Back to bathroom remodel contractors
Wisdom Electrical & Bldg Contractors
- Based in
- San Francisco
- On San Francisco permits
- Jun 2003 to Feb 2026
- Last 24 months
- 1 permit filed
33 permits since 2000: 21 completed, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 11 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2026 | Completed final sign-off Mar 2026 | 2355 Jones St | dry rot repair for unit# 4 & unit# 2. bedroom (unit# 4). toilet / half bath at unit# 2. painting & repair.Details
dry rot repair for unit# 4 & unit# 2. bedroom (unit# 4). toilet / half bath at unit# 2. painting & repair. | $13,500 |
| Jun 30, 2023 | Completed final sign-off Jan 2025 | 3511 23rd St | kitchen & bath remodel, turn 3-bedroom, 2.5-bath to a 3-bedroom, 2-bath, new laundry room, update all power/lighting per plan. no exterior work.Details
kitchen & bath remodel, turn 3-bedroom, 2.5-bath to a 3-bedroom, 2-bath, new laundry room, update all power/lighting per plan. no exterior work. | $65,000 |
| Mar 23, 2023 | Completed final sign-off Jan 2025 | 3511 23rd St | units 2 & 3: kitchen and bathroom remodeling, install new electrical wiring, install new plumbing work. total of (2) baths & (2) kitchen remodels, non structural.Details
units 2 & 3: kitchen and bathroom remodeling, install new electrical wiring, install new plumbing work. total of (2) baths & (2) kitchen remodels, non structural. | $75,000 |
| Jan 29, 2020 | Completed final sign-off Sep 2020 | 1839 15th St | 6'x10' bathroom & 7' x13' kitchen remodeling. install new bathtub, new faucet, tile around walls. install new cabinetsDetails
6'x10' bathroom & 7' x13' kitchen remodeling. install new bathtub, new faucet, tile around walls. install new cabinets | $25,000 |
| Aug 22, 2019 | Completed final sign-off Nov 2019 | 261 Henry St | demo (e) bathroom build addition half bath and shower area, install 5 recess light fixtures and plumbing workDetails
demo (e) bathroom build addition half bath and shower area, install 5 recess light fixtures and plumbing work | $32,000 |
| Mar 23, 2018 | Completed final sign-off Nov 2018 | 1000 Bush St | revision to app#201802010149. reconfigure ada bathroom floor plan. n/a for maherDetails
revision to app#201802010149. reconfigure ada bathroom floor plan. n/a for maher | $1,000 |
| Feb 1, 2018 | Completed final sign-off Nov 2018 | 1000 Bush St | revision to app#201710252263. reconfigure kitchen and customer area floor plan. upgrade extg 8 feet type 1 hood & extg 7' type 2 hood. to nw 15 feet type 1 hood, upgrade bathroom (ansul fire suppression system under seperate permit). n/a for maherDetails
revision to app#201710252263. reconfigure kitchen and customer area floor plan. upgrade extg 8 feet type 1 hood & extg 7' type 2 hood. to nw 15 feet type 1 hood, upgrade bathroom (ansul fire suppression system under seperate permit). n/a for maher | $1,000 |
| Jan 11, 2018 | Expired or cancelled cancelled Jan 2026 | 1000 Bush St | revision to pa 2017-1025-2263 relocate handsink for ada bathroomDetails
revision to pa 2017-1025-2263 relocate handsink for ada bathroom | |
| Oct 25, 2017 | Completed final sign-off Nov 2018 | 1000 Bush St | addition a type 1 hood and moving the extg electrical panel and making bathroom handicapp accessible. n/a for maher.Details
addition a type 1 hood and moving the extg electrical panel and making bathroom handicapp accessible. n/a for maher. | $32,000 |
| Apr 4, 2017 | Never finaled issued Apr 2017, no final | 2239 15th St | bathroom remodel: remove existing bathtub and vanity. install new bathtub, vanity, tiles around the walls, (3) recess light fixtures and fan. new plumbing work.Details
bathroom remodel: remove existing bathtub and vanity. install new bathtub, vanity, tiles around the walls, (3) recess light fixtures and fan. new plumbing work. | $15,000 |
| Jun 15, 2016 | Completed final sign-off Oct 2016 | 2224 Francisco St | bathroom remodeling. remove bath tub, vanity, toilet, install new bathtub, tile, vanity, toilet. n/a for maher.Details
bathroom remodeling. remove bath tub, vanity, toilet, install new bathtub, tile, vanity, toilet. n/a for maher. | $13,000 |
| Mar 22, 2016 | Completed final sign-off Jan 2017 | 1839 15th St | remove existing bath tub & tile around. install walk in shower and tile work. lights have been installed under sep permit. unit 157Details
remove existing bath tub & tile around. install walk in shower and tile work. lights have been installed under sep permit. unit 157 | $8,500 |
| Sep 10, 2013 | Completed final sign-off Dec 2013 | 3898 19th St | kitchen and bath remodel, install 30 recessed lights. 15 outlets. build new 1/2 bath and sheetrock workDetails
kitchen and bath remodel, install 30 recessed lights. 15 outlets. build new 1/2 bath and sheetrock work | $40,000 |
| Dec 31, 2012 | Never finaled issued Dec 2012, no final | 1011 23rd St | remodeling bathroom, remove existing bath tub and tile, install shower pan and new tile workDetails
remodeling bathroom, remove existing bath tub and tile, install shower pan and new tile work | $4,500 |
| Dec 21, 2010 | Never finaled issued Dec 2010, no final | 32 Elgin Pk | work on #32 only - bathroom remodeling, remove old bathtub, wall tile, install new plumbing work, new bathtub, tile. use 5/8" type x gypsum to replace removed drywall. high efficacy or occupancy sensor lighting.Details
work on #32 only - bathroom remodeling, remove old bathtub, wall tile, install new plumbing work, new bathtub, tile. use 5/8" type x gypsum to replace removed drywall. high efficacy or occupancy sensor lighting. | $5,000 |
| Oct 18, 2005 | Never finaled issued Oct 2005, no final | 1128 Valencia St | kitchen & bathrom remodeling ne elec- comply with nov 200562008-dated 7/25/2005- new electrical wiring for kitchen & bathroom, plumbing work, cabs & linoleum for flr & painting no structuralDetails
kitchen & bathrom remodeling ne elec- comply with nov 200562008-dated 7/25/2005- new electrical wiring for kitchen & bathroom, plumbing work, cabs & linoleum for flr & painting no structural | $12,500 |