Back to bathroom remodel contractors
Wing Cheung Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2003 to Aug 2018
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 84 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2018 | Completed final sign-off Aug 2019 | 3910 Mission St | commercial space only. comply w/ mandatory soft story program per sfebc chapter 4-d. ada upgrade for bathroom.Details
commercial space only. comply w/ mandatory soft story program per sfebc chapter 4-d. ada upgrade for bathroom. | $60,000 |
| Aug 17, 2011 | Completed final sign-off Mar 2012 | 4018 Mission St | to comply with nov# 201148887 dated july 4, 2011. repair and remodel fire damage building. replace interior sheet rock and all floors. replace all damage windows and doors. rebuild fire damaged walls, floors joists and plywood, subfloor on second floor. add 1/2 bathroom and 1 bdrm on 2nd and 3rd flrDetails
to comply with nov# 201148887 dated july 4, 2011. repair and remodel fire damage building. replace interior sheet rock and all floors. replace all damage windows and doors. rebuild fire damaged walls, floors joists and plywood, subfloor on second floor. add 1/2 bathroom and 1 bdrm on 2nd and 3rd flr | $150,000 |
| Feb 24, 2009 | Completed final sign-off May 2009 | 230 Leland Av | revision to pa #200901059529 to remove existing wood stair in lightwell & construct a hallway to rear yard, relocate full bathroom to left side of family on ground floor.Details
revision to pa #200901059529 to remove existing wood stair in lightwell & construct a hallway to rear yard, relocate full bathroom to left side of family on ground floor. | |
| Oct 16, 2008 | Completed final sign-off Sep 2012 | 1 Estero Av | vertical & horizontal addition - add one new level on (e) one level bldg. remodel first floor. add a new stair & a half bathroom on basement and enlarge basement floor.Details
vertical & horizontal addition - add one new level on (e) one level bldg. remodel first floor. add a new stair & a half bathroom on basement and enlarge basement floor. | $300,000 |