Back to kitchen remodel contractors
Wilkinson Preservation Fine Home Mainten
- Based in
- San Mateo
- On San Francisco permits
- Feb 2016 to Feb 2024
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2022 | Completed final sign-off Jul 2022 | 282 Pixley St | one kitchen remodel like for like, no moving or removing walls.Details
one kitchen remodel like for like, no moving or removing walls. | $25,000 |
| Mar 5, 2021 | Completed final sign-off Jul 2021 | 67 Ord St | kitchen renovatin - move stove, hood, fridge - aditional lighting. no structural work. no framing modificaitonDetails
kitchen renovatin - move stove, hood, fridge - aditional lighting. no structural work. no framing modificaiton | $40,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2021 | 1449 Jefferson St | 2 bath remodel on 2nd & 3rd fl, 1 kitchen remodel 2nd fl, replace 2 extg fire inserts, install guardrail at 3rd floor mezzanine.Details
2 bath remodel on 2nd & 3rd fl, 1 kitchen remodel 2nd fl, replace 2 extg fire inserts, install guardrail at 3rd floor mezzanine. | $62,000 |
| Jan 25, 2019 | Completed final sign-off Apr 2021 | 41 Telegraph Pl | interior remodel to kitchen and 3 baths, install elevator, infill e 1st fl lightwell and install radiant heatDetails
interior remodel to kitchen and 3 baths, install elevator, infill e 1st fl lightwell and install radiant heat | $285,000 |
| Jun 30, 2016 | Completed final sign-off Jan 2017 | 475 Lombard St | remodel of kitchen and both bathrooms. new can lights throughout, refinish flooring, carpeting, paint. remodel laundry closetDetails
remodel of kitchen and both bathrooms. new can lights throughout, refinish flooring, carpeting, paint. remodel laundry closet | $150,000 |
| Feb 22, 2016 | Never finaled issued Feb 2016, no final | 2298 Pacific Av | installation of 12 new recessed can lights in hallway. installation of 8 new recessed can lights in library. refinish hardwood floors throughout. replace power room sink and kitchen faucets. paint entire interior to existing residential unit within multi family home. no exterior work,Details
installation of 12 new recessed can lights in hallway. installation of 8 new recessed can lights in library. refinish hardwood floors throughout. replace power room sink and kitchen faucets. paint entire interior to existing residential unit within multi family home. no exterior work, | $100,000 |