Back to kitchen remodel contractors
William Pattengill
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Jul 2019
- Last 24 months
- 0 permits filed
76 permits since 2000: 62 completed, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 never finaled. Typically 2 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2019 | Completed final sign-off Jan 2020 | 830 Victoria St | remove 2 bearing walls @ kitchen, close up (e) door replace kitchen window w/ext door, construct landing & stair. 2 dining room, windows w/sliding patio door. construct landing w/stair @ rear yard deck = below 10 ft high, not to extend beyond (e) rear wall of bldgDetails
remove 2 bearing walls @ kitchen, close up (e) door replace kitchen window w/ext door, construct landing & stair. 2 dining room, windows w/sliding patio door. construct landing w/stair @ rear yard deck = below 10 ft high, not to extend beyond (e) rear wall of bldg | $12,000 |
| Jan 14, 2019 | Never finaled issued Jan 2019, no final | 830 Victoria St | replace kitchen cabinets, counters, appliances, flooring, elec, upgrade area 112 square ft.Details
replace kitchen cabinets, counters, appliances, flooring, elec, upgrade area 112 square ft. | $10,000 |
| Aug 1, 2018 | Completed final sign-off Dec 2018 | 493 Molimo Dr | replace kitchen cabinets, counters, sinks, range, upgrade kitchen electric circuits. no change on walls.Details
replace kitchen cabinets, counters, sinks, range, upgrade kitchen electric circuits. no change on walls. | $10,000 |
| Dec 12, 2017 | Completed final sign-off Aug 2018 | 1436 Valencia St | 2/f -kitchen remodel, 1 bathroom remodel, 1 bathroom addition at extg rear enclosed porch, replace window at rear and at bathroom at (e) lightwell.n/a for maherDetails
2/f -kitchen remodel, 1 bathroom remodel, 1 bathroom addition at extg rear enclosed porch, replace window at rear and at bathroom at (e) lightwell.n/a for maher | $90,000 |
| Oct 2, 2017 | Completed final sign-off May 2018 | 75 Lyell St | construct (n) bedroom, laundry, bathroom, family room @ ground fl. enclose (e) lightwell to enlarge bathroom @ 2nd fl. replace kitchen cabinets, fixture, open wall to dining room. remove partitions @ (e) stair, replace with open guardrail. relocate lower section of stair to (n) family roomDetails
construct (n) bedroom, laundry, bathroom, family room @ ground fl. enclose (e) lightwell to enlarge bathroom @ 2nd fl. replace kitchen cabinets, fixture, open wall to dining room. remove partitions @ (e) stair, replace with open guardrail. relocate lower section of stair to (n) family room | $150,000 |
| Mar 29, 2016 | Completed final sign-off Jul 2016 | 231 Olive St | kitchen remodel of single unit residential building, install beam for removal of interior wall. n/a ordinance #155-13Details
kitchen remodel of single unit residential building, install beam for removal of interior wall. n/a ordinance #155-13 | $10,000 |
| Mar 24, 2016 | Completed final sign-off Sep 2016 | 243 Moscow St | renovation of existing single family dwelling: add family room, home office, half bath, master bedroom & bathroom (695 sq.ft.) on first floor; remodel (e) kitchen & bathroom on second floor.Details
renovation of existing single family dwelling: add family room, home office, half bath, master bedroom & bathroom (695 sq.ft.) on first floor; remodel (e) kitchen & bathroom on second floor. | $60,000 |
| Oct 10, 2014 | Completed final sign-off Jan 2015 | 175 Russ St | remove (e) bathroom, relocate (e) kitchen to location of bathroom; maher n/aDetails
remove (e) bathroom, relocate (e) kitchen to location of bathroom; maher n/a | $25,000 |
| Aug 7, 2014 | Completed final sign-off Mar 2015 | 356 Douglass St | #356(upper). replace kitchen cabinets, counter, gas range, sink, relocate plumbing, replace bathroom sink, w.c, tub & shower. patch drywall as required. #358:(lower). kitchen upgrade as above, remove & replace plaster ceiling w/drywall & insulation, patch drywall & walls. full electrical service upgDetails
#356(upper). replace kitchen cabinets, counter, gas range, sink, relocate plumbing, replace bathroom sink, w.c, tub & shower. patch drywall as required. #358:(lower). kitchen upgrade as above, remove & replace plaster ceiling w/drywall & insulation, patch drywall & walls. full electrical service upg | $40,000 |
| Dec 28, 2012 | Completed final sign-off Feb 2013 | 809 Fell St | replace 2 (e) windows w/frech doors in same opening. close up ext door from bathroom, remove partition at kitchen. no work visible from street. all work on the 2nd floor.Details
replace 2 (e) windows w/frech doors in same opening. close up ext door from bathroom, remove partition at kitchen. no work visible from street. all work on the 2nd floor. | $6,000 |
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 3239 Mission St | repl ktichen counter, sink, faucets, dishwasher, install 3 new cabinets, upgrade counter elec outlets, remove laminte flooring @ kitchen/dining area, repl with cer.tile, unit #7 only, no window,door, or rated ceiling of wall workDetails
repl ktichen counter, sink, faucets, dishwasher, install 3 new cabinets, upgrade counter elec outlets, remove laminte flooring @ kitchen/dining area, repl with cer.tile, unit #7 only, no window,door, or rated ceiling of wall work | $8,000 |
| Jun 9, 2009 | Completed final sign-off Sep 2009 | 3723 24th St | remodel kitchen, relocate window & door openings, insulate (e) wall & ceiling, replace drywall.Details
remodel kitchen, relocate window & door openings, insulate (e) wall & ceiling, replace drywall. | $35,000 |
| Aug 30, 2007 | Completed final sign-off Jan 2008 | 4109 21st St | remove & replace kitchen cabinets, all fixtures, lighting to comply with title 24 requirements. enlarge opening to dining room with related structural work @ garage below, replace wd. paneling @ dining room with drywall.Details
remove & replace kitchen cabinets, all fixtures, lighting to comply with title 24 requirements. enlarge opening to dining room with related structural work @ garage below, replace wd. paneling @ dining room with drywall. | $30,000 |