessibility comliance. remodel kitchen area, reconfigure lighting, interior flushes. no changes to exterior, no work in basement, abe program under sep. permit.Details
remodel bathroom for accessibility comliance. remodel kitchen area, reconfigure lighting, interior flushes. no changes to exterior, no work in basement, abe program under sep. permit. | $75,000 |
| Jun 18, 2021 | Completed final sign-off Nov 2021 | 1479 17th Av | kitchen remodel with new electrical sub panel. 22 circuits alteredDetails
kitchen remodel with new electrical sub panel. 22 circuits altered | $23,000 |
| May 6, 2021 | Completed final sign-off May 2021 | 1481 17th Av | admin permit to pa 202101283491 to correct address from 1481 17th ave to 1479 17th avenue.Details
admin permit to pa 202101283491 to correct address from 1481 17th ave to 1479 17th avenue. | |
| Apr 30, 2021 | Expired or cancelled expired Nov 2024 | 1479 17th Av | the scope of work involves adding an a.d.u within the unconditioned existing first floor as per ordinance no. 162-16 in. the unit will contain living-dining, kitchen, bath, and bedroom.Details
the scope of work involves adding an a.d.u within the unconditioned existing first floor as per ordinance no. 162-16 in. the unit will contain living-dining, kitchen, bath, and bedroom. | $80,000 |
| Jan 28, 2021 | Completed final sign-off May 2021 | 1479 17th Av | 1) kitchen remodel. no walls alteration. 2. subpanel upgrade 3. main panel shut off to be replacedDetails
1) kitchen remodel. no walls alteration. 2. subpanel upgrade 3. main panel shut off to be replaced | $20,000 |