Back to kitchen remodel contractors
Wisdom Electrical & Bldg Contractors
- Based in
- San Francisco
- On San Francisco permits
- Jun 2003 to Feb 2026
- Last 24 months
- 1 permit filed
33 permits since 2000: 21 completed, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 6 completed, 4 never finaled. Typically 0 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2023 | Completed final sign-off Jan 2025 | 3511 23rd St | kitchen & bath remodel, turn 3-bedroom, 2.5-bath to a 3-bedroom, 2-bath, new laundry room, update all power/lighting per plan. no exterior work.Details
kitchen & bath remodel, turn 3-bedroom, 2.5-bath to a 3-bedroom, 2-bath, new laundry room, update all power/lighting per plan. no exterior work. | $65,000 |
| Mar 23, 2023 | Completed final sign-off Jan 2025 | 3511 23rd St | units 2 & 3: kitchen and bathroom remodeling, install new electrical wiring, install new plumbing work. total of (2) baths & (2) kitchen remodels, non structural.Details
units 2 & 3: kitchen and bathroom remodeling, install new electrical wiring, install new plumbing work. total of (2) baths & (2) kitchen remodels, non structural. | $75,000 |
| Jan 29, 2020 | Completed final sign-off Sep 2020 | 1839 15th St | 6'x10' bathroom & 7' x13' kitchen remodeling. install new bathtub, new faucet, tile around walls. install new cabinetsDetails
6'x10' bathroom & 7' x13' kitchen remodeling. install new bathtub, new faucet, tile around walls. install new cabinets | $25,000 |
| Oct 28, 2019 | Completed final sign-off Jun 2020 | 360 Guerrero St | kitchen remodeling in kind. maintain all (e) adaptable clearances. remove existing cabinets, install new cabinets & counter top. install 3 led recessed lights.Details
kitchen remodeling in kind. maintain all (e) adaptable clearances. remove existing cabinets, install new cabinets & counter top. install 3 led recessed lights. | $20,000 |
| Feb 27, 2019 | Never finaled issued Feb 2019, no final | 2747 41st Av | kitchen remodel. remove (e) cabinets, wall & ceiling sheetrock. drywall removal limited to only one side for mep work. install new plumbg, electrical work, new cabinets, (3) recesslight for living room.Details
kitchen remodel. remove (e) cabinets, wall & ceiling sheetrock. drywall removal limited to only one side for mep work. install new plumbg, electrical work, new cabinets, (3) recesslight for living room. | $20,000 |
| Feb 1, 2018 | Completed final sign-off Nov 2018 | 1000 Bush St | revision to app#201710252263. reconfigure kitchen and customer area floor plan. upgrade extg 8 feet type 1 hood & extg 7' type 2 hood. to nw 15 feet type 1 hood, upgrade bathroom (ansul fire suppression system under seperate permit). n/a for maherDetails
revision to app#201710252263. reconfigure kitchen and customer area floor plan. upgrade extg 8 feet type 1 hood & extg 7' type 2 hood. to nw 15 feet type 1 hood, upgrade bathroom (ansul fire suppression system under seperate permit). n/a for maher | $1,000 |
| May 19, 2016 | Never finaled issued May 2016, no final | 1099 Mississippi St | remove existing cabinets, install new cabinets, (6) led recess light in kitchen area and under counter lighting. no change to walls, door or openings.Details
remove existing cabinets, install new cabinets, (6) led recess light in kitchen area and under counter lighting. no change to walls, door or openings. | $14,000 |
| Sep 10, 2013 | Completed final sign-off Dec 2013 | 3898 19th St | kitchen and bath remodel, install 30 recessed lights. 15 outlets. build new 1/2 bath and sheetrock workDetails
kitchen and bath remodel, install 30 recessed lights. 15 outlets. build new 1/2 bath and sheetrock work | $40,000 |
| Oct 18, 2005 | Never finaled issued Oct 2005, no final | 1138 Valencia St | kitchen remodeling install new cabs, new elec wiring and flr linoleum no structral wor, nov 200562850 dated 8/25/05Details
kitchen remodeling install new cabs, new elec wiring and flr linoleum no structral wor, nov 200562850 dated 8/25/05 | $7,000 |
| Oct 18, 2005 | Never finaled issued Oct 2005, no final | 1128 Valencia St | kitchen & bathrom remodeling ne elec- comply with nov 200562008-dated 7/25/2005- new electrical wiring for kitchen & bathroom, plumbing work, cabs & linoleum for flr & painting no structuralDetails
kitchen & bathrom remodeling ne elec- comply with nov 200562008-dated 7/25/2005- new electrical wiring for kitchen & bathroom, plumbing work, cabs & linoleum for flr & painting no structural | $12,500 |