Back to bathroom remodel contractors
Wong Ho Yu/Ho's Electric Co
- Based in
- Oakland
- On San Francisco permits
- Oct 2003 to Nov 2014
- Last 24 months
- 0 permits filed
27 permits since 2000: 26 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 never finaled. Typically 0 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2014 | Completed final sign-off Jul 2014 | 45 Western Shore Ln | unit 1: kitchen and bathroom remodelling: replace bathroom sink, faucet, tub and tiles. replace kitchen cabinets, replace 6 outlets, 2 switches and 2 lights. no new walls and no existing wall relocation. lighting for kitchen & bathroom remodelling shall comply with cbc 150(k)8 & 150(k)10.Details
unit 1: kitchen and bathroom remodelling: replace bathroom sink, faucet, tub and tiles. replace kitchen cabinets, replace 6 outlets, 2 switches and 2 lights. no new walls and no existing wall relocation. lighting for kitchen & bathroom remodelling shall comply with cbc 150(k)8 & 150(k)10. | $8,000 |
| Nov 12, 2013 | Completed final sign-off Nov 2013 | 2755 Franklin St | partial remodel one bathroom in unit 7: reuse toilet, vanity, and bath tub. new tile, replace window, not visible from street at existing opening. relocate light fixtures, bathroom lighting shall be high efficacy or controlled by manual on sensors.Details
partial remodel one bathroom in unit 7: reuse toilet, vanity, and bath tub. new tile, replace window, not visible from street at existing opening. relocate light fixtures, bathroom lighting shall be high efficacy or controlled by manual on sensors. | $5,000 |
| Jun 5, 2013 | Never finaled issued Jun 2013, no final | 560 Greenwich St | remodel kitchen, (n) bathroom, paint. on 2nd flr, no exterior work, relocate bathroom install 2 new closetsDetails
remodel kitchen, (n) bathroom, paint. on 2nd flr, no exterior work, relocate bathroom install 2 new closets | $20,000 |
| Nov 16, 2011 | Completed final sign-off May 2012 | 720 Spruce St | interior renovation of detached cottage. new bathrooms & kitchen. electrical & lighting. no work in existing basement (storage & furnace).Details
interior renovation of detached cottage. new bathrooms & kitchen. electrical & lighting. no work in existing basement (storage & furnace). | $30,000 |
| Feb 4, 2011 | Completed final sign-off Feb 2011 | 638 Balboa St | remodel 2 existing bathrooms, new tile, new plumbing and electrical fixturesDetails
remodel 2 existing bathrooms, new tile, new plumbing and electrical fixtures | $3,000 |
| Dec 15, 2010 | Completed final sign-off Jan 2011 | 640 Balboa St | revision to appl #201011185186: as built plan for location of closet & bedroom door, reconfiguration of half bath, no change to lighting or mep.Details
revision to appl #201011185186: as built plan for location of closet & bedroom door, reconfiguration of half bath, no change to lighting or mep. | |
| Nov 18, 2010 | Completed final sign-off Jan 2011 | 640 Balboa St | renovation of unit 640 of 3 unit residence. (2nd fl) relocate living rm, dining room, kitchen. remodel e bath. add 1/2 bath and 1 master bathDetails
renovation of unit 640 of 3 unit residence. (2nd fl) relocate living rm, dining room, kitchen. remodel e bath. add 1/2 bath and 1 master bath | $38,000 |
| Oct 14, 2010 | Completed final sign-off Jan 2011 | 476 Waller St | renovation to lower unit . relocate (e) kitchen, bathrm and laundry. convert (e) laundry to master bath. convert (e) bath to studyDetails
renovation to lower unit . relocate (e) kitchen, bathrm and laundry. convert (e) laundry to master bath. convert (e) bath to study | $50,000 |
| Jul 19, 2006 | Completed final sign-off Oct 2006 | 618 Paris St | remodel (e) bathroom & add new bathroom at 2nd floor.Details
remodel (e) bathroom & add new bathroom at 2nd floor. | $13,000 |
| Oct 2, 2003 | Completed final sign-off Dec 2003 | 2458 Fulton St | remodel (e0 bathroom and family room on the top flat. no structural workDetails
remodel (e0 bathroom and family room on the top flat. no structural work | $6,000 |