Back to kitchen remodel contractors
Winfield Building Group Dba C.W. Dillion
- Based in
- Harbor City
- On San Francisco permits
- Jun 2018 to Nov 2025
- Last 24 months
- 2 permits filed
55 permits since 2000: 25 completed, 2 in progress, 27 never finaled, 1 expired or cancelled.
Of the 27 never-finaled permits, 10 are 3 to 5 years old, 17 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
39 kitchen remodel permits: 19 completed, 1 in progress, 18 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 406 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2025 | Completed final sign-off Apr 2026 | 680 Mission St | unit a2f: kitchen and bathroom remodel. no walls moved, floor plan to remain unchanged fire deparation between units and mep maintained. no doors/windows alterations. no work outside, shall comply with chapter 11a(1102a.2. 1133a, and 1134a)Details
unit a2f: kitchen and bathroom remodel. no walls moved, floor plan to remain unchanged fire deparation between units and mep maintained. no doors/windows alterations. no work outside, shall comply with chapter 11a(1102a.2. 1133a, and 1134a) | $16,000 |
| Sep 14, 2023 | In progress issued Oct 2023 | 680 Mission St | unit's: 24r, 10f, 10g- 1 kitchen and 1 bathroom remodel in each unit. no walls moved. floor plan to remain unchanged. fire seperation btw unit's and mep maintained. no door/ window alteration. no work outside unit's.Details
unit's: 24r, 10f, 10g- 1 kitchen and 1 bathroom remodel in each unit. no walls moved. floor plan to remain unchanged. fire seperation btw unit's and mep maintained. no door/ window alteration. no work outside unit's. | $220,000 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 680 Mission St | residential unit's: 24k, 36n, 10e, 21k: kitchen and bath remodel: 4 units- floor plan to remain unchanged. mep maintained. no alterations to window's and doors, no work outside unit, no walls moved. no structural work. remodel in kind. accessibility per cbc chapter 11a to be maintained.Details
residential unit's: 24k, 36n, 10e, 21k: kitchen and bath remodel: 4 units- floor plan to remain unchanged. mep maintained. no alterations to window's and doors, no work outside unit, no walls moved. no structural work. remodel in kind. accessibility per cbc chapter 11a to be maintained. | $326,020 |
| Mar 2, 2023 | Never finaled issued Mar 2023, no final | 680 Mission St | unit# 21k:one kitchen & one bath remodel, 1unit, floor plan to remain unchanged. mep maintained. no alterations to windows & doors. no work outside unit, remodel in kind. no walls moved. no structural work.Details
unit# 21k:one kitchen & one bath remodel, 1unit, floor plan to remain unchanged. mep maintained. no alterations to windows & doors. no work outside unit, remodel in kind. no walls moved. no structural work. | $90,430 |
| Mar 2, 2023 | Completed final sign-off Nov 2023 | 680 Mission St | unit# 37c & 10k, #40e: kitchen & bath remodel, 2 units, floor plan to remain unchanged. mep maintained. no alterations to windows & doors. no work outside unit, remodel in kind. no walls moved. no structural work.Details
unit# 37c & 10k, #40e: kitchen & bath remodel, 2 units, floor plan to remain unchanged. mep maintained. no alterations to windows & doors. no work outside unit, remodel in kind. no walls moved. no structural work. | $90,430 |
| Feb 28, 2023 | Expired or cancelled cancelled Jan 2026 | 690 Mission St | kitchen and bathroom remodel on 4 unit(s) 37c,10k,21k,40e, floorplan to remain unchanges. all adaptable features and fire seperation maintained. mep maintained. no alterations to windows and doors. no work outside unit. remodels in kind. no walls moved no structural work.Details
kitchen and bathroom remodel on 4 unit(s) 37c,10k,21k,40e, floorplan to remain unchanges. all adaptable features and fire seperation maintained. mep maintained. no alterations to windows and doors. no work outside unit. remodels in kind. no walls moved no structural work. | $90,000 |
| Sep 26, 2022 | Never finaled issued Feb 2023, no final | 1601 Mariposa St | pdr-3: tenant improvement-addition of closet, new kitchen equipment, finishes, ceiling and lightingDetails
pdr-3: tenant improvement-addition of closet, new kitchen equipment, finishes, ceiling and lighting | $30,000 |
| Sep 12, 2022 | Completed final sign-off Jun 2023 | 680 Mission St | unit 41# 35g 111c- 3 kitchen, 3 bath remodel , no walls moved. floor plan to remain unchanged. all adaptable features maintained. fire separtaion maintained between unit units. mep maintained no alterations to windows or doors. no work outside unit. kitchens and bathrooms remodel in kind.Details
unit 41# 35g 111c- 3 kitchen, 3 bath remodel , no walls moved. floor plan to remain unchanged. all adaptable features maintained. fire separtaion maintained between unit units. mep maintained no alterations to windows or doors. no work outside unit. kitchens and bathrooms remodel in kind. | $49,000 |
| Aug 18, 2022 | Completed final sign-off Nov 2022 | 680 Mission St | unit 12b, 29n, 32e: one kitchen & one bathroom remodel each in the three units. no walls moved. ploor plan to remain unchanged. fire separation between units & mep maintained. no door/ window alteration. no work outside unit.Details
unit 12b, 29n, 32e: one kitchen & one bathroom remodel each in the three units. no walls moved. ploor plan to remain unchanged. fire separation between units & mep maintained. no door/ window alteration. no work outside unit. | $49,000 |
| Oct 20, 2021 | Completed final sign-off Jun 2023 | 680 Mission St | units 26g, 10p, 18c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units and mep maintained. no door/window alteration. no work outside unit. no structural work- no wall / framing modification.Details
units 26g, 10p, 18c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units and mep maintained. no door/window alteration. no work outside unit. no structural work- no wall / framing modification. | $70,000 |
| Oct 20, 2021 | Completed final sign-off May 2022 | 680 Mission St | units 12r, 12c, 11c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units and mep maintained. no door/window alteration. no work outside unit.Details
units 12r, 12c, 11c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units and mep maintained. no door/window alteration. no work outside unit. | $70,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2022 | 680 Mission St | units 10r, 17b, 17c: kitchen & bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units.Details
units 10r, 17b, 17c: kitchen & bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units. | $63,000 |
| Aug 10, 2021 | Completed final sign-off May 2022 | 680 Mission St | units 15c, 31l, 21e: (3) kitchen & (3) bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units.Details
units 15c, 31l, 21e: (3) kitchen & (3) bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units. | $63,000 |
| Aug 10, 2021 | Never finaled issued Aug 2021, no final | 680 Mission St | units 17e, 40f, 32g: (3) kitchen & (3) bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units.Details
units 17e, 40f, 32g: (3) kitchen & (3) bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units. | $63,000 |
| Apr 19, 2021 | Completed final sign-off Nov 2023 | 680 Mission St | units 26d/40a/16s/30b/35r kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units.Details
units 26d/40a/16s/30b/35r kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units. | $49,500 |
| Apr 19, 2021 | Never finaled issued Apr 2021, no final | 680 Mission St | units 35k/22t/39a/21t/30t 1 kitchen & 1 bathroom remodel in each unit (total 5 units). no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windows alteration. no work outside units. no new wall & no existing wall relocation. new lighting shallDetails
units 35k/22t/39a/21t/30t 1 kitchen & 1 bathroom remodel in each unit (total 5 units). no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windows alteration. no work outside units. no new wall & no existing wall relocation. new lighting shall | $49,500 |
| Apr 19, 2021 | Completed final sign-off May 2022 | 680 Mission St | units 27r/09e/20s/28e/12e kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units.Details
units 27r/09e/20s/28e/12e kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units. | $49,500 |
| Apr 19, 2021 | Completed final sign-off Nov 2023 | 680 Mission St | units 23t, 24s, 41a, 10m, 41b kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintained. no doors/windows alteration. no work outside units.Details
units 23t, 24s, 41a, 10m, 41b kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintained. no doors/windows alteration. no work outside units. | $49,500 |
| Apr 19, 2021 | Completed final sign-off Jun 2022 | 680 Mission St | units 20t, 09h, 10j, 22s, 39h. one kitchen & one bath remodel each at 5 units. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windows alteration. no work outside units. no new wall x no existing wall relocation. new lighting shall comply w/Details
units 20t, 09h, 10j, 22s, 39h. one kitchen & one bath remodel each at 5 units. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windows alteration. no work outside units. no new wall x no existing wall relocation. new lighting shall comply w/ | $49,500 |
| Apr 19, 2021 | Never finaled issued Apr 2021, no final | 680 Mission St | units 35a/25t/08j/15f/10n: kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units.Details
units 35a/25t/08j/15f/10n: kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units. | $49,500 |
| Apr 19, 2021 | Completed final sign-off May 2022 | 680 Mission St | units 14e/34r/34c/36m/37e kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units.Details
units 14e/34r/34c/36m/37e kitchen & bathroom remodel. no walls moved. floor plan to remain unchanged fire separation between units & mep maintaineed. no doors/windowsw alteration. no work outside units. | $49,500 |
| Feb 6, 2020 | Never finaled issued Feb 2020, no final | 680 Mission St | units 40b, 23b, 12f kitchen & bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units & mep maintained. no doors/window alteration. no work outside unitsDetails
units 40b, 23b, 12f kitchen & bath remodel. no walls moved. floor plan to remain unchanged. fire separation between units & mep maintained. no doors/window alteration. no work outside units | $50,000 |
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 680 Mission St | units 26r, 32 t, 32c, 20 p, 15, p: kitchen and bath remodel. no walls moved, floor plan to reamin unchanged. all e adaptable features maintained. fire sep maintained between units. mep maintained. no alt to windows or doors. no work outside.Details
units 26r, 32 t, 32c, 20 p, 15, p: kitchen and bath remodel. no walls moved, floor plan to reamin unchanged. all e adaptable features maintained. fire sep maintained between units. mep maintained. no alt to windows or doors. no work outside. | $75,000 |
| Oct 21, 2019 | Never finaled issued Nov 2019, no final | 680 Mission St | units lot, 10t, 31c, 16p, 32d, 22r, kitchen and bath remodel. no walls moved, floor plan to remain unchanged, all (e) adaptable features maintained fire separation maintained betwen units, mep maintained, no alteration to windows or doors, no work outside unitsDetails
units lot, 10t, 31c, 16p, 32d, 22r, kitchen and bath remodel. no walls moved, floor plan to remain unchanged, all (e) adaptable features maintained fire separation maintained betwen units, mep maintained, no alteration to windows or doors, no work outside units | $75,000 |
| Aug 27, 2019 | Never finaled issued Sep 2019, no final | 680 Mission St | units 31a,28l,36p,30g,19c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to wndows or doors. no work outside units. no change of (e) floor plan.Details
units 31a,28l,36p,30g,19c: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to wndows or doors. no work outside units. no change of (e) floor plan. | $75,000 |
| Aug 9, 2019 | Completed final sign-off Jun 2022 | 680 Mission St | units 30e, 25p, 33r, 23e, 27d - kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside unitsDetails
units 30e, 25p, 33r, 23e, 27d - kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no alteration to windows or doors. no work outside units | $75,000 |
| Jul 11, 2019 | Never finaled issued Jul 2019, no final | 680 Mission St | units 28c, 27k, 12k,36l,20k: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintain between units. mep maintained. no alteration to windows or doors. no work outside units.Details
units 28c, 27k, 12k,36l,20k: kitchen and bath remodel. no walls moved. floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintain between units. mep maintained. no alteration to windows or doors. no work outside units. | $75,000 |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 680 Mission St | units 29r, 20e, 28d,11b,23r for kitchen and bath remodel. no walls moved, floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintained between units. mep maintained no change. no alteration of walls, windows or doors. no work outside units.Details
units 29r, 20e, 28d,11b,23r for kitchen and bath remodel. no walls moved, floor plan to remain unchanged. all extg adaptable features maintained. fire separation maintained between units. mep maintained no change. no alteration of walls, windows or doors. no work outside units. | $150,000 |
| Jun 21, 2019 | Completed final sign-off Sep 2021 | 680 Mission St | units 20c, 20f, 18t, 31s, 33c. kitchen & bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained btwn units. mep maintained no change. no alteration of walls. windows or doors. no work outside unit. no plans/no work outside unitDetails
units 20c, 20f, 18t, 31s, 33c. kitchen & bath remodel. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained. fire separation maintained btwn units. mep maintained no change. no alteration of walls. windows or doors. no work outside unit. no plans/no work outside unit | $75,000 |
| Jun 14, 2019 | Never finaled issued Jun 2019, no final | 680 Mission St | units# 30s, 35c, 15r, 21n, 29e kitchen & bath remodel. no walls to be moved. floor plan unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no change. no alteration of walls, windows or doors.Details
units# 30s, 35c, 15r, 21n, 29e kitchen & bath remodel. no walls to be moved. floor plan unchanged. all (e) adaptable features maintained. fire separation maintained between units. mep maintained. no change. no alteration of walls, windows or doors. | $100,000 |
| May 10, 2019 | Completed final sign-off Jan 2022 | 680 Mission St | (5) units 09b, 27t, 39f, 19e, 19f. 1 kitchen and 1 bath remodel in kind. no walls moved. flr plan to remain unchanged. all (e) adaptable features to be maintained. fire seperations maintained btw units. mep maintained no change. no plans.Details
(5) units 09b, 27t, 39f, 19e, 19f. 1 kitchen and 1 bath remodel in kind. no walls moved. flr plan to remain unchanged. all (e) adaptable features to be maintained. fire seperations maintained btw units. mep maintained no change. no plans. | $90,000 |
| Apr 26, 2019 | Completed final sign-off Jan 2022 | 680 Mission St | (5 units) units #08e, 33d, 36r, 28s, 36b. (1) kitchen and (1) bath remodel in kind per unit. no walls moved. floor plan to remain unchanged. all existing adaptable features to be maintained. fire separation maintained between units. mep maintained no change.Details
(5 units) units #08e, 33d, 36r, 28s, 36b. (1) kitchen and (1) bath remodel in kind per unit. no walls moved. floor plan to remain unchanged. all existing adaptable features to be maintained. fire separation maintained between units. mep maintained no change. | $90,000 |
| Mar 21, 2019 | Never finaled issued Mar 2019, no final | 680 Mission St | units #24c, 11r, 18r, 19r, a2h. kitchen & bath remodel. no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separation maintained between units. mep maintained. no alteration of wall window or door.Details
units #24c, 11r, 18r, 19r, a2h. kitchen & bath remodel. no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separation maintained between units. mep maintained. no alteration of wall window or door. | $100,000 |
| Mar 14, 2019 | Never finaled issued Mar 2019, no final | 680 Mission St | units 29p, 12p, 33e and 35d - kitchen and bath remodel in kind. no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separation maintained between units. mep maintainedDetails
units 29p, 12p, 33e and 35d - kitchen and bath remodel in kind. no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separation maintained between units. mep maintained | $150,000 |
| Feb 7, 2019 | Completed final sign-off Jan 2022 | 680 Mission St | units 20r, 29t, 18g, 30c, 24t. kitchen and bath remodel, no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separted maintained between units. mep maintained no change. no alteration or walls, windows, and doorDetails
units 20r, 29t, 18g, 30c, 24t. kitchen and bath remodel, no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separted maintained between units. mep maintained no change. no alteration or walls, windows, and door | $75,000 |
| Jan 28, 2019 | Never finaled issued Jan 2019, no final | 680 Mission St | units 33s, 16c, 19g, 34g, 34p kitchen and bath remodel no wall moved floor plan ot remain unchanged, a (e) adaptable reatures to be maintained fire seperation maintained, between units. mep maintaied no changeDetails
units 33s, 16c, 19g, 34g, 34p kitchen and bath remodel no wall moved floor plan ot remain unchanged, a (e) adaptable reatures to be maintained fire seperation maintained, between units. mep maintaied no change | $75,000 |
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 680 Mission St | units 17r, 17t, 12g, 31p kitchen and bath remodel. no walls moved. floor plan to remain unchanged. a(e) adaptable features to be maintained. fire seperation maintained btw unit mep maintained no change no plansDetails
units 17r, 17t, 12g, 31p kitchen and bath remodel. no walls moved. floor plan to remain unchanged. a(e) adaptable features to be maintained. fire seperation maintained btw unit mep maintained no change no plans | $75,000 |
| Jun 29, 2018 | Never finaled issued Jul 2018, no final | 680 Mission St | kitchen and bath remodel for units 15c, 31d, 12s. no walls moved, added or infilled. layout to remain unchanged. all (e) adaptable features are to be maintained. maher naDetails
kitchen and bath remodel for units 15c, 31d, 12s. no walls moved, added or infilled. layout to remain unchanged. all (e) adaptable features are to be maintained. maher na | $75,000 |
| Jun 29, 2018 | Completed final sign-off Sep 2019 | 680 Mission St | kitchen and bath remodel for units 24n, 10s, 12t, 33b,33k. no walls moved, added or infilled. layout to remain unchanged. all (e) adaptable features are to be maintained. maher naDetails
kitchen and bath remodel for units 24n, 10s, 12t, 33b,33k. no walls moved, added or infilled. layout to remain unchanged. all (e) adaptable features are to be maintained. maher na | $125,000 |