Back to bathroom remodel contractors
Wk Construction Inc
- Based in
- Albany
- On San Francisco permits
- Oct 2016 to May 2022
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 6 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2022 | Completed final sign-off Jul 2022 | 1482 23rd Av | convert 1 full bathroom into 2 full bathrooms.Details
convert 1 full bathroom into 2 full bathrooms. | $20,000 |
| Jan 25, 2021 | Completed final sign-off Aug 2021 | 54 Stanyan St | unit #56: remodel kitchen, 1 full bathroom, powder room with new cabinets, fixtures & finish. add recessed led light fixtures throuthout. replace (e) windows not visible from street.Details
unit #56: remodel kitchen, 1 full bathroom, powder room with new cabinets, fixtures & finish. add recessed led light fixtures throuthout. replace (e) windows not visible from street. | $42,000 |
| Oct 7, 2020 | Completed final sign-off Dec 2020 | 789 Buena Vista Ave West Av | remodel 1 full bath in 102 2nd fl replace toilet, lavatgory and fixtures with newDetails
remodel 1 full bath in 102 2nd fl replace toilet, lavatgory and fixtures with new | $10,000 |
| Dec 30, 2019 | Completed final sign-off Jan 2022 | 1829 Fulton St | kitchen and bathroom remodel on 2nd floor. add interior stair for connecting ground floor to 2nd floor. rooms down (one full bath)Details
kitchen and bathroom remodel on 2nd floor. add interior stair for connecting ground floor to 2nd floor. rooms down (one full bath) | $43,000 |
| Apr 17, 2018 | Completed final sign-off Oct 2018 | 20 San Antonio Pl | unit 2b: rehabilite (e) kitchen, & (e) bathroom. install w/dDetails
unit 2b: rehabilite (e) kitchen, & (e) bathroom. install w/d | $37,000 |
| Oct 31, 2016 | Completed final sign-off Jan 2023 | 162 Carl St | demolish (e) rear extension on 1st & 2nd flrs; rebuild (e) internal stair; remodel 3rd flr bath, closets & master bdrm; horizontal addition on three flrs.Details
demolish (e) rear extension on 1st & 2nd flrs; rebuild (e) internal stair; remodel 3rd flr bath, closets & master bdrm; horizontal addition on three flrs. | $350,000 |