Back to kitchen remodel contractors
Wilkinson Design & Construction, Inc.
- Based in
- San Rafael
- On San Francisco permits
- Mar 2000 to Nov 2025
- Last 24 months
- 3 permits filed
52 permits since 2000: 41 completed, 2 in progress, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 in progress. Typically 0 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2025 | In progress issued Nov 2025 | 1447 Jefferson St | remodel existing kitchen and bathroom. tub to shower conversion. all fixtures in same locations. change and replace 1 patio door in garden area. non street visible.Details
remodel existing kitchen and bathroom. tub to shower conversion. all fixtures in same locations. change and replace 1 patio door in garden area. non street visible. | $53,000 |
| Aug 10, 2022 | Completed final sign-off Mar 2023 | 1362 26th Av | remodel e kitchen in kind, no structrual changes same foot print. remodel e bath. no structural changes. all work cosmeticDetails
remodel e kitchen in kind, no structrual changes same foot print. remodel e bath. no structural changes. all work cosmetic | $95,000 |
| Apr 19, 2022 | Completed final sign-off Oct 2022 | 1455 21st Av | remodel 1 kitchen 2nd floor in same footprint. keep (e) window. no structural changes.Details
remodel 1 kitchen 2nd floor in same footprint. keep (e) window. no structural changes. | $42,000 |
| May 3, 2019 | Completed final sign-off Jul 2025 | 10 Curtis St | horizontal addition. create habitable space below (e) kitchen & office. excavate lower level. new laundry room. new yoga room, new spa, new wine room, new dumbwaster. remodel (e) kitchen & bath. new driveway, driveway entrance, curb & rear deck.Details
horizontal addition. create habitable space below (e) kitchen & office. excavate lower level. new laundry room. new yoga room, new spa, new wine room, new dumbwaster. remodel (e) kitchen & bath. new driveway, driveway entrance, curb & rear deck. | $500,000 |
| Aug 10, 2018 | Completed final sign-off Jun 2019 | 146 Flood Av | 1st fl. remove post in garage, 2nd fl. remodel kitchen remove interior wall, add new bathroom, add new doors, add (n) skylightDetails
1st fl. remove post in garage, 2nd fl. remodel kitchen remove interior wall, add new bathroom, add new doors, add (n) skylight | $110,000 |
| Jun 18, 2018 | Completed final sign-off Nov 2018 | 59 Newton St | remodel (e) one kitchen and one bath, same footprint,no structural changesDetails
remodel (e) one kitchen and one bath, same footprint,no structural changes | $60,000 |
| Apr 19, 2017 | Completed final sign-off Jul 2017 | 108 Bennington St | remodel full bath, remodel powder room laundry, move kitchen door. relocate 2 windows.Details
remodel full bath, remodel powder room laundry, move kitchen door. relocate 2 windows. | $35,000 |
| Mar 10, 2015 | Completed final sign-off Aug 2015 | 971 Page St | remodel kitchen: new cabinets, counters, led lights. no walls to be moved. finishes and fixturesDetails
remodel kitchen: new cabinets, counters, led lights. no walls to be moved. finishes and fixtures | $70,000 |
| Sep 7, 2010 | Completed final sign-off Nov 2011 | 440 Laidley St | remodel (e) kitchen in same footprint. replace seven (7) existing single glaze windows with new marvin windows. install one new skylight.Details
remodel (e) kitchen in same footprint. replace seven (7) existing single glaze windows with new marvin windows. install one new skylight. | $95,000 |
| Apr 4, 2000 | Completed final sign-off Oct 2000 | 150 Joost Av | remodel kitchen,new half bath & change windowDetails
remodel kitchen,new half bath & change window | $32,000 |