Back to bathroom remodel contractors
Wilkinson Design & Construction, Inc.
- Based in
- San Rafael
- On San Francisco permits
- Mar 2000 to Nov 2025
- Last 24 months
- 3 permits filed
52 permits since 2000: 41 completed, 2 in progress, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2025 | In progress issued Nov 2025 | 1447 Jefferson St | remodel existing kitchen and bathroom. tub to shower conversion. all fixtures in same locations. change and replace 1 patio door in garden area. non street visible.Details
remodel existing kitchen and bathroom. tub to shower conversion. all fixtures in same locations. change and replace 1 patio door in garden area. non street visible. | $53,000 |
| May 12, 2025 | Completed final sign-off Jul 2025 | 971 Page St | remodel (e) first floor bathroom in kind. leave (e) window. no structural changes.Details
remodel (e) first floor bathroom in kind. leave (e) window. no structural changes. | $32,000 |
| Aug 10, 2022 | Completed final sign-off Mar 2023 | 1362 26th Av | remodel e kitchen in kind, no structrual changes same foot print. remodel e bath. no structural changes. all work cosmeticDetails
remodel e kitchen in kind, no structrual changes same foot print. remodel e bath. no structural changes. all work cosmetic | $95,000 |
| May 3, 2019 | Completed final sign-off Jul 2025 | 10 Curtis St | horizontal addition. create habitable space below (e) kitchen & office. excavate lower level. new laundry room. new yoga room, new spa, new wine room, new dumbwaster. remodel (e) kitchen & bath. new driveway, driveway entrance, curb & rear deck.Details
horizontal addition. create habitable space below (e) kitchen & office. excavate lower level. new laundry room. new yoga room, new spa, new wine room, new dumbwaster. remodel (e) kitchen & bath. new driveway, driveway entrance, curb & rear deck. | $500,000 |
| Aug 10, 2018 | Completed final sign-off Jun 2019 | 146 Flood Av | 1st fl. remove post in garage, 2nd fl. remodel kitchen remove interior wall, add new bathroom, add new doors, add (n) skylightDetails
1st fl. remove post in garage, 2nd fl. remodel kitchen remove interior wall, add new bathroom, add new doors, add (n) skylight | $110,000 |
| Jun 18, 2018 | Completed final sign-off Nov 2018 | 59 Newton St | remodel (e) one kitchen and one bath, same footprint,no structural changesDetails
remodel (e) one kitchen and one bath, same footprint,no structural changes | $60,000 |
| Apr 19, 2017 | Completed final sign-off Jul 2017 | 108 Bennington St | remodel full bath, remodel powder room laundry, move kitchen door. relocate 2 windows.Details
remodel full bath, remodel powder room laundry, move kitchen door. relocate 2 windows. | $35,000 |
| Mar 12, 2015 | Completed final sign-off Dec 2015 | 1362 26th Av | to comply with complaint 201531314. basement remodel as per plans. install new bedroom, bathroom and music room lower floor 18"Details
to comply with complaint 201531314. basement remodel as per plans. install new bedroom, bathroom and music room lower floor 18" | $160,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2015 | 150 Joost Av | remodel 2 bathrooms: replace shower and floor. leave all fixtures in current locations.Details
remodel 2 bathrooms: replace shower and floor. leave all fixtures in current locations. | $12,000 |
| Sep 27, 2011 | Completed final sign-off Nov 2011 | 440 Laidley St | remodel the (e) master bath in the same footprint. no exterior changes.Details
remodel the (e) master bath in the same footprint. no exterior changes. | $15,000 |
| Sep 22, 2010 | Expired or cancelled expired Oct 2013 | 365 Wawona St | remodel existing bath, new toilet, new shower tile, new vanity, new floor tile, new bath fan, replace all sheetrock, insulate wall r-13, ceiling r-30. all work in kind on 2nd floor.Details
remodel existing bath, new toilet, new shower tile, new vanity, new floor tile, new bath fan, replace all sheetrock, insulate wall r-13, ceiling r-30. all work in kind on 2nd floor. | $13,000 |
| Aug 21, 2002 | Completed final sign-off Sep 2002 | 150 Joost Av | add master bathDetails
add master bath | $12,000 |
| Apr 11, 2002 | Completed final sign-off May 2002 | 147 Divisadero St | remodel (e) full bath, (n) fixtures non structural (unit 147)Details
remodel (e) full bath, (n) fixtures non structural (unit 147) | $11,000 |
| Apr 4, 2000 | Completed final sign-off Oct 2000 | 150 Joost Av | remodel kitchen,new half bath & change windowDetails
remodel kitchen,new half bath & change window | $32,000 |