Wilkinson Preservation Fine Home Mainten
- Based in
- San Mateo
- On San Francisco permits
- Feb 2016 to Feb 2024
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 34 days from filing to permit and 732 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2021 | Never finaled issued Mar 2022, no final | 41 Telegraph Pl | replace e built up roof with modified between roof. replace e roof deck framing, decking, roof deck stair w new. replace e roof deck. guard rail new. fill in rear corners for rectangular roof deckDetails
replace e built up roof with modified between roof. replace e roof deck framing, decking, roof deck stair w new. replace e roof deck. guard rail new. fill in rear corners for rectangular roof deck | $25,000 |
| Nov 9, 2020 | Completed final sign-off Mar 2023 | 1501 Monterey Bl | voluntary garage strengthening to non-conforming structure. rev to ext. rear site stairs.Details
voluntary garage strengthening to non-conforming structure. rev to ext. rear site stairs. | $50,000 |
| Nov 9, 2020 | Completed final sign-off Sep 2022 | 1501 Monterey Bl | interior stair remodel from 1st to 2nd floor. all within (e) building envelope. revision to bpa # 2019-0122-0918.Details
interior stair remodel from 1st to 2nd floor. all within (e) building envelope. revision to bpa # 2019-0122-0918. | $80,000 |
| Aug 23, 2016 | Expired or cancelled cancelled Jan 2017 | 477 Flood Av | replace front window with all wood material windows to match existing, replace stairs with concrete stairs in kind.Details
replace front window with all wood material windows to match existing, replace stairs with concrete stairs in kind. | $15,000 |