Back to kitchen remodel contractors
Wk Construction Inc
- Based in
- Albany
- On San Francisco permits
- Oct 2016 to May 2022
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 193 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 25, 2021 | Completed final sign-off Aug 2021 | 54 Stanyan St | unit #56: remodel kitchen, 1 full bathroom, powder room with new cabinets, fixtures & finish. add recessed led light fixtures throuthout. replace (e) windows not visible from street.Details
unit #56: remodel kitchen, 1 full bathroom, powder room with new cabinets, fixtures & finish. add recessed led light fixtures throuthout. replace (e) windows not visible from street. | $42,000 |
| Oct 27, 2020 | Completed final sign-off Jun 2021 | 78 Cotter St | remodel kitchen with new cabinets, counter tops, plumbing and lighting fixtures, and finishes.Details
remodel kitchen with new cabinets, counter tops, plumbing and lighting fixtures, and finishes. | $20,000 |
| Oct 7, 2020 | Completed final sign-off Dec 2020 | 2327 39th Av | remodel kitchen with new cabinets, counter tops and fixturesDetails
remodel kitchen with new cabinets, counter tops and fixtures | $13,000 |
| Dec 30, 2019 | Completed final sign-off Jan 2022 | 1829 Fulton St | kitchen and bathroom remodel on 2nd floor. add interior stair for connecting ground floor to 2nd floor. rooms down (one full bath)Details
kitchen and bathroom remodel on 2nd floor. add interior stair for connecting ground floor to 2nd floor. rooms down (one full bath) | $43,000 |
| Apr 17, 2018 | Completed final sign-off Oct 2018 | 20 San Antonio Pl | unit 2b: rehabilite (e) kitchen, & (e) bathroom. install w/dDetails
unit 2b: rehabilite (e) kitchen, & (e) bathroom. install w/d | $37,000 |