Back to kitchen remodel contractors
Wong Ho Yu/Ho's Electric Co
- Based in
- Oakland
- On San Francisco permits
- Oct 2003 to Nov 2014
- Last 24 months
- 0 permits filed
27 permits since 2000: 26 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 never finaled. Typically 1 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2014 | Completed final sign-off Jun 2015 | 2430 36th Av | remodel (e) kitchen (replace couner cabinets, flooring & install new lightings at 2nd flr, construct new wall, door between (e) family rm & (e) laundry area at grnd flr.Details
remodel (e) kitchen (replace couner cabinets, flooring & install new lightings at 2nd flr, construct new wall, door between (e) family rm & (e) laundry area at grnd flr. | $16,000 |
| Apr 3, 2014 | Completed final sign-off Jul 2014 | 45 Western Shore Ln | unit 1: kitchen and bathroom remodelling: replace bathroom sink, faucet, tub and tiles. replace kitchen cabinets, replace 6 outlets, 2 switches and 2 lights. no new walls and no existing wall relocation. lighting for kitchen & bathroom remodelling shall comply with cbc 150(k)8 & 150(k)10.Details
unit 1: kitchen and bathroom remodelling: replace bathroom sink, faucet, tub and tiles. replace kitchen cabinets, replace 6 outlets, 2 switches and 2 lights. no new walls and no existing wall relocation. lighting for kitchen & bathroom remodelling shall comply with cbc 150(k)8 & 150(k)10. | $8,000 |
| Jun 5, 2013 | Never finaled issued Jun 2013, no final | 560 Greenwich St | remodel kitchen, (n) bathroom, paint. on 2nd flr, no exterior work, relocate bathroom install 2 new closetsDetails
remodel kitchen, (n) bathroom, paint. on 2nd flr, no exterior work, relocate bathroom install 2 new closets | $20,000 |
| Nov 16, 2011 | Completed final sign-off May 2012 | 720 Spruce St | interior renovation of detached cottage. new bathrooms & kitchen. electrical & lighting. no work in existing basement (storage & furnace).Details
interior renovation of detached cottage. new bathrooms & kitchen. electrical & lighting. no work in existing basement (storage & furnace). | $30,000 |
| Dec 15, 2010 | Completed final sign-off Jan 2011 | 476 Waller St | revision to appl #201010143036: as built plan -change wall framing at kitchen. no change to lighting, no structural change.Details
revision to appl #201010143036: as built plan -change wall framing at kitchen. no change to lighting, no structural change. | |
| Nov 18, 2010 | Completed final sign-off Jan 2011 | 640 Balboa St | renovation of unit 640 of 3 unit residence. (2nd fl) relocate living rm, dining room, kitchen. remodel e bath. add 1/2 bath and 1 master bathDetails
renovation of unit 640 of 3 unit residence. (2nd fl) relocate living rm, dining room, kitchen. remodel e bath. add 1/2 bath and 1 master bath | $38,000 |
| Oct 14, 2010 | Completed final sign-off Jan 2011 | 476 Waller St | renovation to lower unit . relocate (e) kitchen, bathrm and laundry. convert (e) laundry to master bath. convert (e) bath to studyDetails
renovation to lower unit . relocate (e) kitchen, bathrm and laundry. convert (e) laundry to master bath. convert (e) bath to study | $50,000 |
| May 7, 2010 | Completed final sign-off Jun 2010 | 2701 Van Ness Av | 2nd floor: remodel kitchen. install new cabinet, new floor tile, countertop in kitchen.Details
2nd floor: remodel kitchen. install new cabinet, new floor tile, countertop in kitchen. | $7,000 |