Wing Cheung Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2003 to Aug 2018
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 8 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2010 | Completed final sign-off Nov 2010 | 2090 Mission St | to comply with nov # 201079026. provide handrails at main stairs at all three floors; handrail to comply with 1012 and 1009 sfbc, height to be 34 to 38 min size of gripable area, 1.25 to 2 inch, provide hand rail extension 12 beyond top riser and @ bottomDetails
to comply with nov # 201079026. provide handrails at main stairs at all three floors; handrail to comply with 1012 and 1009 sfbc, height to be 34 to 38 min size of gripable area, 1.25 to 2 inch, provide hand rail extension 12 beyond top riser and @ bottom | $200 |
| Feb 24, 2009 | Completed final sign-off May 2009 | 230 Leland Av | revision to pa #200901059529 to remove existing wood stair in lightwell & construct a hallway to rear yard, relocate full bathroom to left side of family on ground floor.Details
revision to pa #200901059529 to remove existing wood stair in lightwell & construct a hallway to rear yard, relocate full bathroom to left side of family on ground floor. | |
| Oct 16, 2008 | Completed final sign-off Sep 2012 | 1 Estero Av | vertical & horizontal addition - add one new level on (e) one level bldg. remodel first floor. add a new stair & a half bathroom on basement and enlarge basement floor.Details
vertical & horizontal addition - add one new level on (e) one level bldg. remodel first floor. add a new stair & a half bathroom on basement and enlarge basement floor. | $300,000 |