William Pattengill
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Jul 2019
- Last 24 months
- 0 permits filed
76 permits since 2000: 62 completed, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 2 days from filing to permit and 237 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2018 | Completed final sign-off May 2019 | 493 Molimo Dr | replace open grill work at entry with ext door with glass panel, transom window above in new stucco wall, construct 3 partitions below e front overhang, 30" w x11'6 h at gr level. replace front and rear roofdeck guardrails with solid parapet 42" above deck level 3rd flDetails
replace open grill work at entry with ext door with glass panel, transom window above in new stucco wall, construct 3 partitions below e front overhang, 30" w x11'6 h at gr level. replace front and rear roofdeck guardrails with solid parapet 42" above deck level 3rd fl | $25,000 |